Loading...
Permit Support Document 5. Please clarify how many fuel lines will be installed and what appliances they will serve. The bottom of the machinal permit application was not filled out. I am counting 5 but need to confirm. Fuel piping=4 2—Fireplace 1—Range 1—Furnace Water Heater will be electric. 6. Please advise which room is to be the 4th bedroom? Building permit application has 4 marked but the plan shows 3+Den+Bonus. Bedrooms=4,+ Den 7. The low profile 4/12 pitch roof does not allow for enough room at the inside face of the exterior wall at the top plan to meet the minimum R-21 insulation requirement. How do you intent to meet this requirement. See Table N1101.1(1) Note f. Please see attached typical detail on updated house plans. Please let me know if you have any questions. Thank you, Allyson Armstrong 503-718-8137 Agnes Lindor From: Agnes Lindor Sent: Wednesday, December 15, 2021 2:32 PM To: valh@chaddavisconstruction.com Cc: Trent Brickey; #Building Permit Technicians Subject: Bull Mountain Summit Lots 1-4 and 7-11 Attachments: SUB2020-00002 Bull Mountain Conditions 12-15-2021.pdf Good afternoon- These permits have been placed in approved but not release status until the plat has been recorded and the remaining conditions required prior to commencing site work have been met (condition 28). Please see attached condition report. Agnes Lindor I Associate Planner City of Tigard I Community Development 13125 SW Hall Boulevard Tigard, Oregon 97223 Phone: 503.718.2429 Email:AgnesL@tigard-or.gov 1