Loading...
Permit ` CITY OF TIGARD BUILDING PERMIT 1 COMMUNITY DEVELOPMENT Perm it#:: BUP2022-00112 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 5/18/2022 Parcel: 2S 101 DB00100 Jurisdiction: Tigard Site address: 7320 SW HUNZIKER RD 204 Project: Discovery Counseling Subdivision: None Lot: None Project Description: Expanding office and acquiring suite 202. Contractor: ROBINSON CONSTRUCTION CO Owner: HILLTOP BUSINESS CENTER LLC 8060 NE WALKER RD 9430 NW KAISER RD HILLSBORO, OR 97124-9321 PORTLAND, OR 97231 PHONE: 503-226-1285 PHONE: FAX: 503-645-5397 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 05/17/2022 $910.17 Occupancy Grp: B Occupancy Load: 46 Demolition 12/o State Surcharge-Building 05/17/2022 $109.22 Dwelling Units: 0 Plan Review 05/04/2022 $591.61 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 05/17/2022 $110.00 Bedrooms: 0 Bathrooms: 0 ' Plan Review-Fire Life Safety 05/17/2022 $364.07 Value: $74,000 Info Process/Archiving-Lg$2.00(over 05/17/2022 $10.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $2,095.07 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility N• :.o nter. <hose : e set forth in OAR 952-001-0010 through 0 �95�2-00001-0090. You may obtain a copy of the rules or direct questions to OUNC by callin! • . 32 •:7 or 1.800,33 Issued By: L✓✓ w I��C J�k �,IIfI/A� Permittee Signature: ' if 'Call 503.639.4175 by7:00 a.m.for the next available inspection •,te. P This permit card shall be kept in a conspicuous place on the job site until corn• tlon of e project. Approved plans are required on the job site at the time of each inspection. J Building Permit Application 6- 3 Zf. 2 Commercial RECEIVED FOR OFFICE USE ONLY Received �. City of Tigard Date/By: 0�11 Permit Now((�ZCL�.2 tjp/12- 14 't 13125 SW Hall Blvd.,Tigard,OR 97223 _ Phone: 503-718-2439 Fax: 503-598-19`IAR 2 1 2022 Plan Review . ...a...7 'e 7 Date/By: JRelated Permit: T l GARD Inspection Line: 503-639-4175 Date Ready/By: ® Sec Page 2 for Internet: www.tigard-or.gov CITY OF TIGARD Notificd/Method: 1l tp/,"} e*{ �� Supplemental Information BUILDING DIVISION de �J �! TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ ❑ I-and 2-family dwelling ®Commercial/industrial ElAccessory building El Multi-familyNumber of bedrooms: El Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 7320 sw Hunziker New dwelling area: square feet City/State/ZIP: Tigard,Oregon 97223 Garage/carport area: square feet Suite/bldg./apt.#Suite 202&204 Project name: Discover Counseling Expansion Covered porch area: square feet Cross street/directions to job site: Discover Counseling Expansion Deck area: square feet Sw 72nd Ave/sw Hunziker Rd Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST', Subdivision: Lot#:25101DB00100 Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel#: 25101DB00100 equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ 74,000 Discovery Counseling,currently in Suite 704 is expanding their existing office,and acquiring Suite 202.Both suites are group B occupancy and will Existing building area: 1,830 square feet continue to be used as an office.The combined area is 4,600 SF. New building area: 2,770 square feet 0 PROPERTY OWNER ® TENANT Number of stories: 3 Name: Discover Counseling Type of construction: V-B Address: 7320 sw Hunziker Rd,Suite 204 Occupancy groups: B City/State/ZIP: Tigard,Oregon 97223 Existing: B Phone:( ) Fax:( ) New: B ® APPLICANT 12 CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: CIDA Structural plan review fee(or deposit): 57f 4 ( Contact name: JEN HAWKINS FLS plan review fee(if applicable): Address: 15895 SW 72ND AVE,SUITE 200 • City/State/ZIP: PORTLAND, OR 97224 Total fees due upon application: Amount received: Phone:( 503)226.1285 Fax::( 503)226.1670 E-mail: JENH@CIDAINC.COM PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name: ROBINSON CONSTRUCTION CO. Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:8060 NE WALKER RD Solar Installation Specialty Code checklist. Permit fee(includes plan review City/State/ZIP: HILLSBORO,OR 97124 $180.00 and administrative fees): Phone:( 503)209.8545 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lie.: 63147 f/'y"yJ/��/(� j 7C Total fee due upon application: $201.60 Authorized signature: 4 i �{AII.A J This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: JENNI ER HAWKINS Date: 03/15/2022 * Fee methodology set byTri-County Building Industry Service Board. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM WEB) 1I5-63 7 • , S1. City of Tigard ••CO[VIMUNITY DEVELOPMENT DEPARTMENT Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 -- J City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number LI zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit- based on valuation of project. 1\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 • + City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT lig q Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire &Rescue), if applicable. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard I II COMMUNITY DEVELOPMENT DEPARTMENT 'Pt TIGARD Building Permit Review — Commercial - With Land Use Building Permit #: �,�(- ,(PZOZ-2-00 (()-- Site Address: 1320 6LAi tau n-z Suite/Bldg#: 2oy Project Name: V 1Sc-c,4 2.1GZ Coo PS-e %h.)(.47 (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: '"rfi • erify site address/suite# exists and active in permit syste/mm.. ❑ River Terrace Neighborhood: ❑ Yes I^ -No nlld Use Case#: rn\N\Y L 2 - 0:131C1.- aInsy.atch Approved Land Use: IV-Site Plan 0 Landscape Plan 0 Other: 0 Urban Forestry Plan 0 Elevation Plan Building Height: Maximum Height Actual Height 1 Conditions Met: 0 Prior to Submittal ❑ Prior to Permit Issuance it 1 Business License: Exists: 0 Yes ❑ No,applicant was provided a business license application dPublic Facilities Improvement (PFI) Permit: Required: 0 Yes, applicant was notified /No Applied For: 0 Yes 0 No,stop intake Notes: Sty I'1 W I L-t, AC&Ul 12C /EVAnl> lv Sol vE 2_ Approved by Planning: ,G-- - Date: t/l2 I/t Z Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: ❑ •Approved 0 Not Approved Building Permit Submittal Original Submittal Date: e3/0z Site Plans: # T Building Plans: # 5 Building Permit#: LVEnter building permit#above.Workflow Routing: IVPlanning Engineering [Permit ,�Coordinator I ' Building Workflow Sign-off: ign-off for Planning(include notes from planning review) Route Application Documents: lid Building. original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: 4//2/,2Z I:\Building\Fonns\BldgPermitRvw_COM_W ithLandUse_111819.docx eering Review ❑ Slo t building pad: ❑ PFI Perms • ❑ Conditions "Met r to issuance of building permit ElEasements (encroachments *et engineering conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity Facility. Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: \ es ❑ No LIDA Facility on lot: D Yes ❑ No Add Fee: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved ❑ Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved ❑ Not Approved Permit Coordinator Review 0 Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ,21 SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes 0 N/A NICa►C, Q Tigard Trans SDC: 0 Yes V N/A G� Parks SDC: 0 Yes , ' N/A V� LIDA Fee: 0 Yes N/A OK to Issue Permit Approved by Permit Coordinator: Date: 5 j1( (2022 I:1Building\Forms1BldgPennitRvw_COM_W ithLandUse_111819.docx Sean Vermilya From: Sean Vermilya Sent: Monday, March 28, 2022 2:10 PM To: Jennifer Hawkins Cc: Nikki Tuas Agnes Lindor;Jenny McGinnis;#Building Permit Technicians Subject: RE: Discov Counseling at 7320 SW Hunziker Hello Jennifer, Because Discover Counseling is currently seeing patients on site,the use is considered a medical office rather than a standard office.As is referenced in Table 18.410.3 in the city's parking standards chapter, medical offices have a higher parking standard than a standard office. Because the proposed use is expanding into a new space which previously had a lower parking standard,a Minor Modification land use application is required before we can process this permit application. I've included instructions below on how to submit for this application. If you have any questions about the application process or timelines, I am happy to assist. Sincerely, Sean Sean Vermilya Assistant Planner City of Tigard Planning Division I Community Development 13125 SW Hall Blvd. Tigard, OR 97223 Phone: (503) 718-2438 E-mail: sean.vermilyaCa)tigard-or.gov Type 1 Minor Modification (MMD) A Type 1 MMD application needs all of the following submittal elements sent to TigardPlannerOnDuty(a,tigard- or.gov in order to be considered complete: • Completed application form with property owner signature and applicant signature: http://www.tigard- or.gov/city hall/departments/CommunityDevelopment/Master Land Use Application.pdf • Copy of the property deed • Narrative o Detailed response to the applicable code criteria in Community Development Code (CDC) 18.765.060. o Detailed summary of your proposal o If you are proposing changes to add or remove parking stalls in the parking lot... • State the number of existing off-street parking spaces and state the number of parking spaces to be added or removed • Address the applicable code criteria in Community Development Code (CDC) 18.410. o If the proposed business has a higher parking intensity than the previous business... 1