PFI2022-00173 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12022-00173
Date Issued: 05/03/2022
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Parcel: SEG3965
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE Job#M2685014
Project Description: SEG 3965/Contractor to trench and install conduit and vaults. PGE to pull wire through contracter
installed conduit. PGE to install/remove facilities.Work is for new subdivision
Class of Work: FEES
Type 1 -Utilities (gas, electric,data) Description Date Amount
Total
Owner:
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tigard-or.gov to schedule inspections online.
Contractor:
PHONE:
Applicant:
JEREMY SPRAGUE
2213 SW 153RD DR
BEAVERTON, 97003
PHONE: 5036725446
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant See application
Signature:
�,�f
Issued By: Ry 2y. V"wq'"
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12022-00173
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any
agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and
violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and
suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc.shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the "Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06 -TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.
Traffic control devices, flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively
maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area
wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140 (Tri-Met)and
503-431-2345 (Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at
each end of the construction area 72 hours(min.) before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m. to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City
Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the
City Engineer.
PFI_Utilities 12 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If
you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work (pothole before
digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the
applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with
affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17- REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary,as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection,
and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22- DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2) persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain
or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility,shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
PFI_Utilities 31 -OTHER Applied Notice
Other
City of Tigard PFI#: 2022-00173
C ENGINEERING DEPARThEENT
Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION
PGE Job # M2685014 TYPE OF WORD
Project name: B TYPE 1—Franchise Utility Fork
Contractor to trench and install conduit and vaults. performed by NWN,PGE, of utility
Brief description of project: agency
PGE to pull wire through contractor installed conduit. Cl TYPE 2_ROW Sidewalk/Driveway/Sewer
PGE to install/remove facilities. Work is for new subdivision. Work performed for the purpose of.
- Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral installation and
Location (address if available): 15252 SW Roy Rogers Rd main lune tap
❑ TYPE 3—Full Scale Development We&
Sherwood, OR 97140 performed with land use approval which
includes any of die following:
• Subdivisions or Partitions
APPLICANT INFORMATION - Streetwidening
Name: PGE [Submitted by Jeremy Sprague] - Mainline installation for sanitary sewer,
stone sewer, Tigard water, and Tigard
riadingaddress: 2213 SW 153rd Dr water service area
city/stare: Beaverton/OR Zip: 97003 ❑ TYPE4—Smd1Ce11Teclmology
Phone:
(503) 672-5446 ❑ TYPE 5—Tigard Triangle
Email: crewcoordination western@pgn.comPhone: (503) 464-7777 NOTE: Type 1 and 2 applications may be
Contact name: Penka Tantilova emailed to rowperm is tigard-or.gov.
Phone: (503) 672-5412 Ems: crewcoordination-western@pgn.com
CONTRACTOR INFORMATION Fil Same as applicant
Name: MOORE EXCAVATION INC CCB Number: 28397
Mailing address: PO Box 789 City/State: Fairview/OR Zip: 97024
Phone: (503)329-5853 Email bryan.brosius@meigroup.eom
ENGINEER INFORMATION
Name:
Mailing address: City/State: Zip:
Phone: Email:
ADDITIONAL INFORMATION
Estimated value of work is required(if over S5,000):$ (within the public right-of-way)
Is work related to a LAND USE DECISION? Oyes 0 No Case number.
City of Tigard - 13125 SW Hall Blvd. • Tigard,Oregon 97223 - www.figud-or.gov • 503-718-2421 - Page I of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TRIC 15.04.140.
* with the exception of a utility operating purmant to a valid fiwichise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a a-Litten authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signattue on the application.
I,the applicant,certify that:
• To the best of my knowledge,all die information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise die rights granted in accordance with the terms and subject to all the
conditions and limitations of die approval,
�{,4A� 5!L-2 tem Jeremy Sprague 04/28/2022
App A nt's or uthorized agent's signature Print name Date
Property owners signature (if required) Print name Date
Case No: PF12022-00173 Permit fee: _ Received by: NT Date: 4/28/22
Approved by: Date:
S��1�� Notified by: 5Py Date:'�'L
City of Tigard • 1313;SW Hall Bh•d. • Tieard.Oregon 9-'?3 • alcvetigard-or.gox- • 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 100/6 of the Net PFI Pennit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FOR STAFF USE ONLY FOR STAFF USE ONLY
DETAILED '
, WIRELESS '
CHECKLIST REQUIREMENTS
Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal ❑ Dimensions
considered?(check all that apply-): ❑Small CeU ❑macro ❑ Street Name
❑ Site Address
How many install sites are proposed as part of this permit
application?
TYPE 3-Must provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
❑Public Right-of-Wap ❑Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineer's Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
City of Tigard 13125 S X'Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Patge3 of 4
Edge of Pavement
-'*- Ditch
n Stre/etlight I —•—.— .—.—.—.—r—.—
t
D-k, House
a
� I 1
I Existing H
Q I t= I Existing j
_>>1 Driveway
m� I vi I 1
vl vI Tn
l!1 Vag 1
L I j
G
Etdsfing Shop j
1
G Z..
Powerpole I 1 d
in
I I� 95' j
Foe Line —
o Pte,---------
� 1
iG 1 Fire Lant(FH)
� I I
' I
iI I Scale. 'I"=30'
� I I
TYPE 1 ANUITYPE 2:
MINIUM SKETCH REQUIREMENTS (Put N/A if not
� I I
� I I
� I �
pp
North arrokv Property lines&dimensions Existing utilities locations
(sewer,storm,water)
Street& street names All existing strictures
Proposed work Existing curb or edge of pavement Utility&street light poles
Existing S/W or D/W apron Slope of property Trees
City of Tigard • 13125 SR'Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov 9 503-718-2421 • Page 4 of 4
C. SUBDMUON LEGEND
. � 3 -.r url a.o ac lNaunro
a;
ca
1
,< - ;.�:' a •—
A
nova
f'I,� ,. .. � � �, (f-• •-'..tea.
I ,
N � '
a
r itri
w-r ME
,a
-
• 4u.11
1
:-1 _. r. - .a PARTIAL ':µ `Vi @E4
.gym
vv ma"m
..,.,..r t �'.- a ... �,.• t x^^�' .rel i �s�._
fAMam
- r ,`�•.' " .\ -i� it c`R'4s".. ` �• �i?e:
VICINITI MAP
Y yrs'
ISI 25 A TRANSFORMER SORVA TRANSFOP ft 50RVA TRANSFORMER
C IRU" 1350 2 RUN .350 -
ITO2.0v
- 200AMR
HWAC la.RR aaoAMr 1b4w
.n MP
106%o nor 2KFOCL
'
Cmr rpx N .'�s_
:
2.3W (LOT 23TAYnO 216) 011%O (LOT 0)
1,.1" E (LOT 2301 3.2VMor N6) (LOT
L23IAO232) T,02A AC M1Ot 19)
V KRIaTYYCaNOrIWlam16
�M
tlWrtlMYKMIMOfR2
p L f`yyi. � Tn.uPR
44:4�r. ra rat ,.
OM ".t^• ••• —...�� �T"Y If f4YTIq LOg11lNNNlMR Idl41.mo.
IraraRwnraReasaer'neeamro I.
r.e.urtn �
1 '.9niT.Rc ;'., AHI'DFVN11ON NQM THIS DFTmw MUSE
1
a 1 s—oraa_ eE MROaEo er GDE MOIFCT MANAGER FCC TA.aulce rvo cancan ro scnlE
I
• .iM. ssr..� .i5. .,.
Page 84 2011 Edition
Stationary Lane Closure with Flagging Diagram 320
Diagram 320 covers total closure of one lane of a two-lane. two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340 — Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4) should be used when
traffic queues extend beyond the initial advance warning sign.
B. When flagging near an intersection, the"Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4)sign is optional and should
be considered on high volume or high speed roads. or when extended
queues are expected.
Chapter 5 September 2016
2011 Edition Page 85
Stationary Lane Closure with Flagging Diagram 320
i
o
W �
11 LL
3
______________i I ; f le
I I
I I
I I
I ® I i I •
I 0 3
I po i I •
I �E I •
0v I'• �®
� I
I
I `
cc
spe
Y" V i<
Sian 5 ecln and Buffer Lane feet
RSad ertraan 5l 'eanar f I 1
• e c 50 W 200 200 100 75 100 550 950 350 11515 UO 500 500 500 270
55 2S0
60 MS
65700 700 700 325
70 565
September 2016 Chapter 5
Page 52 2011 Edition
Bicycle and Pedestrian Accommodation Diagrams
The following practices and details address the accommodation of bicycles
and pedestrians within work zones, The following detail drawings should be
incorporated, where appropriate, into the traffic control plan for any short
term work.
1. See Section 1.6—Bicycle and Pedestrian Considerations for additional
guidance.
2. Stay alert for pedestrians and bicycle traffic and accommodate safe
passage for them, as needed.
3. The work space should be protected from bicycle and pedestrian
intrusion by using barricades or closely-spaced channelizing devices.
4. Maintain access to transit stops or clearly close a transit stop using
barricades or channelizing devices.
Bicycle Accommodation Diagram 5-6
Bicycle Accommodation Principles:
1. If a significant volume of bicycles can be expected and work closes a
marked bicycle facility, or requires bicycles to share a travel lane,
install a "(Bicycle)ON ROADWAY" sign (CW 11-1)or the Bicycle
symbol (W11-1) sign with an "ON ROADWAY" (OBW1-5) rider, in
advance of the work area.
2. Install temporary signing off the paved shoulder, within the planter
(buffer)strip, or share the width needed between the shoulder and the
sidewalk, as available.
3. Signs are to remain in place until the surface is restored and the width
made available for bicycle use. See Diagram 5-6 for typical bicycle
' signing placement.
Sign Spacing and Buffer Lengths(feed
Potted Spedn`Bttw nSi ans "Buffer,'
Speed A B C Space
20 5o
_25 100 100 100 75
30 100
405 350 350 350 125
150
45 180
50 500 500 500 210
55 250
60 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 53
Bicycle Accommodation Diagram 5-6
I
I
I NOTES:
I • Bicycles on Roadway(CW11-1)sign should not
interrupt standard sequences. For example:
0 BE PREPARED TO STOP/Flagger Symbol
I
0 _LANE CLOSED AHEAD/Lane Ends
I Symbol
Xx
• Bicycles on Roadway sign typically follows ROAD
I WORK AHEAD sign and used as general warning.
I
I
I
I
I
I I
I � I
I I A
I I
I I
I I
I I�I I
I I
I I
I I
I I A
I I
I I
I I
B
I I
I I
I I� ON
I ROADWAY
I � I
I
I I C
I
I ROAD
M WORK
I• AHEAD
September 2016 Chanter 5