PFI2022-00126 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
s COMMUNITY DEVELOPMENT Permit#: PFI2022-00126
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/18/2022Parcel: 2S109DA08100
Jurisdiction: Tigard
Site address: 15029 SW HAZELCREST TER
Subdivision: SUMMIT RIDGE Lot: 58
Project: 15029 SW Hazelcrest Encroachment
Project Description: Encroachment permit for moving pod storage for one(1)week; 16 x 8 x 8 moving pod; 5/21/2022-
5/29/2022
Class of Work: FEES
Type 2-Sidewalk/Driveway Approach Description Date Amount
Encroachment Permit 04/13/2022 $25.00
Owner: Total $25.00
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tigard-or.gov to schedule inspections online.
Contractor:
PHONE:
Applicant:
MELISSA MOTT-OROZCO
15029 SW HAZELCREST TERR.
TIGARD, OR 97224
PHONE: 9712559646
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: See application Issued By: &ULL�&
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12022-00126
Type: Condition Name: Status: Severity:
PFI—Sidewalk/1 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any
agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI—Sidewalk/1 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and
violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and
suspension of work to accomplish clean-up-
PFI—Sidewalk/1 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Sidewalk/t 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI—Sidewalk/1 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA,current edition,American Traffic Safety Services
Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Sidewalk/[ 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.
Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively
maintained.
PFI—Sidewalk/1 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area
wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140 (Tri-Met)and
503-431-2345(Tigard School District) and other service providers impacted by such closure.
PFI—Sidewalk/1 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at
each end of the construction area 72 hours(min.)before initiation of construction work.
PFI—Sidewalk/1 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI—Sidewalk/1 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI—Sidewalk/1 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City
Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the
City Engineer.
PFI—Sidewalk/1 12 -TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI—Sidewalk/1 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Sidewalk/[ 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If
you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense
I
PFI_Sidewalk/[ 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before
digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the
applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with
affected utility agencies.
PFI_Sidewalkl[ 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI—Sidewalk/1 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads, ditches, etc.) as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI—Sidewalk/1 18-SEWER SYSTEM TEST Applied Notice
A sewer system air-test and/or DVD T.V.test report and one set of"As-Builts"shall be provided for review and approval.
PFI—Sidewalk/1 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Sidewalk/[ 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection,
and after completing work covered by the permit.
PFI—Sidewalk/1 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI—Sidewalk/1 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector.
PFI—Sidewalk/1 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI—Sidewalk/1 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Sidewalk/[ 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two (2)persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Sidewalk/[ 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain
or provide for proof of right-of-entry or easements.
PFI—Sidewalk/1 27 -PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Sidewalk/[ 28 -AS-BUILT DRAWING Applied Notice
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
PFI_Sidewalk/[ 31 -OTHER Applied Notice
Other
City of Tigard lrrr ,,, ,;. PF12022-00126
q f: [il f'T'Itl1(a i 11:01.It:: WORKS
Encroachment Perrmt N� r+aTM.�(7�r e�frttrilxarnal :.t
PROJi:C`r INFORMATION
I§ncctItiuxtc.r+!Od? ,'T'U(i atcrrnr�ryu fcx 00%week
lbEm-r? ,hin- r. I'.i wAare 0.'trt4st(t ! utm C7 Priv:k1cly 4mTKd Struourc C' I1trW44w
s I I ! IN I t 1k 11:i I it 1\ xss:.lr t .w.r7'rA. IT'�0.-h�brr 8f'0ltk- tr'ir'o.}04"trd'dk'r> °s raec4.,cx-tgr a ,04
r iAr it a,*.s.rr%pArogx i).
15829 SW Haxolorost T", Tigard, OR 97224 Storage of POD 1604. fQr nvy,riN, One w tib
frame from ai-21P22.W29Q022
APPLICANT/ PSR[ PEWIN tTWNER INFORMATION I Is.?tlfaarn -'%4r , Pr q.-m OuvwO Oil Y00 NO
Applicant :nw: Wllssa MOU-Qro2C+G Pmq,crty(ft-ncr. Kj'At
A can Addrt-o lbdla`'V SWHex* ;s* orr i5tl29 SW ti�iz Ic rst Trro
1'Ith & mTI root}a'kdatTc%.: �__e .
[:itra Tiq irtI wiarc, OR ;.,1,. 97224 Cit} T�r4i wtai,- OR ,. „ 9722*1
1xFtnme_$F1-1 • 's i�� ! f;,,rt n"0Y1CQ0W14 Q i"hr.•t►c 671,25&8445 lattai3: oh"'Com
f
TIM 1:'w{ Ht].t[:ti 7 Eh 1"PI-:!L?4!1'f t5 wt."RJECT TO THE PR[fNISiIONS OF Tirard Murricapd[o&
126aF+rrr 11.14. 1 rcaif} shat shi iP IN, ,4ppl►-CA4i*n is 411* turd c.:rrtrn to the kbart of my
kjivwlv4 V. I have tca[I, and I Apart tip he b Hirul 65 Tilit"1,kiwo cipraT(4)dc l,hapwv 15.16-
1
rim M(Oi5� Mott-0romoA lican Signa ne < ncS
I1ruprn7•0mmcr8Wutarr:,7t , T . ner: �POk
IF INSURANCE IS REQUIRED RV[:ITT 01; TIC.rARTS:
Immunrt 1xr6cr\ ._— Imo, E'Xpratirrn!}art-:
.,::cr;, It : SPV _ Rr c6vt<a 11att: 3/31/2022
Appr ' '^ .us . eco
Jt t, {
/+� y ,r ,+�q L,-,�pay,,,,; ry.� ,-y;�, . Iyr;�;' �"''. z ... _
Wv' of Tiga 31 C ,T N'FW LW, ' vird,ow#.,,`A 9i M awwwr
ed����
Allm
a
4(y
w 15029 SW m N
Hazelcrest Terrace._. r h
i
V
s
14993
g d
saw 77"
K
4
d �
SW Hazelcrest Way SW Hazelcrest Way SW Hazelcrest Way
t
I
N
ro