Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PFI2022-00123
CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12022-00123 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/11/2022 Parcel: 2S 112 BD04000 Jurisdiction: Tigard Site address: 15065 SW 79TH AVE Subdivision: 1991-096 PARTITION PLAT Lot: 1 Project: 15065 SW 79th Sewer Project Description: open trench install new sanitary sewer lateral from the home to the existing stub at the edge of ROW; decommission septic tank Class of Work: FEES Type 2-Sidewalk/Driveway Approach Description Date Amount PFI Permit Fee 04/11/2022 $300.00 Owner: Total $300.00 REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: 6ka-a--.0C - v n*e Ml d ILC PO BOX 5999 BEAVERTON, OR 97006 PHONE: 5037479312 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant See application Signature: Issued By: Hope Pollard Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12022-00123 Type: Condition Name: Status: Severity: PFI_Sidewalk/[ 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Sidewalk/[ 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI—Sidewalk/1 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Sidewalk/[ 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs,pavement markings, mailboxes,etc.shall be reinstalled or replaced,with like kind of material.Obtain City approval of restoration work. PFI—Sidewalk/1 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA,current edition,American Traffic Safety Services Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI—Sidewalk/1 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices,flag persons,etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI—Sidewalk/1 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic,at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services:503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Sidewalk/[ 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Sidewalk/[ 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI—Sidewalk/1 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m.Mon-Fri unless otherwise authorized by the City. PFI—Sidewalk/1 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Sidewalk/[ 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Sidewalk/[ 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Sidewalk/[ 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE:Damage to utilities shall be corrected at the permit holder's expense PFI_Sidewalk/[ 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI—Sidewalk/1 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Sidewalk/[ 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Sidewalk/[ 18-SEWER SYSTEM TEST Applied Notice A sewer system air-test and/or DVD T.V.test report and one set of"As-Builts"shall be provided for review and approval. PFI—Sidewalk/1 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI—Sidewalk/1 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work,prior to any staged inspection, and after completing work covered by the permit. PFI_Sidewalk/[ 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Sidewalk/[ 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Sidewalk/[ 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holders expense. PFI_Sidewalk/[ 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may,at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI—Sidewalk/1 25- EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI—Sidewalk/1 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI—Sidewalk/1 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI—Sidewalk/1 28-AS-BUILT DRAWING Applied Notice One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Sidewalk/[ 31 -OTHER Applied Notice Other M City of Tigard PFI #: 2022-00123 8 FNGINEERING Dr-PARTMI?NT Public Facilities Improvement (PFI) Permit PROJECT INFORMATION QTYPE OF WORK Project name: 15 � --11 J 5W -1�Av0 TYPE t-FrAnchm l riliq\X-4,r `` r%Tfon t"I lls\\X\,PGE. 'Pr utilin, Brief dcseripuon of project: OQ "�`1 l�hG1ft 1riS�Rr���Q,� apvne Se W e c tAl e c 1 �Vowst t\N6 �i Dy, a J)�e TYPE 2-R0A'Swkwalk/Dnecvcvr ka-er a O ' w,ai perlonncd for the purly,se o: ,S . W• • Si k1walk in.rrllsti..n qK npir • Dmcxvt•appnztrh inatalWtinn and rtpxir SITE INFORMATION • Sanitary sswer lateral installan.,m and 15 O r^LJ 5 W —7 AVC Ve main line rap Location (address if available): t0 n — U TYPE 3-gall Scale Mvckrlxrmnt %M4 perfunncd with bnd use apprcx at which includes any of the fidltrwinp • Sululivi%ka, I'artintau APPLICANT INFORMATION • Streetwwaning • \lainlinc installstbm for sanita+n• wAvr, Name: .u,nn nmr, TWd water, atxl Tigard Mailing address: 'A:nCr Sert•irC arca U TYPE 4-Small r:vll'Yechtn.h,gv City/State: !_ill: -__ © TYPE 5-Tgmnl TnanKle Phone: Email: Phone: _ NOTE: Typo I and 2 applieatitm5 may Ik Contact name cmailed to r=icmutJus and ur.0iN, Phone: Email: CONTRACTOR INFORMATION -Q Same as applic m Namc: 1�G� V-GG�, L-LL CCBNumhCr: Mailingaddress:Tn �0 _ Cits/Starr: Vtt +_ zip: q -IbK phone: 5D3. 1.°�31a, (;mail:•{n[olll�`oIAI. CotkUr<�tl�q( fv� .< aM ENGINEER INFORMATION Name: Mailing address: City/State: lip: Phone: Email; ADDITIONAL INFORMATION 1 isrimated value of work is required(if to er$5.CHkI):S—'�Ii (within the public right-of-way) Is work related to a LAND USE DHCISION-r ❑Yes ❑No Case number: City of Tigard • 13125 SW Ilali Hh•d. • 'I yawed,ihcg4rn 9?223 • www6gard-orgm- 5071N-2421 • Page 1 oj4 �;V3 - �-Zq-y-79d APPLICANTS NOTE: person specified as"Applicant"shall he designated"Permittee"and shall provide financial assurance for unrk,if required by the city pursuant in TNTC 15.04.140. With fhr exnpdon of a unlit/cgxr+nng purrtrant u,a tiwlil fiw whisc tK hanw with dtc t:in a tf Tigard,mien the reamer and the applicant arc differrnt pagrlc,the applicartt must he the pureha.Cr of rccurtl or a k� VAV it po�.�s�ion with writttm audusdntktn from rhe twmrr or an idem of the uwrta. The owner must silm this application in the spact ptotxlt-i ur submit a wtiuen authurirutkm wilb this appliunon. Vmnchivxl tr I iornwrl Utlfidert atv no it tn'quirol to t4nAin dw,Arncr's aymaturr un the application, 1,the applicant,certify that: is To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted, l will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. 1 V �•r o4F � '�a►�� cant's or horized age s"I tiro Print name Dat Property owner's signature (if required) Print name Date Case No:PF12022-00123 permit fee: t-4W Od Itccetved by, SP�VV Darc. 3/30/2022 Approved by: �i'!/Y1f Date: 2`(�IZ(l Notified by: �nttus�, Date: Ciry ofTigard • 13125 SNN'I call Blvd. • 'ligan/,oregun')7??3 wwwtiganl•oegtn- • x03.718.2421 • Page 2 of 4 Location: / 56G.S"Sv-N( '79rrtAVF T) 6 AVLL Name: B"DWACc6YZ Date:3- 3 - 2 I NJ Point of Access: a � Pipe Type: y "gas ti y,f cxsT 'Z q ~Sobs Ge,2 a Depth At Home: z ' Depth at Curb: L CnaT� OA�G� tJ Depth At Main: 3 ' 5 _ Machine Access:`Y N 0 Roots O Pooling O off-Sets C� O Cracks 1 Repair Type: Njfw J Length of Repair: 3' Notes: DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL.PFI PERMIT FEE Pan is Required submittal fee is I IPm of dw Net PFI Permit Fes.Scv hekow for calculations.Minimum of Saw. NET PFI PERMIT FEE Part 2: .111 nom-warer s ctcm improvements cngincer's estimate X 7%(less the initial PN Permit Fce). WATER LINE CONSTRUCTION FEE Part 3: .kH Public water system improvements enj�incves estimate X 1? . [-OR SI'AFFt SE ON]-N FOR STAFF USE. OWLY 1 SUBMITTAL QUIRETYPE 4:SMALL WIRFLESS FACILITN MENTS CHECKLIST TYPE 1 AND TYPE 2-Must include a sketch Lhoe>applicant hacc. ril:?u-of-w^ay liccn,r+ U Yes ❑No showing; Undcr the witcless facilities standards,is the proposal ❑ [Nincnsions considered?(check all that apply): ❑Small(:ell ❑Macro ❑ Street Name ❑ Shc Address I low many instal)sites are proposed as part of this permit Application? TYPE 3- Must provide 4 sets of plans(sized 24 x 36 or 22 x 34)and an electronic version of all submittal The proposed equipment is located(in which of the following: items. The plans must that include: ❑Public Right-mf-Way ❑Private Property C3 cover_Site,Vicinity,Abhrcviati,m,I zgcrxl ❑ Genet a]Nota(0ty,Water,Sewrr,etc.) If equipment is to be located onprivalr property,dcuribc the ❑ Street(Plan,Profile) type&use: ❑ Water,Storm And Sanitary(Plan Profile) ❑ water Q"ity F-aciktics © (:xading ❑ lantlscapingri'rcc Plan ❑ (.ompostitc utility Plan(l:leetrieal,Plaine,Gas,Storm, Sanitary,Water.Slgfla},K.Street light',etc.) ❑ Details ❑ 7'raftic Sight I)istartcc ❑ Signing and Striping ❑ Street light Plan and Photometric ❑ hriginecrsscal/signature ❑ Sheet 121x.1(pm(eel land use name,revision and plan l)k hk,ck,dates arsl sheet rluaml)Cn-) ❑ 1rn)nnccr`s(instruction t:stimate Additional Submittal' (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Rc(xon ❑ 1'reliminary Access Kelvin(Sight Uisrance) ❑ Proposed Plat ❑ Pathway I)c.ign ❑ Wam Provider Approval tali, u/Tigard • �- Hall Blvd, • Tigard,(litegon 47W • w%%1il,+ard-org' • ,)3.718-2421 • Pag 3 of 4