PFI2021-00451 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENJ C ) 1 fl
. Request for Permit Action
T I G A R I) 13125 SW Hall Blvd. •Tigard, Oregon 97223 • 503-718-2439 • www.tigard-or.gov
TO: CITY OF TIGARD
Building Division
13125 SW Hall Blvd.,Tigard,OR 97223
Phone: 503-718-2439 Fax: 503-598-1960 TigardBuildingPertnits@tigard-or.gov
FROM: ❑ Owner ❑ Applicant ❑ Contractor (City Staff
Check(I)one
REFUND OR Name:
INVOICE TO: (Business or Individual)
Mailing Address:
City/State/Zip:
Phone No.:
PLEASE TAKE ACTION FOR THE ITEM(S) CHECKED (1):
Dr CANCEL/VOID PERMIT APPLICATION.
❑ REFUND PERMIT FEES (attach copy of original receipt and provide explanation below).
❑ INVOICE FOR FEES DUE (attach case fee schedule and provide explanation below).
Permit#: ?FL Zazl- O045
Site Address or Parcel#: ( 0 OSB S'-v (giCn '(,L f'✓J
Project Name: WO 754s(L/
Subdivision Name: n /" Lot#: 11 ("—
EXPLANATION: PI) LjG..-f ;,,jr,rle Crde.Y
Signature: �t,tit,ti"""7 Date: /?/Z7/ZdZ,2_
Print Name: T- -I t (8 ri c./c4--ti
Refund Policy
1. The city's Community Development Director,Building Official or City Engineer may authorize the refund of:
• Any fee which was erroneously paid or collected.
• Not more than 80%of the application or plan review fee when an application is withdrawn or canceled before review effort
has been expended.
• Not more than 80%of the application or permit fee for issued permits prior to any inspection requests.
2. All refunds will be returned to the original payer in the form of a check via US postal service.
3. Please allow 3-4 weeks for processing refund requests.
FOR OFFICE USE ONLY
Route to Sys Admin: Date 1 t-11 V By Route to Records: Date By
Refund Processed: Date By Invoice Processed: Date By
Permit Canceled: Date 11\2\2Z By ) Parcel Tag Added: Date By
I:\Budding\Forms\RegPemitAction_1 51 .doc
City of Tigard J
�...,1 PFI#:
PFI2021-00451
IIIENGINEERING DEPARTMENT
TIGARD Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION
W0905614 TYPE OF WORK
Project name: 6 TYPE 1—Franchise Utility Work
Brief description of project: ZIPLY FIBER PROPOSES TO ACCESS Performed by NWN,PGE, or utility
acl.
MULTIPLE MH'S TO RAISE LIDS.MH 2 NEED TO CUT ASPHALT TO I$ TYPE 2—ROW Sidewalk/Driveway/Sewer
REACH,THEN RAISE LID.MH 12 COULD BE IN EITHER TWO PLACES- Work performed for the purpose of
NEED TO LOCATE. • Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral installation and
Location (address if available):
10855 SW CASCADE AVE TIGARD OR main line tap
❑ TYPE 3—Full Scale Development Work
performed with land use approval which
includes any of the following
• Subdivisions or Partitions
APPLICANT INFORMATION • Street widening
Name: ZIPLY FIBER • Mainline installation for sanitary sewer,
storm sewer, Tigard water, and Tigard
Mailing address: 6074 N DISCOVERY WAY STE 125 water service area
City/State: BOISE ID Zip: 83713 0 TYPE 4—Small Cell Technology
Phone:
208-576-4031 ❑ TYPE 5—Tigard Triangle
Email: Permitting@mountainitd.com Phone: NOTE: Type 1 and 2 applications may be
Contact name:
AN NA KARASEVA emailed to rowpermitsnn,tigard-or.gov.
Phone: Email:
CONTRACTOR INFORMATION 0 Same as applicant
Name: NORTHSKY COMM.ALTON PALMER CCB Number: 208747
Mailing address: 11818 SE MILL PLAIN BLVD STE 410 City/State: VANCOUVER WA Zip: 98684
Phone: 503-647-9991 Email: awpalmer@northskycomm.com
ENGINEER INFORMATION
Name: RUSSELL WELLS
Mailing address: 4155 SW CEDAR HILLS BLVD City/State: BEAVERTON OR zip: 97005
Phone: 503-643-1001 Email: russell.wells@ziply.com
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ 1,000 (within the public right-of-way)
Is work related to a LAND USE DECISION? 0 Yes G(No Case number:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant
axe different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application.
I,the applicant, certify that:
• To the best of my knowledge,all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
A vvvicaCctrai4eVet, ANNAKARASEVA 12/20/2021
Applicant's or authorized agent's signature Print name Date
Property owner's signature (if required) Print name Date
STAFF LSE ONLY
Case No: PFI2021-00451 Permit fee: 3V-\.,4V) Received by: HPollard Date: 12/20/21
Approved by: 7/ 7/ /3 Date: See'.eV Notified by: Date:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FOR STAFF USE ONLY FOR STAFF USE ONLY
TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3: DETAILED SUBMITTAL
CHECKLIST REQUIREMENTS
Does applicant have a right-of-way license? 0 Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal ❑ Dimensions
considered?(check all that apply): 0 Small Cell ❑Macro ❑ Street Name
How many install sites are proposed as part of this permit ❑ Site Address
application?
TYPE 3-Must provide 4 sets of plans(sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
0 Public Right-of-Way 0 Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
O Traffic Sight Distance
O Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineer's Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
O Traffic Report
O Storm water Drainage Calculations
❑ Geotechnical Report
O Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4
Edge of Pavement
\ Ditch ,�
I
�Streetlight — —• •—•—•—• ---
ti:,Drain . •rt .,..
® i
I I
1 T—Tr rirmWreSe�Iv3erriiWC
4.rti n Existing House
r- i
�; 1 Existing
al I
Lr Driveway
I 3r I _
a oI
of r 1 ln,
mI
aI I e rl
o.Iv
I
t
m � I Q. 1
o
i I 1
Existing Shop
Powerpole i o l a 1
a 95' 1
iI properly Line—
Il / I Fire Hydrant(FH)
I TI 1
Scale: t"=30'
I I
i I
I I
I
TYPE 1 AND TYPE 2:
MINIUM SKETCH REQUIREMENTS (Put N/A if lint applical)lc)
North arrow Property lines&dimensions Existing utilities locations
(sewer,storm,water)
Street&street names All existing structures
Proposed work Existing curb or edge of pavement Utility&street light poles
Existing S/W or D/W apron Slope of property Trees
City of Tigard • 13125 SW Hall Blvd. • 'Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4
P1. r 'y6[+ Bakery Out et 71g.. `° ,a ' 6- -17 Y e ���.�,'i
1
t
t '
r
h, it 34.17i i r ywK .. ..
w +►
S
•III
Air 1 •±9 ?•nyl o ±r C.rgg._ Mtge.... a, . �,".^
, p' .,RAISE MH 14 . -- y >. w °'`
b. r1^ �r QV— t
" e^± T
.ci,ng . Comto. ',. «,9 LI a
H ht�r3t ctarr, E � ,A t °a rl„it" .r - 4a� .. e •J
r EMH13 fie; ' �. . Va : " `' - 1,-.' "�' I9 '
III, I
♦ "Y t .. /
11'
•; ! ! " 1 .y ' •W. •, ' * j ,fly
x f ,. • tiL ..
77;
- ^I:"... 'AS�-hCr('. ,rk t }a� ' 4• .1 i t * l ,
'e' •' Cpndpn '5 ' !a{ e y �,�! ;r,ys..
xz
•
P C` .. • _
t ± # a ,- aryl•partment''` ..
4 4- a« ' _ `;rt tp w
LOCATE MH 12 • ; Go New s r « _.
TO CONFIRM i •♦ LOCATE MH 12 : ' '
CORRECT PATH .... u�'. !I'"..4 'TO CONFIRM _404 ,, , ,
& LIFT LID. • e CORRECT PATH
P, '_ iii • • i& LIFT LID T; s( J#
sw
" .
_'Dotingr ... o.
'ilirt
1 ^ "�
CUT OPEN MH 2 . 4 k . - , ,r .. .t
poi .
TO RAISE LID.
Ot 1 's 'g *' 41, `. . 9',jig'
•SW Greentlurg
Page 84 2011 Edition
Stationary Lane Closure with Flagging Diagram 320
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT) with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3 —Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater, when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4) should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection, the"Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 September 2016
2011 Edition Page 85
Stationary Lane Closure with Flagging Diagram 320
ec al C
ccc, L
6 ty�tl
z 0
o�s¢2 a
Oa\z¢ ` .05
rn
m CO
/ CO
a 1 t 0
• I-
• W
T • 30 Tr
�-R 1 • o o t
t gc7
;hl 1 sad
mtt
40, 1 3
C • A m
1 ilk gfa. yI I •'
IIN. I! ••• •
t�o cm_ I '
IICIIIV
I <
w
iii a
Y 1 tY. l \wo
m
Sign Spacing and Buffer Lengths(feet) `
Posted Spacing Between Signs "Buffer" �Q C
Speed a B C Space \'� / g Q L o
20 50
25 100 100 100 75 �O 0
30 100
350 350 350
40 150 pp ¢0
65 180 o¢G `
50 500 500 500 210
55 250
60 285
65 700 700 700 325
70 365
September 2016 Chapter 5
Page 106 2011 Edition
Diversion into a Continuous Left Turn Lane Diagram 430
Diagram 430 shows work in the travel lane(s) next to a continuous two-way
left turn lane with one direction of traffic diverted into the continuous two-way
left turn lane.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. When two or more travel lanes are reduced to a single lane before the
diversion, each lane shall be closed separately. Layout traffic control
according to ODOT Standard Drawing TM 852 for 5-lane sections.
4. A shifting taper(L/2) may be added in the diverted traffic direction
across the continuous two-way left turn lane (as shown). This option is
recommended when the speed is 45 mph or greater.
Sign Spacing and Buffer Lengths(feet)
Posted Sparing Between Signs "Buffer"
Speed A B C Space
20 50
25 100 100 100 75
30 100
40 125
350 350 350 150
45 180
50 500 500 500 210
55 250
60 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 107
Diversion into a Continuous Left Turn Lane Diagram 430
ROAD
WORK
AHEAD 1
B 1 y1t
LANE 1 4k I
AN 1
\ CLOSED
AHEAD
A
11
p
1 •
LJ2 1 ;1
•
•
1 :Buffer
V
Protection Vehicle
w/TMA(both Optional)
See Chapter 4
0ne
o_
111
W
Buffer
•
• L/2
1 •
.„_
•
1/2 • 1 A
• Y
1
1 1,41 yt
B ROADS,
1 Y 1 - WORK
............ AHEAD
September 2016 Chapter 5