Permit Support Document FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
111 Transmittal Letter
I I Ci A RP 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: Allyson Armstrong DATE RECEIVED:
DEPT: BUILDING DIVISION RECEIVED
FROM: Matt Weatherdon/Val Howland APR 2 5 2022
COMPANY: Chad E. Davis Construction LLC CITY OF T IGARD
BUILDING DIV15ION —,
PHONE: 503-357-8587
EMAIL: ValH@chadedavisconstruction.com
RE: 15382 SW Silkwood Ct. MST2021-00525
(Site Address) (Permit Number)
Bull Mountain Summit—Lot 3
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: [or-Ror -1 Description:
Additional set(s) of plans. 3 copies Revisions:
Cross section(s)and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain):
REMARKS: Submitting revisions posted for Bull Mountain Summit Lot 3-15382 SW Sllkwood Ct.(MST2021-00525)
3 copies of each document is attached here.
FO OFFICE USE ONLY
Routed to Permit Technics ,E crate: 2Fe ZZ Initials:
Fees Due: El Yes No✓ Fee Des ription: Amount Due:
) (_,) C ss
$
Special
Instructions:
Reprint Permit(per PE): ❑Yes No ❑ Done
Applicant Notified: Date: Initials:
PIP
.14 City of Tigard
TIGARD
March 31, 2022 RECEIVED
APR 2 5 2022
RE: Bull Mountain Summit—Lot 3 CITY OF!CARD
BUILDING DIVISION
Project Information
Building Permit: MST2021-00525 Construction Type:VB
Address: 15382 SW Silkwood Ct. Occupancy Types: R3
Area: Stories:
The plan review was performed under the Oregon Residential Specialty Code (ORSC) 2021 edition.
The submitted plans have been reviewed and the following information is required prior to issuance
of the permit.
Please see correction responses to each question provided in red.
1. Clarify footing size not called out 2 places below demising wall between great room and
stairs.
House plans have been updated to meet this requirement.
2. Provide Balanced Whole-House Mechanical Ventilation M1505.4. See BCD Technical
Bulletin https://www.oregon.gov/bcd/codes-stand/Documents/res-techb-whole-house-
ventilation.pdf
House plans have been updated to meet this requirement.
3. Update Lateral Bracing Plan. 2008 Alternate Method no longer accepted. See
https://www.oregon.gov/bcd/codes-stand/Documents/sam-13-01-bracing.pdf
House plans have been updated to meet this requirement.
4. Select which Additional Measure you are installing from Table N1101.1(2)on page 5.
Additional Measure 1.
5. Please clarify the number of fuel lines being installed and what appliances they serve.
Fuel piping=4
2—Fireplace
1—Range
1—Furnace
Water Heater will be electric.
Agnes Lindor
From: Agnes Lindor
Sent: Wednesday, December 15, 2021 2:32 PM
To: valh@chaddavisconstruction.com
Cc: Trent Brickey; #Building Permit Technicians
Subject: Bull Mountain Summit Lots 1-4 and 7-11
Attachments: SUB2020-00002 Bull Mountain Conditions 12-15-2021.pdf
Good afternoon-
These permits have been placed in approved but not release status until the plat has been recorded and the remaining
conditions required prior to commencing site work have been met(condition 28). Please see attached condition report.
Agnes Lindor I Associate Planner
City of Tigard I Community Development
13125 SW Hall Boulevard
Tigard, Oregon 97223
Phone: 503.718.2429
Email:AgnesL@tigard-or.gov
1