PFI2022-00135 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
= COMMUNITY DEVELOPMENT Permit#: PF12022-00135
13125 SW Hall Blvd., Tigard OR 97223 503.718.2421 Date Issued: 04/12/2022
Parcel: SEG957
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: PGE#M3032220
Project Description: PGE to install underground service in customer provided and installed conduit by PGE approved
contractor, SEG 957
Class of Work: FEES
Type 1 -Utilities(gas, electric,data) Description Date Amount
Owner: Total
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tiaard-or.eov to schedule inspections online.
Contractor:
PHONE:
Applicant:
BRIANA FOGH
2213 SW 153RD DR
BEAVERTON, OR 97003
PHONE: 5034634355
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
see application
Signature:
Issued By: Je�u-,.rfer- Mc4i,"�
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12022-00135
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of any
agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and
violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and
suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc. shall be
reinstalled or replaced,with like kind of material.Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.
Traffic control devices,flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively
maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area
wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)and
503431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at
each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City
Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the
City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14- UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080.Copies of said rules maybe obtained from the Center by calling 503-246-1987. If
you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before
digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the
applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with
affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by
the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection,
and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and
provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City,in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector.
PFI_Udlities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may,at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and,in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or property executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain
or provide for proof of right-of-entry or easements.
PF1_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility,shall be provided to the
City by a registered civil engineer along with an engineers certification of installation compliance(Certificate of Compliance).
PFI_Utilities 31 -OTHER Applied Notice
Other
City Of Tigard PFI#: 2022-00135
ENGINEERING DEPARTMENT
. Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION
PGE Job # M3032220 TYPE OF WORK
Project name: R TYPE 1—Franchise Utility Work
Brief description of project: PGE to install underground service performed byNWN,PGE, or utility
agency
in customer provided and installed conduit by PGE approved ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer
contractor. Work performed for the purpose of:
• Sidewalk installation or repair
• Driveway approach installation and rcpair
SITE INFORMATION • Sanitary sewer lateral installation and
Location (address if available): 12300 SW Main St, Tigard, OR main line tap
❑ TYPE 3—Full Scale Development Work
97223 performed with land use approval which
includes any of the following.
• Subdivisions or Partitions
APPLICANT INFORMATION • Streetwidening
PGE [Briana Fogh for Hap English] • Mainline installation for sanitary sewer,
Name: storm sewer, Tigard water, and Tigard
Mailing address: 2213 SW 153rd Dr water service area
City/State: Beaverton Zip: 97003 ❑ TYPE 4—Small Cell Technology
Phone:
503.463.4355 ❑ TYPE 5-Tigard Triangle
Email: Crewcoordination-western@pgn.com phone:
NOTE: Type 1 and 2 applications may be
Contact name:
Bnana Fogh emailed to rowpermitsntigard-or.gov.
Phone: 503.463.4355 Email: Crewcoordination-western@pgn.com
CONTRACTOR INFORMATION El Same as applicant
Name: CCB Number:
Mailing address: City/State: lip:
Phone: Email:
ENGINEER INFORMATION
Name:
Mailing address: City/State: `Lip:
Phone: Email:
ADDITIONAL INFORMATION
Estimatedvalue of workis required(if over$5,000):$ (within the public right-of-way)
Is work related to a LAND USE DECISION? OYes [aNo Case number:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • xvxx w.tigard-or.gov 503-718-2421 • Page 1 of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee" and shall provide financial assurance for
work,if requited by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owners signature on the application.
I,the applicant,certify that:
• To the best of my knowledge,all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
Briana Fogh 4/6/2022
Applicant's or authorized agent's signature Print name Date
Property owner's signature (if required) Print name Date
STAFF USE ONLY
Case No: PF12022-00135 Permit fee: -0' Received by: `SPV Date: 4/6/2022
Approved by: Date: �f�/z124)22 Notified by: M Date: y'jZj�22
Cityof Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 www.figard-or.gov 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FOR ONLY • ONLY
TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3:DETAILED SUBMITTAL
CHECKLIST REQUIREMENTS
Does applicant have a right-of-wap license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal ❑ Dimensions
considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name
How many install sites are proposed as part of this permit
❑ Site Address
application?
TYPE 3-Must provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
❑Public Right-of-Way ❑Private Property
❑ Coves—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers)
❑ Engineers Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 3 of 4
SW C-41 I
Edge of Pavement
I 1—� Ditch
Streetlight I �•�•�•�.—.�•�.� �.—
�[J
I
i T—'t�rupos jae�ra
N II d Existing Hose
Existing
rl dr • Driveway
I 31 1 1
C• . '
Ye
i Exigling Shop i
PowerpoleI I oigma—
�
I � Property Line
r
I Fire Hydrant(FH)
� I I
Scale: 't"-30'
� I 1
TYPE 1 AND TYPE 2:
MINIUM SKETCH REQUIREMENTS (Put N/A if not
� I I
� I I
� � I
pe
North arrow —Property lines&dimensions Existing utilities locations
(sewer, storm,water)
Street&street names All existing structures
Proposed work Existing curb or edge of pavement Utility&street light poles
Existing S/W or D/W apron Slope of property Trees
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 wWW.tigard-or.gov • 503-718-2421 • Page 4 of 4
www.invarion.com
OOOT PERM1Ta
•wx[a, N•ER/wa rruaEn
PGE(WOwnWlle LCC) M3032220
rwrR rI11YaNr/EprawOa: [rrr/sTAR:
12]0412300 SW Main St Tiprd,Oe
IIIIME MI111111CfeL
PGE
owracr W!/w owen: IMNL
Nap Enillrh/503-M-S41119 henrT.enif•hppp oan �p-
O
rMoaMo ar: raarrK mrrtknEcornkaaok ,
C Borden potelco IM
POTELCO INC ,
0
Place sign at SW comer of
SW Sco"Ins St&SW Ma in St.
Ah-� O,�Soa�-D gPreNtle spotter(sl to
,{ sist pedestrian traffic
Meter salelyamund work area.
d' 11�4 ���,a�P' E � (New)
S, t-
9 '
• ! / • r P(New)
�doQd ed^O,
p� 1
DO `r T
Y� 1 •
tied(. Pole#9732 / / y■ ^.
a
O0
" s
h x
•
1 "oe
°P�OS
pfa4�
1
"
°O•
DEVICESPACING:
a�
°O TAPER:20'
TANGENT:40'
All signs and devices SHALLconform to the MUTCD/OTTCH.
Will adjust to fit field conditions as needed for safety.
Plan NOT to s ca le.
':Ne COMMERCIAL LEGEND
P9�'�ry NEW EDGE FACILITIES E INSTALLED
A 503 SA/ (UNLESS OTHERWISEE SEESIFEO)
C 3039 2)I5 nEwvE s.cxnrs ...'NEA
L4 N� � .�B _NBiILLeDOIIIONRL FRGYSYYLOOAMLRRES
�- Y ISPVNI ■ NIPRYYPPRESEEERINYRNIILLYOPRO E.
.uEo..pInTOLMR
G B1tl
CONDUCTORS
�
P4, LitT JNTMNMYNYILCCpIPLOF
SHP hsMOVY
.. fLt .LLY.,ER.D.BL
C"V ALM1MPf1.1L.bECOMOIRYNS"ENC
OMO
.yP - CM MV AMMLLEUPY019!OPbI
A 10 W234 RUINI
SUSEFUEM'CASNO
N nu
zmAIPVER V
oMR ] 1PHASEIGPH) p
NO' 4 1225 N vD.O.Ax
'196! i AFGMSY PSG
psY 14z ADT vr4M 33' ® CONTACT SERVICE COORDINATION
1°' •CREW NOTE` w `OEOMQ ANUco.ort IN5Nc1roH
? EWORK UNDE jVN Pw1I3 5n ,LL AN WIuxDIEDMu11'
MxBfaOk euXDLIc
,Lr CITY OFTIGARD 2S ABC IN 521 VxsERvlOi coDROMRroa
PFI PERMIT Ol°�I FP]T sG5-B2B-SJDD DR 24»To-ssz-ae2e
o
C 6141
E WL 3 NEW III CONSTRUCTION NOTES: CMDEV
Base -NRJ4 ,' Inslall: I.ANCOROCUSTOMER 16RESPONSIBLE FOfl ALLMENCH NI PAQs
NEW METER TOR FC CONDUIT
FROM
ALLLGRADE TOOE INSTAL1E0 N1TH]OINCHES MINI COVERAT
lip
4 R f. AME NCTON XESANEY WIBREOUIRED WffFOR IUIM.I WNNOALL ERGMEOPGEVAUNTS,
-'C O� C74 M' a5CE1 a.1N It]Jp OF CONDUITS
BRINGS CALL
COORDI CONNEETOHORIXBTALIATIOX
OF CONDUITS ANDPULL9TCRCALL BERVCE COORDINATION AT(-A7J St1Blm
.VL TO6 G EOULE ASCE STANDBYASINET W
].ALL AGE CON DOCTORS TOSEINSTALLED IN GRAY.SCHEDULE K%EST) )CAL
WL2 NEW PD: GRADE,PVLCONWRNE ES aEHOLDS WBERSOURCES MIxbRWIN ITIL EQUIREST).
l/ Inslall'. MAINTAIED
N 1f VERINDEED E ITICAL NCXESAND 3 MD MHORRONTA�LNCHESECQLUEMANCE BETWEEN
ELBOW KIT-JKTD CABLE-#2 AL GAS AND OTHER UTILITIES.ALL FINNS A INCH 5 SMALLER TO HE DR INCH PAGES.
ALL BENDS MUST N FACTORY MACE.ALL ELBOWS URGER THAN 4INC 4 i0 BE
CCS 90L+o iP 7.21201240 MP 25KVA NTLB FORRU ADIIUS.RCIDSTEEONR R,APFORVED.FBANY �XLASS BBENNxS PETNANIRED
COF 15'FEET OR
<ry , 3'F G. I Fp DEGREES IN BEND.PVC NH EDU LE 40 BENDS ARE ACCEPTABLE FOR RUNS OF
'1!.
-U A.
VE-I ^^ 'Pc LF IN PEETOR LESS.THE MAXIMUM TOTAL SENDS INANYCONDUIT RUN IS 210 DEGREES.
qB � N�'I.��jS SPP �( A DIRECTONALSORING REQUIREMENTS.BLACKHDPESIOH DEDITYPOIYEMELENE)DUCT
tl'.L V ` OR SCHEDULE M PVC WTH A MECHANICAL GOES ECTOM(CERTALON OR LIKE MECHANICAL
\ ER CONN ECTION PRODUCT)AS AN ALTERHATNE TO NOPE DUCT.HOPE SHALL MEET THE
.4 e, �- J ,� REOUIIMENTSOERSiE SPECIFCATIONLERSHISRMULABLE ON REQUEST FROM PGE PROJECT
Im 1y BB MI' MANAGER).FORSAFETYRUWNSTHEDCTSHµLBEBV.CKYMTH3E0VALLYBPMED
2C U6Nxmn 14,UnbwWn PCAT]3 290 1)p1 EXTRUDED REO STRIPES(NNCH BASPECIFCATONPEOVIREMENII.MANORELTESTOF
''"]]��YYYYYY�PPPSP HDPE PIPE IS REQUIRE O AFTER INSTALLATION ARM ME INSPECTOR PRESENT.
M 2RB p5025143 )I1]SIE 1Z
3.ALL POI TRANSFORMERS TON INSTALLED 5 FEET MINI FROMNIYCOMBUSTIBLE
1 A IRS 378 BUILDING.VMLLOR OVERHANG M04 FEET)MINI PROMANY FIRE HYDRANT
]+G!. yOf B 16 16J6 WE TRANSFORMERS MUST SE WRHIN I5FEETOPApRNEABIEAREA.
N'-14 1 C 100 37M ALWAYS MAINTAIN ID FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS.
tf6 WL1 PD4732: y e.T MSFMMERPADMET NSETSOTNATTHET PI82NCHESA VE
-C+ FBAL GRPD.CONDUIT B TO BE INSTALLED IN PAD M INDCATED IN DETML
16A."O""
Install: vres YDroEXTEND,lxcx AlIDVE THE MD.
�11Nmvm .� ELBOW KIT-JKTD CABLE-#2AL I.STEEL SCR PIER POSTS ARE P REQUIRED MOUND TRANSFORMERS THAT AN E EXPoSED
•�r 4 y.,)� g TOVSHICIES.
t� �R'1ky0 NOTE:STANDBY CREW NEEDED a Y R.ALLSWESN"VAULTBTO NBETATNNALGRADEVATx6 INCH GFUNELYeEYD
CONDUITS ALBNED TO ENTER THE VAULT END LOWER KNOCKOUTS(TERMrFDUCTSE
J �� CUSTOMER 70 PLUMB UNDER '5t, 4?°c IEEE DETNL OMMETCH)
J d5. A yp Cn EXISTING PD-8732 PQ 9. ME TO BE NOTIFIED AND INSPECTAUEDNWIT,VAULT AND PAD INSTALUTIGNS.
'4nymNn-'i 1014 C D 0. BEFORE MCKFLL.ALL NEWVAULT 6 PAD LOCATIONS TO N FIELD VERIFIED
wp'" q, B^ea b WIN ME AND CUSTOMER REPRESENTATIVE.
]3 Nil.
RIR
•
OSPf 1'JiU fS4y 10.a EFERTOPGEQUBEWNTSSERVICE
LINK TO REQUIREMENTS BOOK
ERAL.CFOM VIER DETAILS
11.DESONBV EDONSTANDMOUNDERGROUNDEQUIMEHT.NONdT OMD
UY
NDERGRWND EQUIPMENT AYRE AN OPTION ATM ADDITIONAL COST TO
THE CUSTMIER.
1].THE POINT OF DELIVERY AND DIVISION OF OWNERSHIP BETWEEN THE CUSTOMER ANO
IN-
ASIA-- VICINITY MAP A'0 MEMEL BEAT THE LINE SIDE OF THE NEWCUSTOMER PROVIDED SNITCH GEAR
]BDeuD ., PRE-CONSTRUCTION MEETING/TRENCH AND CONDUIT INSPEC'TlO
roEMlmrvr YOUR PROJECMT REQUBES A PRECO ISTRUCRON MEETING,CONTACT YOUR SERVICE&DESIG
MOF:I'N NMx,�R PROSECTANAGERTTC20WORKING DAYSPIMRTOEXCAVATIONTOCDORDINATETHE
TM tl ce,x , PRE-CON.PGI FIELD CONSTRUCTOR COORDINATOR(FCC)WILL PROVIDE YOUR TRENCH
Y
V M"CAW rwi..� I Com"'I ..'U„` XO1P4 ANDCONDURINSPECTONS.
ARMS CONs1R M OJRRAUMI
AS SEARLE�.wH«tlx AREA ..a,„....M..,o�_..,.s.
1r N, N! eaYSxL MARE. eDEEP.-
cok cerMpWAMN GP Pn rel FOnmAn: MEA'
.IJ_TN.KWM(H. NEW PO-311 Mo. NAM)¢narveNn di
_ I� u� _SBI PIG REVIEW �� �..e 5&/ILTBYOES.GNER:
ANY DEVIATION FROM THIS DESIGN MUST Nzsoorn - -
8131!1021 IAOn
ow
IBEAPPROVEDBYTHE PGEPROJECT MANAC.ER TRAxcPAOPc£ n. 10]0001 100000t5WALXC MORMONS)
PmaaP 2DDA Imrz4a 1P UG SPrviw buNMI PSPMmP b1 PN w.lm
GEL 811 BEFORE FOU OIG \ TIGAR0.1'J3JB TIGARp-IJ33] ITz22
OREEON LAW NO UMESYJLM.1WRUIE5AOCIEFY B GE/
IGDONE£M£R. TLSINy 12100-12DD9W MAIN sT TIGARD
INOSEFRVIFSAMHIfOMNIN OAR 951{G1Vpl0 N L Ai
I.ollAIDMINWPN]Of YN 4yFC� P10vIEe21NIR1AFIMN IP UG SEMfl 1.futlElE 6kmEbT PVPIIN $)IEE!
IxF ILOGRYUL11x6Go M(GON IRILIIY Jf. L -C
msrR.ErSoxefs9z]uawN FiRBT $WRPS Esn.HERE Galmin USG9.Inkrmep INCREMENT urvrr s c
M
TO REQUEST UT£IFYIO(ATFS EJIL ME ORF60N BNNwE.B�BtOSIOW. PI IEsn Ia9AE.MET EYICMB(Horg").ESU"-, WASHINGTON C]103A xMSV 1CF1
UTILITYNOTMCATex ttxTER,eff nLEPST A�BEM Kou Ills Koee.Esn(TMnab1.N(xC(P)CpenSheeVAPpLmMDubrs • Hen EI 503 BY1-5188!ARA LEAKE
1 PU RANDS DAYS RINGS TO EXUVANON PD-6J32 G10 xl[OS U9eTComlunRV