Loading...
PFI2022-00065 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ap tl : Request for Permit Action 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503-718-2439 • www.tigard or.gm TO: CITY OF TIGARD Building Division 13125 SW Hall Blvd.,Tigard,OR 97223 Phone: 503-718-2439 Fax: 503-598-1960 TigardBuildingPermits@tigard-or.gov FROM: ❑ Owner ❑ Applicant ❑ Contractor ET City Staff (:heck(V)one REFUND OR Name: INVOICE TO: (Business or Individual) Mailing Address: City/State/Zip: Phone No.: PLEASE TAKE ACTION FOR THE ITEM(S) CHECKED (✓): [' CANCEL/VOID PERMIT APPLICATION. ❑ REFUND PERMIT FEES (attach copy of original receipt and provide explanation below). ❑ INVOICE FOR FEES DUE (attach case fee schedule and provide explanation below). Permit#: PFI 2022 — 000 6 5 Site Address or Parcel#: 11H6 SW arum " a Project Name: P 6 E Job * M 3d 13 40 4 M3D7 00 6 Subdivision Name: 'ry,-,Ott. C'(, Icm tq - Lot#: EXPLANATION: 61r�ea�yYr� iS (,�Jc,„J�,,}1 f, fpy] �rv�r Qd� , `tot G�.r rsf %r.'?iRl r� 2ri,.✓. Signature: /� ,, Date: 2. L 8/2022. Print Name: .T-rt-"i Refund Police 1. The city's Community Development Director,Building Official or City Engineer may authorize the refund of: • Any fee which was erroneously paid or collected. • Not more than 80%of the application or plan review fee when an application is withdrawn or canceled before review effort has been expended. • Not more than 80%of the application or permit fee for issued permits prior to any inspection requests. 2. All refunds will be returned to the original payer in the form of a check via US postal senice. 3. Please allow 3-4 weeks for processing refund requests. Route to Sys Admin: Date L Z Z By IS Route to Records: Date By Refund Processed: Date I By Invoice Processed: Date By Permit Canceled: Date 1I By Parcel Tag Added: Date By 1:\Building,\Foans\RegPetmitAction_120518.doc City of Tigard PFI #: 2022-00065 = ENGINEERING DEPARTMENT . Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK PGE Job # M3013467 & M3070045 Project name: 8 TYPE 1—Franchise Utility Work Brief description of project: PGE to replace pole 12107 and perform performed by NWN,PGF, or utility agency overhead work on secondary. PGE to replace pole 6606. Contractor ❑ TYPE2-ROW Sidewalk/Driveway/sewer to bore and install conduit. PGE to pull wire from 6606 to vault 148. Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and 9640 SW Greenbur Rd main line tap Location (address if available): g ❑ TYPE 3—Full Scale Development Work Portland, OR 97223 performed with land use approval which includes any of the following. • Subdivisions or Partitions APPLICANT INFORMATION • Street widening PGE [Submitted by Jeremy Sprague] • Mainline installation for sanitary sewer, Name: storm sewer, Tigard water, and 'Tigard Mailing address: 2213 SW 153rd Dr water service area City/state: Beaverton/OR Zip: 97003 ❑ TYPE 4—Small Cell Technology Phone: (503) 672-5446 ❑ TYPE 5—Tigard Triangle Email.. crewcoordination-western@pgn.com Phone: (503) 464-7777 NOTE: Type 1 and 2 applications may be Contact name: Nick Firestone emailed to rowpermits( rigard-ocgov. Phone: (503) 718-5681 Email: crewcoordination-western@pgn.com CONTRACTOR INFORMATION ❑ Same as applicant Name: DJ's Electrical Inc CCB Number: 134732 Mailing address: PO BOX 289 City/State: Brush PrairieNVA Zip: 98606 Phone: (360) 666-1199 Email: office@tradesmenelectric.com ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of workis required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? []Yes [E]No Case number: City of Tigard 13125 SVl%Hall Blvd. • Tigard,Oregon 97223 • www.figard-or.gov 503-718-2421 • Pdge I of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated "Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I, the applicant,certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. QaA-� Jeremy Sprague 02/24/2022 Applic is ora orized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: PF12022-00065 Permit fee: Received by: SPV Date: 2/24/2022 Approved by: Date: Notified by: Date: City of Tigard • 13125 SW Hall Blvd. Tigard,Oregon 97223 www.figa:rd-or.gov • 503-718-2421 Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 109/6 of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Pemrit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR ONLY • ' STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered? (check all that apply): ❑ Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans(sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following. items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineers Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard 13125 Six'Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 Sur Ed a of Pavement Ditch --- Streetlight I _._._._._._._ _r_._ ff RNn DrJu I i T �iopos d'Se1werTine-- � a Existing House r� I Existing � I Driveway ;1 °I � � v I al u1 � I 1 O c Existing Shop 1 Powerpole I I Q . p 95• HrropertyLine •—•—•—•-- i I o iI Fire Hydrant(FH) � � I Scale.- 'I"=30' � I 1 TYPE I AND TYPE 2: MINIUM SKETCH � I I I I � I � REQUIREMENTS North arrow Property lines&dimensions Existing utilities locations (sewer,storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. 0 Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4 vA«IMPUI✓.GILT -lsr mit I COMMERCIAL LEGEND vmw, N NEW PGE FACILITIES TO BE INSTALLED ��� the rm ,°Aa'i•erwyrurowa"R..mE'.�AR.r. / .=re...p � °r'roee•a�.'��vuryryRw,x��ar.�.nawxaw. w mr- O TIE m ••"^" elisaa[ewr 120GA . aTa ✓s frsiLMrlrplfeR .` ' . ..nr:r.. 2506 241A LD^ f!N •g4 rrp te"ir.rl8i —n�vne�•ep wweamrver 7504 1=0 0 a �'yy ®r�erexrwwvrr M 122 ri]aAeC Vi 169 9w121M ]-s ow! Cl 1.25C �� °a'•r ��""w1.Tr�. a �a.,,aea.h...e.e.aa...,,,,. TIE Aft wif vs • PD-150 e!W uooAeaa.,,ar�arerror, g ClCf 1�YBD •i x592 °AN+cc z,o o' x' Q.Y ��4''y �•L ... �MC.ie At �V ! wt � �� s n Iw1fa �°e+'i+•+ [wf rore �a-s w>,;•, 3W WAShIhG Iqy SOV1RE R0 t AO. l�5� ' e 3gs' M5•• P}1!0 INSTALL ABC 05001NA 72WV.1201208Y.3 9.M' ®wxwr / PGE NEEDS EASEMENT FOR CONDUIT House Loae u3x., _. veo�T.... i UNDERNEATHSUILDING&CONDUIT NIB Awnmenl Loae aa5xw �. /! SHALL BE ENCASED IN RED DYED EDF TWILcatl 4784n pr.eyv / vry 150 .' I,1 8mere-Orae !SD 0aq.aril melee v� mwa ® ���Nm.r III ra plMAr-�.r cow..Ae•tr� .e. 9 � ar o. ;., n PGE NEEDS EASEMENT FON q LONDUR fr•yn•� IUNDERLL B E LDING E CONDUIT SHA6E ENCASED I3ED IN RED DYED CDF O n r 1 1xeYlf ia_ri - r LiE • r� cwo.r r 1•"larwnrx ' � -•2 CONSTRUCTION NOTES'ziwAarc esNra roe wlrn,reA.c.sTs, psz e'e Fur l W.,F"g"S3^_gg. _ uwrTwxa AAa eeee E aew _ atle5'"m' rr vwloeae Cfai1[f >.Q 75.� eRTr"nh.,'4�e,.w..� r4.riR °serrnP wra HfdO'Ez _-� 'an', i win wrm uaE � vm. � ,�.'•�� �`�,��� ❑wevuueo.6 cw.rra. �- - _ �/ I20' ASL 500 IG•"m°�Fa^ .. ❑.awed ro awls. FI I'll MIST enave farror wAz PD-tst 6106fGE VAVLT INSTPLL: I' ,< Nrl-]Yb.MMtMEi]WirG.��e ABLfI.Ad(vA -=2U. .,,e rzogv]zazoev.3 a.aw �W� I/ APNI mLaee zsxw r ®, _ ® .:. '+'e`er' Thal Loa0335x. '°''�' •� C:e. 2' nr. 1n wwnmera-muso ael« i ,i:. b:m.— w�:,..'. -I J!\ �_yge • PD-151 I6A tow aPsmrem un,.eren •B'7SMrt'ED${NP.kL9o-...�...ei.....ao.....ra. THIN[ rayl • w]5 °ue SAFM Pf1LITI C11-26D S •�� cobs _ I DANAY6D N\IArO i4G $DES GNIIUIT \ .�irm �� E E ..,E IAANRCER Hlam-0e-r.AYr wNaT�ffil 6.. � ..a •r`7 . ��� e6L<o6aT4acrax N6mNrrPTNa,uomNrArNra<rroN FT-1 rrrarrire�r G�a.rararr S:..ii.�4 .w YOE 'if�cwvS° �G"R�. wkra raper w.nw^.er..^c� 1� e RIGHT-OF-WAY PERMIT NOTICE OVERHEAD LEGEND pn j j A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY Z WORK IN THE RIGHT-OF-WAY MAYBE PERFORMED. ONLYMMAPPROVED M.EMOVE FACILITI'LS =INSTALL FACILITIES CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL SyYW4s AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER FEE'S PERMIT. MODIFY FACILITIES NrNrrpR SppgRE RO y CONTRACTOR SB T BEGIN. JURISDICTIONTIFY THE LOCAL A COPY OF THE PERMIT MUST BE ON SITE. CONDUCTORS PL-12107 --------- INSTALL 142 AL-TX OH SECONDAR` II--T1I 6651 O POLES PL- 35'4 SET 20'EAST&12'SOUTH /r�POLE CLASS (1,2.3.4,Ht,H2,S) ( 'M`�-L)-- e ck REMOVE PL 12107 POE OWNED POLE '"OLE HEIGHT (FEET) PGE OWNED POLE 35'4 PGE TO PULL 5 PGE TO PULL TEMP TRANSFER COMM(S) ❑PGE PULLED. ❑TEMP GE PULEDFER COMM(S) ❑TOPPED TO COMM(S) THINK ? • ❑TOPPED TO COMM(S) TRANSFER SERVICE SAFETY W 36851 5'4 VICINITY MAP FIRST! 31 1978 Cil-26C 4 C11-MD R a 12107 354 C1I4rif 1979 Q 6606 45'-3 12107 TRANSFER TEMP SERVICE ',. • rw.aa mn 2006 75�`. 35-4 INSTALLED ON M3013486 O �,25 _-_ JOB SITE A J Bass 2 vTa a» wsz O - I W 4TSD UCQ y ..m. St SW LEHMAN ST ;,,...... p i &W1 POE CONSTRUCTION DRAWING sWAaurACT AS—BUILT VERIFICATION & NESC VIOLATIONS CORRECTED ANY DEVIATION FROM THIS DESIGN MUST This document occvraroy rwrazAnN FIELD Cons +... - BE APPROVED BY PGE PROJECT MANAGER Foremen: Dare: CONTACT SERVICE COORDINATOR DATF 8/812021 SCAUE'NTS JACCOUNT.1070001 JAWOO 1000011118 IJ06NO.M307C045 CONSTRUCTION NOTES: OH FOR mFNCH AND CONDUIT INWEGTION PRIOR TRE TO SAGKFIUL PGE WILL NOT INSTALL WIRE UNTIL TRENCH IS IDA%BACKRUJiD. ` Terrace Glen Apartments 1. SEE THE POE ELECTRIC SERVICEREQUIREMENTS (ESR) BOOKFORTHEFIILLSET COO SIZECIRCUIT OF REQUIREMENTS.THE ESR BOOT(CAN BE FOUND AT httwJ m-n.PaMaMganMl,c 5033-32318 / PROGRESS-GREENBURG srz11x17 2. CUSTOMER IS RESPONSIBLE FOR OBTAINING ALL BUILDING AND ELECTRICAL PERMITS FOR CALL 811 BEFORE YOU DIGR PGE/ LOCATION THE APPROPRIATE MUNICIPALITY GUSTOMER IS ALSO RESPONSIBLE FOR OBATINING ALL ATTENTION: EASEMENTS AND TREE-TRIMMING PERMITS,AS REWIRED. OREGON LAW REWIRES YOU TO FOLLOW RULES ADOPTED ` 9640 SW Greenburg Rd Tigard OR 97223 3. ALL TREE TRIMMING IS REQUIRED TO BE COMPLETED PRIOR TO PGE INSTALLING SERVICE. BY THE OREGON UTILITY NOTIFICATION CENTER. DESCRIPTION 6. CONTACT PGE SERVICE COORDINATOR IN ORDER TO RECEIVE AN APPROVED METER THOSE RULES ARE SET FORTH IN OAR 952-001-0001 (DOR) Relocate PL 12107-Remove PL 6851 SPOT AND CONFIRM THAT THE SERVICE WILL MEET ALL APPLICABLE CODE CLEARANCE THROUGH 952-001-0 100.YOU MAY OBTAIN COPIES OF GOIIrfTV ECTION(51 WORK MTN SHEET REQUIREMENTS OVER BOUND,STREETS.PARKING LOTS,ROOFS,DECKS AND BALCONIES, THE RULES BY CALLING THE OREGON UTILITY WASHINGTON Cil-26C ACROSS OR BESIDE OTHER OVERHEAD UTILITY WIRES,AND ADJACENT TO WINDOWS. TIFICATION CENTER ADMINISTRATION Q I SOa•232.196T BEAVERTON 1 OF 1 5. AFTER PASSING THE APPROPRIATE MUNICIPAL ELECTRICAL INSPECTION LINE CREWCENTER DESIGN BY Pilo CUSTOMER (SDA DRAWN BY CUSTOMER TO REQUEST AN INSPECTION BY PGE BY CONTACTING A SERVICE COORDINATOR TO REOVEST UTILITY LOCATES CALL THE OREGON 14101/�IOTI�CM zxll9w�p r�ooe NICK FIRESTONE 71 LIM[ SRAVY NARAYANAN AT BO 2-8618 OR 503-32Z67001N THE PORTLAND AREA.PGE WILL NOT ENERGIZE UTILITY NOTIFICATION CENTER,811 AT LEAST CdI defer! 4 eEAVEmox THE SERVICE UNTIL ALL INSPECTIONS HAVE BEEN PERFORMED. 2 BUSINESS DAYS PRIOR TO EXCAVATION. Tw 10 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED Page 110 2011 Edition Interior Lane Closure, Multi-Lane Non-Freeway Diag. 510 Diagram 510 covers work which will block the left lane(s) of a multi-lane non- freeway road. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3 —Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. If the adjacent lane in the opposing direction is not closed, cone off the work space placing the cones in the median or along the centerline if there is one. 4 Placement of signs in a non traversable median or other median that is not a two-way left turn lane is required for lane closures any time there is room for a truck to be parked on the left, out of the travel lane. When there is no room for a truck to be parked on the left an additional LEFT LANE CLOSED AHEAD sign should be placed on the right side and placement of signs in the median is optional. 5. When the posted speed is 40 mph or less, the LEFT LANE CLOSED AHEAD signs may be omitted. 6. Cones may be placed as shown on centerline in advance of the work to better gain the attention of motorists. 7. Work vehicle(s) with or without a TMA may be used to protect the workers and work space. Sign Spacing and Buffer Lengths Ifeet) Posted Spacing Between Signs "Buffer" Speed A B L Space 20 50 25 100 1130 100 75 30 100 35 350 350 350 125 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 111 Interior Lane Closure, Multi-Lane Non-Freeway Diag. 510 ROAD _ WORK AHEAD C t 1 tit k LEFT LANE CLOSED AHEAD e L I : •o.o_o • Protection Vehicle w/rMA(troth Optional) (Optional) Buller, • See Chapter 4 • • Butter • (Optional) I • . I L r Ir A * LEFr LANE CLOSED •See Note 4 e AHEAD tit tIt ROAD C WORK AHEAD •r September 2016 Chapter 6