Permit Support Document FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
INIi r Transmittal Letter
I ]c n li i} 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: Allyson Armstrong DATE RECEIVED:DEPT: BUILDING DIVISION KtUEIVED
FROM: Matt Weatherdon/Val Howland APR 27 2022
CITY OF TIGARD
COMPANY: Chad E.Davis Construction LLC BUILDING DIVISION
PHONE: 503-357-8587 B__""-'-'
EMAIL: ValH@chadedavisconstruction.com
RE: 15323 SW Silkwood Court MST2021-00527
• (Site Address) (Permit Number)
Bull Mountain Summit—Lot 7
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description: .'
Additional set(s) of plans. 3 copies Revisions:
Cross section(s)and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain):
REMARKS: Submitting revisions posted for Bull Mountain Summit Lot 7-15323 SW Silkwood Court(MST2021-00527)
3 copies of each document is attached here.
FOR O FICE USE ONLY ',i1
Routed to Permit Technic' n: D �/,- a-a-- Initials: /�f'/'r
Fees Due: El Yes No Fee Descri ion: Amount Due:
\... ti 6-:1—‘----- $
$ PG---
Special
Instructions:
Reprint Permit(per PE): ❑ Yes o ❑ Done
Applicant Notified: Date: <72?/L-,, Initial • r\
1.1P4 q
City of Tigard
MI
TIGARD
RECEIVED
April 4, 2022 APR 2 7 2027
CITY OF TIGARD
RE: Bull Mountain Summit—Lot 7 BUILDING DIVISION
Project Information
Building Permit: MST2021-00527 Construction Type: VB
Address: 15323 SW Silkwood Ct. Occupancy Types: R3
Area: Stories:
The plan review was performed under the Oregon Residential Specialty Code (ORSC) 2021 edition.
The submitted plans have been reviewed and the following information is required prior to issuance
of the permit.
Please see correction responses to each question provided in red.
1. Select Additional Measure from Table N1101.1(2) & page 1 of plan.
Additional Measure 1.
2. Duct work—Duct note page 2-TYPICAL R-8 Duct work located in unconditioned spaces are
to be buried or wrapped in R-19 per the BCD Technical Bulletin.
https://www.oregon.gov/bcd/codes-stand/Documents/res-techb-whole-house-
ventilation.pdf
House plans have been updated to meet this requirement.
3. Provide Balanced Whole-House Mechanical Ventilation per M1505.4.
https://www.oregon.gov/bcd/codes-stand/Documents/res-techb-whole-house-
ventilation.pdf
House plans have been updated to meet this requirement.
4. The Mechanical permit application only has 1 gas fireplace selected but the plan shows 2.
Please confirm you are installing the optional outdoor fireplace.
Yes, 2 gas fireplaces will be installed. Please update the Mechanical permit application for
this lot to show 2.