Loading...
Permit .1YA�YYW14Fit{NtlifitttN441.4itifitiiii II ... .. i CITY OF TIGARD MECHANICAL PERMIT = COMMUNITY DEVELOPMENT MECHANICAL MEC2022-00250 Ti C;A Rt:7 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 4/25/2022 Parcel: 1 S126CC00200 Jurisdiction: Tigard Site address: 10065 SW CASCADE AVE Project: Tesla Subdivision: None Lot: None Project Description: Gas plumbing for RTU and dryer Contractor: R A WARNER PLUMBING Owner: 10065 SWC LLC PO BOX 820785 BY ALSTON &BIRD LLP VANCOUVER, WA 98682 BANK OF AMERICA PLAZA 101 SOUTH TRYON ST STE 4000 CHARLOTTE, NC 28280 PHONE: 360-772-2490 PHONE: FAX: 360-263-5354 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 04/21/2022 $191.86 Class of Work: ALT Type of Const: VA Plan Review 04/21/2022 $47.97 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 04/21/2022 $23.02 Stories: Info Process/Archiving-Lg$2.00(over 04/21/2022 $10.00 11x17) Project Valuation: $4,500.00 Info Process/Archiving-Sm$0.50(up to 04/21/2022 $4.50 11x17) Fuel Air Handlers Fuel Types: Natural Gas Units< 10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $277.35 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules 0-4-2j. . Issued By: Permittee Signature: re --"ep,..". ...„. //1/91. Ce,,,e-r Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. E3— 2 22. Mechanical Permit Applicatiot}.j, Fol�of ui FSI.ONLY ECE��� City of Tigard �- eid 0 20 2 C� _00250 Datate/ByBy J Y: -fill.. Permit No.: e 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review Phone: 503.718.2439 Fax: 503.598.1960 MAR 2 3 2022 y -)a;- - Other Permit:�P7/n 7_oo©O Date By: e-v Cb TIGARD Inspection Line: 503.639.4175 Date Ready/By: / ' Juris: El See Page 2 for Internet: www.tigard-or.gov CITY OF TIGARD Notified/Method: / ' -r1 /- Supplemental Information BURPING n fl f),r"<'I',74', ' `t�.* }'r�"tC�it{� - 1���71f TYPE OF WORK t MMERCiAL FEE* SCHEDULE - USE CHECKLIST Mechanical permit fees*are based on the value of the work ❑New construction ®Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit. Value:$ 4,500.00 CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES* ❑ I-and 2-family dwelling IN Commercial/industrial 0 Accessory building For special information use checklist. ❑Multi-family 0 Master builder 0 Other: Description Qty. Ea. Total JOB SITE INFORMATION AND LOCATION Heating/cooling: Air conditioning 46.75 Job site address: 10065 SW Cascade Ave. Furnace I00,000 BTU(ducts/vents) 46.75 City/State/ZIP:Tigard,OR 97223 Furnace 100,000+BTU(ducts/vents) 54.91 Heat pump 61.06 Suite/bldg./apt.no.: 1 Project name: Tesla-TI Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK Gas fireplace/insert 33.39 Flue vent for water heater or gas Gas plumbing for RTU and dryer fireplace 23.32 Reference building permit#BUP2022-00008 Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 0 PROPERTY OWNER I 0 TENANT Other: 23.32 Environmental exhaust and ventilation: Name: Range hood/other kitchen equipment 33.39 Address: Clothes dryer exhaust 33.39 City/State/ZIP: Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( ) I Fax:( ) Attic/crawlspace fans 23.32 ® APPLICANT 0 CONTACT PERSON Other: 23.32 Fuel piping: Business name: RA Warner Plumbing Co. $14.15 for first four;$4.03 for each additional Contact name: Jerime Maloney Furnace,etc. Address: PO Box 493 Gas heat pump Wall/suspended/unit heater City/State/ZIP:Camas, WA 98607 Water heater Phone:(360 )772-2490 Fax: :(360 )210-4739 Fireplace Range F-mail:rawarner lumbing(a,gmail.com Barbecue CONTRACTOR Clothes dryer(gas) 1 14.15 Business name: Warner Plumbing Co. other RTU 1 14.15 MECHANICAL PERMIT FEES* Address:PO Box 4 3 Subtotal 220.16 City/State/ZIP: Camas, WA 98607 Minimum permit fee($90.00) Plan review(25%of permit fee) Phone:(360 ) 772-2490 Fax:( 360 ) 210-4739 State surcharge(12%of permit fee) CCB lic.: 151329 TOTAL PERMIT FEE Digitally signed by Rhonda Boehm This permit application expires if a permit is not ob' Rhonda Boehm DN:sn�honda Roohm,o=RA womb,clumbing co,os, days after it has been accepted as cor Authorized signature: mail=rawamerp1um7:31-0mai.cnm,c=us Date:2o22.03 o913:ne1-oe•o0• Fee methodology set by Tri-County Building Ir / Print name: Rhonda Boehm Date:3/8/2022 1 ABuildingVPermits\MEC_PermmApp_0401 I 3.doc 440-4617T(I1/02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial &Multi-Family Fee Schedule: Total Valuation: Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. \Building\Permits\MEC_PermitApp_040113.doc 2 , City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT I . TIGARD Building Permit Review — Commercial - No Land Use r. yr Building Permit #: N1 2022-tO26 Site Address: G(,a i S 5w (c(S( cx ot. A-cpe Suite/Bldg#: Project Name: T-e-.5 t(,( (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: G'as lU(MIA -r 1i) dam � 2 ' �— l, crf(4 c-e vi CrATKr v-v i {— 2 — 0000g Existing Business Activity: ' -e S g Proposed Business Activity: -z- -- Verify site address/suite# exists and active in permit system. River Terrace Neighborhood: ❑ Yes gJ No itio Zoning. /"L U a Permitted Use: 0,Yes ❑ No ❑ Spec Space p Confirm no land use required. pir Business License: Exists: 7Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: 4J4 Date: 3/22 ZAZ2 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 63/2 /2. Site Plans: # 2- Building Plans: # 2. Building Permit#: [enter building permit#above. Workflow Routing: Manning ❑ Permit Coordinator IrBuilding Workflow Sign-off: Sign-off for Planning(include notes from planning review) Route Application Documents: [Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: . , By Permit Technician: j Date: Dj/3J/202,Z_ I:\Building\Forms\BldgPermitRvw_COM NoLandUse_111819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: 1:\Building\Forms\B1dgPermitRvw_COM NoLandUse_111819.docx FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT _ N Transmittal Lett er T i _,n r:I) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Building Codes Division DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED FROM: Maggie Ludden for TML International LLC MAR 3 12022 COMPANY: TML International LLC CITY OF TIGARD BUILDING DIVISION By: �� PHONE: (800)928-4785 EMAIL: permit@infinitysolarusa.com RE: 14270 Sw 100th Ave MST2021-00545 (Site Address) (Permit Number) Solar Install-KJWilson (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s) of plans. X Revisions: See remarks below Cross section(s)and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other(explain): REMARKS: The changes that were made are as follows: a minor layout change and inverter type change FOR OF ICE USE ONLY Routed to Permit Technici L/ ��7 �- Initials: / fl Fees Due: El Yes No Fee Descripti n: Amount Due: - 6 c, ;a_....,....-- i\J $ Special Instructions: A.------- Reprint Permit(per PE): El Yes No ❑ Done Applicant Notified: Date: 41//7/�L Initials: