Loading...
PFI2022-00139 I CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT s COMMUNITY DEVELOPMENT Permit#: PF12022-00139 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/18/2022 Parcel: SEG1001 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE#M3163867 Project Description: Band streetlight Class of Work: FEES Type 1 -Utilities(gas, electric, data) Description Date Amount PFI Permit Fee 04/14/2022 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: LAURINDA DUNN 10800 SW AVERY ST TUALATIN, OR 97064 PHONE: 5036122932 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: hA Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12022-00139 Tvpe: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced, with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA,current edition,American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic Flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met) and 503-431-2345(Tigard School District) and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours (min.) before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities (roads, ditches, etc.)as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 20- NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2) persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI—Utilities 31 -OTHER Applied Notice Other City of Tigard PFI #: 2022-00139 ENGINEERING DEPARTMENT . Public Facilities Improvement (PFI) Permit PROJECT INFORMATION PGE Job # M3163867 TYPE OF WORK Project name: 8 TYPE 1—Franchise Utility Work Brief description of project: Bond Streetlight performed by N",PGE, or utility agency ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer Work performed for the purpose of Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): 12360 SW Grant Ave, Tigard, OR, USA mainline tap ❑ TYPE 3—Full Scale Development Work performed with land use approval which includes any of the following. • Subdivisions or Partitions APPLICANT INFORMATION • Streetwidening Name: PGE L a u ri n d a Dunn • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 10800 SW Aver/ St. water service area City/State: Tualatin Zip: 97064 ❑ TYPE 4—Small.Cell.Technology Phone: 503-612-2932 ❑ TYPE 5—Tigard Triangle Email: HVA.preregcoord@pgn.eom Phone: 503-612-2932 NOTE: Type 1 and 2 applications may be Contact name: Same as above emailed to rowpermitsta'�tigard-m.gov. Phone: Email: CONTRACTOR INFORMATION ❑ Same as applicant Name: Custom Lighting Services, LLC dba Black& McDonald CCB Number: 155359 Mailing address: 2102 E McLoughlin Blvd City/State: Vancouver/WA Zip: 98661 Phone: 503-457-8639 Ems: twise@biackandmedonaid.eom ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-wap) Is work related to a LAND USE DECISION? DYes E No Case number: Cityof Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-orgov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owners signature on the application. I.the applicant,certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. La�/ :)a44P Laurinda Dunn 4/7122 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFU USE ONLY Case No: PF12022-00139 Permit fee: fyo Received bv: SPV Date: 4/11/2022 Approved by: r Date: 2 Notified by: Date: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-orgov 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY • ' STAFF USE ONLY SUBMITTALTYPE 4: SMALL WIRELESS FACILITY TYPE 1-3:DETAILED CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans(sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Coves—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval Cityof Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • wxvw:tigard-or.gov 503-718-2421 • Page 3 of 4 j F dofpavemmt I — Ditch Streetlight I .•.•.•.•.'.' 1 I 1 CL) I n! 1� I in l Existing House I Existing Driveway _ I CI ^ �j L rj of ^ I 0.i v*v I 1 C1, ij Fixating Shop j Powe` I o l o \ a \ , I Wiepe Ei/Line'— i I o II Fire Hydrant(FH) I I I I I Scale: 'I"=30' � I I TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) I I I � I i 1 I i I I North arrow Property fines&dimensions Existing utilities locations (sewer,storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 9%223 • ww•wctigard-or.gov • 503-718-2421 • Page 4 of 4 POWER MAKE-READY POLECHANGEOUT POWER MAKE-READY NO POWER MAKE-READY NEWINTERSETPOLE MCI FIBER OVERHEAD BURY POWER MAKE-READY COUNT POLE CHANGE-OUT 0 POWER MAKE-READY 7 7 NEW INITERSET POLES 0 TOTAL PROJECT POLES 7 VP SHEET 2 HEEI WL 21 'k, SHEET3 W WL L 25-27 SHEET 4 -RWEll.OJE--CONTRACTOR PROVIDW MATERIAL c WL33-35 PGE CQVSiRUCT10NORAWING A"UlLTVERjFjCAn A NESC VIOLATONSCORAECM FQR� GENERAL FOREWN; DALE: OATS SCALE: JACCOUNT 0124j2022 lN,475FII0MODl LASoi'li =0607i546 12001163867 NnE N10 IANOIUR6 02 CIRcuff11115 17 TI..4n 13361,TIGARD 13362 PGE LOGA"ON SW GRANTAVE TIGARD,OR DUCRIPTION SHEET WIFIBER MA COUNTY SECTIONS WORKWJTNj WASHINGTON C21020 DE1&4 D�ft3NFDBY PHONEIVRAWNSY 1!aIEP, HE36(1768-75015 JOSHKIUON '0" U,'.NM�ON.. "I ,629 WItCHECKLIST OVERHEAD LEGEND 60-3(.I C' REM YF5 COMMFM INSTALL FACILITES 195] y� rvOLEDIGGER MODIFY FACLRIES A9 O REMOVE FACILITES BOOM x BONG STRfERIGNT BACKHOE "VISIBLY BOND STREETLIGHT HAR DWARE TO SYSTEM NEUTRAL" PGF TRFNCH REFERENCE:LCI 1560,P 5fi AND NESC 238B 4079 CONTRACTBORE 60-1 VAC TRU CK _sw*cIRRNRE 1994 IOGTfS STAKING FLAGGING x _ h�yp O TREETRIM 1 P < Q LANDSCAPE }NIN/ENIS, 3551 ,�P h EASEMENT �00Ny 45-3 $ �p PERMITS K TIGARD 195] C50 y� TRAFFIC vuN x OTTC 55405 SAp CUTSHEET 5199 pr`s' UG COB VER 30-2 p TRANSMISSION 52p 71 SHUTDOWN 1983 OG 35-4 p 19M U 4a o 5-44 CUSTOMER 12353 A�94461 P� `/ SHUTDOWN O� DOORHANGER v 0 2D WL L 21 P -5498: PGEMA/NTAINED CONTACT Modify: 5 4 COMPANY _ VVI- ;) 20Zo BONDSTREETUGHT PHa cR Slee COVER STREETLIG14TDRIP LOOP WITH DATE TIME 3742 yep -1 ]5-2 FILER TUBING AND FASTEN TO POLE 5A-2 �oP VJ�22 1986 95-1 - 1994 1976, 2011 fig O / \ O 50-3 2x4016ryRy 9885 12385 S�UD 2012(2-ARG 12360 7p 2 01 900 GU 78 1988 A 50 55520 OL23 W-2 42257 a BD 2010 Q/ 79SKcM.AAC As O GIVANESTp WpNP 2010 �O pPSI aLE� 44(,` TURNIEY PROTECT-COHIRACTOfl PI1ONOEO MATERIY O 25 1 5� 1639 tl- �pii Y 40-4 9 a� 1949 8 y p 12380 50-2 ANCHORS i Z1Sl M,ysO N0 ST 'hy p 19 PV 1 201D Q, n l� ANCAHOM1RECaODD/950 A15 66349 2334 (LOS) E A� NI(PLOBS 1 GJ.� G2 .l� 6 on.2. 2 ^ r 2 G23 242GM G 5 n -PG 3923 PD 5341 RGFCONSIRUC110N DRAWING 1hL 24 p\O \Ey W68 4SBw"T VERIFICAPON 2NESC VIOLAHONSCORRFCTFO 29� 619 01001135 ..,:a............. ..�a.,,. e 45,4 6] GENERAL FOREMAN DATE: 99_5 138, � 250- N9C p(j£j5 GtiC^ FRET ISIGVATVREQVLV RCUVNtfD FOR FIHO CONSTRVCTIQV CW1NLEbJ 1995 201D0 hJ982555]46 p�'`3 __ DATE' SCALE' ACCOUNP AWO: TOB NO. 03124/2,022 liN=]3 FT 1070001 100000]Sd6 M316386) ANY DEVIATION FROM THIS DESIGN MUST OF TITLE NED SANDBURG 02 APPROVED BYMEPGEPROIECTMANAGER ` CIRCUIT 512E TNSMI)13361 TIGARD 13352 11 x 17 AMUNON: CAU811MFOWYOVDIG rGE LOCATION ORMON OWS REQUIRES YOUTO FOLLOW RULES ADOPTED BYTNE • 12360SWGMNTAVE TIGARDOR OREGONUTIJFTYA'OMK:AIpN[fM£R.THOSF BUTES AR£SET FORTNIN DESCRIPTION MCI FIBEPHVA SHEET OAR952-0Ol-0IOTWN952-0O1-0MMUWYOWAINMMEI • ` fI OFTHERU BYCAIIMGTHEOREWNVNLRYNDNFK MNCENIFR COUNTY C2102BS WIXfKWITN AOMIMG1MTpN(E(SO2-23I-1987) xno...KNx BBIRYI WASHINGTON C3102B DESIGNEDBY RHONE OMWNBY II 2ef4 TOREMESTOTIU WCATBCAUT EOREGONUTILNYNONF"M)4 rrB�blwe ARA} IOSD'H HENRIKSON 360-]68-]565 JOSH REETON CENIF 811ATLEAST2BU51NOUWnPR.ORT0E 14ADON IOIM NSf TRACKINGA 1319]J] WL247 WRCHEEKUST OVERHEAD LEGEND pY �1U 29 5p72 ITEM YES COMMENT —NSTALLFACLNES e 45-4 - 0 =MODIFY FACLTES PD 49 C3 1995 2010 HOLEDIGGER —REMOVL FACLTFS 97 S BOOM x WAIDSTREMIGHT 9 7880 84 BACKHOE VISIBLY BOND STREETLIHT GHARDWARETO5YSTEM NEUTRAL' 30-ITN 40 J 2D10 FEE"INCH REFERENCE:IC1IS60,PSd AND NESE 2388 20 1980 Q' CONTRACT BORE AAP VAC TRUCK sN"cN,1Nm, 04A .5 Sk, ? 51 AYH,F,. LOCATES all STARING YCl 9�. 601 FLAGGING x H[ 45-4 TREETRIM PD 1951 LANDSCAPE � G MNNA B 1544816 ADC 150 34140 EASEMENT M"RNq+IN am" 51 / bRN9pKIR 30-LINK PERMITS x P.6AR0 PD 2003 G� 3-14210T TRAFFIC PUN x OTTC 70097 45 till 0allr dG 2520 CUTSH EET WL25 PL-1601: PGEMAINTAINED ueuavep O Modify: TRANSMISSION 2575 •, oT RAISE CUSTOMER OWNED STREETLIGHT 6" SHUTDOWN ,y ?e� BOND STREETLIGHT CUSTOMER COVER STREETLIGHT DRIP LOOP WITH SHUTDOWN 10093 FLEX TUBING AND FASTEN TO POLE DOORELANOER CONIv 44 M20 063 caLRPANr 1426) 45-4 PHR CR 1995 9905 DATE ME 3-1 240T 28 WL 26 PL-1703: PGEMAINTAINED WL 27 PL-1702: PGEMAINTAINED 45-4 Modify: Modify: 6P 'J 1995 BOND STREETLIGHT AND FLOOD LIGHT BON D STREETLIGHT AND FLOOD LIGHT COVER STREETU GHT DRI P LOOP WITH COVER STREETU GHT DRIP LOOP WITH C 25 78576 FLEX TUBING AND FASTEN TO POLE FLEX TUBING AN D FASTEN TO POLE RETENSION SEC(SW)TO MAKEI ^ sk 4" MIDSPAN 4S'ABOVE TOP COMM ANYOEVIATILWFROMTHIS DESIGN MUSTBE M L o C,tt,4•Z7 2007 APPROVED RYTHEPGE PROIERMANAGER pT' fy.T d0-3 2p@ 2 1962 r TURNKEY P0.01ECT-CONTRACTOR P0.0NpFD MATEgIAL 23-4 1986 (3 lIb A2579745 ANCHORS J x Q GUYING O O G o WL27 \ 1 -. V A_0.EA0i s W ILesl N m nom. m nom. 1702 -LI 113 25 T [,PJ 6954 ILB51 r ' N1 GUS G 1 1GUYS GGSGR GGGG222 1991 12630 Sw ABC 75 M599 N ANCHOR CODE Al A3 AS A]AB 3GUY5 (3IG6IG9jGl2IG18jG21jG24 PD 52 PGECON5IRUCRON DMWING PAS-WILT CLVERIHCATION&NESC VIOLA TNMY CORRECTED ~S. THINK . .11 GENERAL FOREMAN: DATE11 : F116T 9pI/ITUREONLY REpUIREO PoRFIEIDCON3IRUCTIQV LYHNGE A 1542625 WL 28 9870 DATE SCALL jAcED.. ' AWO' /CTB NO. (''11� W/24/2022 11N=73 FT 10)0001 1000001546 M3163861 41-011,_9 5d� NS 5 512536, TITLE 1990 NEL SANDBURG 02 72GE0 1001011 CIRCUIT SIZE TGARD 1336L TIGARD 13362 11%V ATFENVON: CALL NII BEFORE YOU DIU PGE WEAPON OREGON IA WS REQUIRES YOU TO FOLLOW RIMES ADOPTED BY THE U5205W GMWAVE TIGARD OR ORE60NUTRBYAVTI AWNCENTERTNOSEWU AMSUMNHW is ` DESCRIPPON SHEET OAR952-0Ol-0OIOTNROWH952-0Ol-00 O OUAMYOSTA MMES MCIOBER HVA OF THE RULE5 BYCWANG THEOREGON UTILITY NORRCATpNLfNTFR WASHCOUNINGTON C215ECO2B, WORKWITH WASHINGTON C2102B AYL0C4Tff CALL THE 0IS232-1987l N�WIK�� DESIGNED BY PNONE DRAWN) 3aY4 TO REQUEST UTNT'LOGBT6 CALL THE OREGON UTIRY NOTNILIIION BMIwE�41B NWIIm4 JOSEPH NENRIKSON 360-768-7565 JOIN KEETON CEYTER 811 ATUSAST2 BI15INEG DAIS PRIOR TO EKUVATION 1JOINTUSETTARCKINGit 1319777 sT wacHEa.... OVERHEAD LEGEND 12650 N-4 ITEM YES1 COMMENT INSTALL FACILITIES 1991HOLEOIGGER E�MODFYFACLITES 12630 �R VEFACLAES BOOM % (4 4 BACKHOE BONALY FROND SME 1990 'VISIBLYBONDSIREE,P5-5 AND TO SYSTEM NEUTRAL �P4 VGE TRENCH REFERENCE:LC11560,P 5-6 AND NFSC 2388 ,rN CONTRACTBORE VACTRUCK NBMn11LCOF B 25 52625 A 1542425 WL28 9870 LOCATES A•IU 017,01 STAKING 454 220692 41 11'%v1 1990 WL33 PL-2068: PGEOWNED yr s]xs FLAGGING K 40-3 'fggC. Modify: TREETRIM 1990 RETENSION SEC)SE)TO MAKE c 001011 LANDSCAPE 01,10yP MIDSPAN 45ABOVE TOP COMM 9855 EASEMENT sPR wr PERMITS K TiGARO TRAFFIC PLAN K OTTC 9969 12801 CUTSHEET WL33 y'qY 998 UGCIRVER Qt 2068 I/O NUT TRANSM15510N S� X90 99 SHUTDOWN q635 354 9975 CUSTOMER 901 SHUTDOWN _ DOOR HANGER C 50 67 9 0m 29 81006457CONTACT 1780 1 V DT COMPANY 45 a 19902dd7' ?P 9955 PHP CR 5 DA E ME 4 lflli30 990 f A 15 43340 8`543341 6319 CI 3315 35-6 1990 I� 9935 998E X35 Y r) 16 Vri 30 45t 3 3 1891 ANY DEVIATION FROM THIS DESIGN MUST BE 1781 1282 WL34 PL-2067: PGE MAINTAINED 19 F APPROVED BY THE PGE PRO/ECT MANAGER 45-4 Modify: 995 BOND STREETLIGHT COVER STREETLIGHT DRIP LOOP WITH TURNKEY PROJECT-CONTRACTOR FRONDED MATERIAL C 10 10 117611]69 FLEX TUBING AND FASTEN TO POLE Q6'q 2065 ANCHORS M GUYING O u O 45 3 1 A l c G_(POS) WL35PL-2066: PGE MAINTAINED 1/90 azOgyo AREAD) 12630 Modify: 1 (LBS) vOi n g IGUY jG1jG4jG7jG1 G16 GI G22 aec 300 013 BOND STREETLIGHT a ,�, r zGuvs Gz Gs GR Gu GL Gz G23 P 65 clD0 z66s 9980 COVER STREETLIGHT DRIP LOOP WITH 74 r,rv;noacoDE al a3 As a7 AS 3Gurs ca c6 c9 c12 c1 Gz Gza VT 314 FLEXTUBING AND FASTEN TO POLE 80-2,. POfeoNmeurnavORawING C 167:122__/! 35-4 1990 OB ASBUILTVFNu GN 110 6 NE^,p IOIADON♦^u[ORRECTFO OC G -p THINK rnweee mreuun Jsa PO •F=tAO �p GAYETY GENERA(FOREMAN' DATE' 12695 FPIST raau naEQH(v REounEOFoa oleo cavaraUcrvx cHRN(xy 997 0}Y/&'y,1Q e� f� DATE: SCALE' ACCOUNT AWO: IDB NO T5 yj-3r P �(, 03 14 2 SIN=]3 FT 10)11001 100000)5x6 M316366] 9982 12925 +990 1Ci t` ry, QP`\4 FIRENED SANOBURG 03 12979 P947L9/` CIRCUIT 5L� TIFNRON: GU 811 BEFORE YOU DIG ��E/ LOCATION 9GWNyyALNUT TR T13362 GAR0 OR 11%1] CUEGONIAWS REQUIRES YOU TO FOLLOW RUIESAOOVTEO BY ME B DESCRIPTION ORFGONUTKDY NOTN1GTpNCfMfR.THOSE RUUSAMfOR SEiIH IN \ MCIFIBERHVA SHEET OAR952-0Ol-0OIOTENOWH952-001-009OY WYOBTAINCOPUN OFMERU1f5BYGNMGTHEORFGONUIIUIYMITNR'AMNCFNFER COUNTY WORK WASHINGTON C2102B ADWIFFIRAMN 9(502-232.1987) KgIPWy 6lIOR DESIGNED BY PHONE OMWNBY 4ef6 TO REQUEST UTB LOCATES CALL THE OREGON UTP TYNOTIFCA TO& �IdwPRK41l JOSEP H HENRIKSON 360-]68-]565 POSH KEETON CENT! BIIATL T2Bu5ml """"""" """"" JOINTUSFTRACKINGk 1319]]] Page 84 2011 Edition Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3—Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater, when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4)should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection,the"Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 September 2016 2011 Edition Page 85 Stationary Lane Closure with Flagging Diagram 320 a0 ++ c � 3¢ o nz 0 `` O m � WMP i 4 t 3 MW M: o_ a ----------------- I m c • v o Q I • c$L I I •®% �aU EE I V I r • 3 I I • I I • ( I I O }P7j�s8 • m anz Ills I n! �i I • Iog I•' • d v m0� 1 � � e :Lw- -j y Iie N `p / w� O I Y. - msy cn 1 t Y.,� 1 MCC a° 5ign SO acing and Buffer Lengths(feet) Posted Spacing Between Signs "BuOer' w N speed n e Sp .,e 5 ace O 20 50 ZQ� n 25 100 100 100 75 o O 30 100 35 40 350 350 350 125 150 p 95 160 OQ 0 SO 500 S00 500 210 2 3 55 250 60 2g5 65 700 711D 700 325 ]0 365 September 2016 Chapter 5 www.invarion.com Lane Closure at Intersection with Flagging in Diagram 620 9 ROAD WORK AHEA ONE LANE 1 t (Optional) ROAD AHEAD B BE PREPARED TO STOP B A 0 0 100 ft Max. o 0 Buffer p O O 00 O O ® O O O O ® O K K K K I 100 ft.Max C B B q ROAD WORK BE o PREPARED HEA TO STOP O 100 ft.Max. ONE LANE • ROAD AHEAD (Optional) A • B BE PREPARED TO STOP B (Optional) ONE LANE t 1 ROAD AHEAD C ROAD WORK AHEA www.invarion.com Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1 . During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs Buffer Speed A B c Space ERRATA: 20 50 25 100 100 100 75 Supplement Table 30 100 35 350 350 350 125 Updated: February 12, 40 150 2016 45 180 By:MOT Traffic-Raodway 50 500 500 500 210 Section 55 250 Signs Spacing and Buffer Lengths (feet) Supplement Posted 5 acing Between Signs "Buffer" Speed A B C Space 60 285 65 700 700 700 325 70 1 365 www.i nva ri on.com Bicycle Accomodation Diagram 6-6 I NOTES: - Bicycles on Roadway (CW11-1) sign should not interrupt standard sequences. For example: BE PREPARED TO STOP/Flagger Symbol LANE CLOSED AHEAD/Lane Ends WSymbol Work - Bicycles on Roadway sign typically follows ROAD Area WORK AHEAD sign and used as general warning. I � A I I A I I B I ItON ROADWAY I � C I � ROAD WORK AHEAD www.invarion.com Bicycle Accomodation Diagram 5-6 Bicycle Accommodation Principles: 1 . If a significant volume of bicycles can be expected and work closes a marked bicycle facility, or requires bicycles to share a travel lane, install a "(Bicycle) ON ROADWAY" sign (CW11-1 ) or the Bicycle symbol (W11-1 ) sign with an "ON ROADWAY' (OBW1-5) rider, in advance of the work area. 2. Install temporary signing off the paved shoulder, within the planter (buffer) strip, or share the width needed between the shoulder and the sidewalk, as available. 3. Signs are to remain in place until the surface is restored and the width made available for bicycle use. See Diagram 5-6 for typical bicycle signing placement. Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs Buffer Speed A B C Space 20 50 25 100 100 100 75 ERRATA: 30 100 Supplement Table 35 125 40 350 350 350 150 Updated:February 12, 45 180 2016 50 500 500 500 210 By:ODOT Traffic-Roadway Section 55 1 250 Sign Spacing and Buffer Lengths (feet) Supplement Posted Spacing Between Signs "Buffer" Speed A B C Space 60 285 65 700 700 700 325 70 365