Loading...
Permit Support Document FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 111 Transmittal Letter I I Ci A RP 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Allyson Armstrong DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED FROM: Matt Weatherdon/Val Howland APR 2 5 2022 COMPANY: Chad E. Davis Construction LLC CITY OF T IGARD BUILDING DIV15ION —, PHONE: 503-357-8587 EMAIL: ValH@chadedavisconstruction.com RE: 15382 SW Silkwood Ct. MST2021-00525 (Site Address) (Permit Number) Bull Mountain Summit—Lot 3 (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: [or-Ror -1 Description: Additional set(s) of plans. 3 copies Revisions: Cross section(s)and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: Submitting revisions posted for Bull Mountain Summit Lot 3-15382 SW Sllkwood Ct.(MST2021-00525) 3 copies of each document is attached here. FO OFFICE USE ONLY Routed to Permit Technics ,E crate: 2Fe ZZ Initials: Fees Due: El Yes No✓ Fee Des ription: Amount Due: ) (_,) C ss $ Special Instructions: Reprint Permit(per PE): ❑Yes No ❑ Done Applicant Notified: Date: Initials: PIP .14 City of Tigard TIGARD March 31, 2022 RECEIVED APR 2 5 2022 RE: Bull Mountain Summit—Lot 3 CITY OF!CARD BUILDING DIVISION Project Information Building Permit: MST2021-00525 Construction Type:VB Address: 15382 SW Silkwood Ct. Occupancy Types: R3 Area: Stories: The plan review was performed under the Oregon Residential Specialty Code (ORSC) 2021 edition. The submitted plans have been reviewed and the following information is required prior to issuance of the permit. Please see correction responses to each question provided in red. 1. Clarify footing size not called out 2 places below demising wall between great room and stairs. House plans have been updated to meet this requirement. 2. Provide Balanced Whole-House Mechanical Ventilation M1505.4. See BCD Technical Bulletin https://www.oregon.gov/bcd/codes-stand/Documents/res-techb-whole-house- ventilation.pdf House plans have been updated to meet this requirement. 3. Update Lateral Bracing Plan. 2008 Alternate Method no longer accepted. See https://www.oregon.gov/bcd/codes-stand/Documents/sam-13-01-bracing.pdf House plans have been updated to meet this requirement. 4. Select which Additional Measure you are installing from Table N1101.1(2)on page 5. Additional Measure 1. 5. Please clarify the number of fuel lines being installed and what appliances they serve. Fuel piping=4 2—Fireplace 1—Range 1—Furnace Water Heater will be electric. Agnes Lindor From: Agnes Lindor Sent: Wednesday, December 15, 2021 2:32 PM To: valh@chaddavisconstruction.com Cc: Trent Brickey; #Building Permit Technicians Subject: Bull Mountain Summit Lots 1-4 and 7-11 Attachments: SUB2020-00002 Bull Mountain Conditions 12-15-2021.pdf Good afternoon- These permits have been placed in approved but not release status until the plat has been recorded and the remaining conditions required prior to commencing site work have been met(condition 28). Please see attached condition report. Agnes Lindor I Associate Planner City of Tigard I Community Development 13125 SW Hall Boulevard Tigard, Oregon 97223 Phone: 503.718.2429 Email:AgnesL@tigard-or.gov 1