PFI2022-00122 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
i COMMUNITY DEVELOPMENT Permit#: PF12022-00122
13125 SWHall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/04/2022Parcel: SEG1384
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: Comcast 724371
Project Description: Overlash fiber to existing strand; SEG 1384, etc.
Class of Work: FEES
Type 1 -Utilities(gas, electric, data) Description Date Amount
PFI Permit Fee 04104/2022 $300.00
Total $300.00
Owner:
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at vnvw.tioard-or.gov to schedule inspections online.
Contractor:
PHONE:
Applicant:
MITCH BURGHELEA
11308 SW 68TH PKWY
TIGARD,OR 97223
PHONE:5037985785
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
PermitteelApplicant
Signature: I al ra Ptnn
Issued By: ��/-----
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12022-00122
L2tL Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law, the Tigard Municipal Code, and the terms of any
agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and
violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and
suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced, with like kind of material.Obtain City approval of restoration work
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA], and Oregon Temporary Traffic Control Handbook [OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.
Traffic control devices, flag persons,etc.,shall be in place prior to initiation of construction work and shall be effectively
maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses,residents and area
wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140(Tri-Met)and
503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at
each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m-to 3:00 p.m.unless authorized by the City
Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the
City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If
you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI—Utilities 15- UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before
digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the
applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with
affected utility agencies.
PFI—Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI—Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches.etc.)as may be necessary,as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI—Utilities 19 -PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting-
PFI—Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection.
and after completing work covered by the permit.
PFI—Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance,and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and
provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI—Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector.
PFI Utilities 23- MONUMENT PROTECTION Applied Notice
Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI—Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may,at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI—Utilities 25-EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing, the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing,of any/all assignment changes.
PFI—Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain
or provide for proof of right-of-entry or easements.
PFI Utilities 27 -PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI—Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also,any improvement which may impact an existing public system or facility,shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineers certification of installation compliance(Certificate of Compliance).
PFI—Utilities 31 -OTHER Applied Notice
Other
City of Tigard PFI#: 2022-00122
ENGINEERING DEPARTMENT
Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION
724371 TYPE OF WORK
Project name: L1 TYPE I—Franchise Utility Work
Brief description of project: overlash fiber to existing strand performed byNWN,PGE, or utility
agency
❑ TYPE 2—ROW Sidewalk/Driveway/Sewer
Wank performed for the purpose of
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral installation and
Location (address if available): main line tap
❑ TYPE 3—Full Scale Development Work
13200 SW Pacific Hwy, Portland, OR 97223 performed with land use approval which
includes any of the following.
• Subdivisions or Partitions
APPLICANT INFORMATION • Streetwideoing
Name: Comcast • Mainline installation for sanitary sewer,
storm sewer, Tigard water, and Tigard
Mailing address: 11308 SW 68th Parkway water service area
City/State: Tigard, OR Zip: 97223 ❑ TYPE4-SmalCelTechno1ogy
Phone:
(503) 798-5785 ❑ TYPE s-Tigard Triangle
Email: Mircea_Burghelea@comcast.com phone:
NOTE: Type 1 and 2 applications may be
Contact name: Mitch Burghelea emailed to rowpcnnitsa tigad-or.ew.
Phone: (503) 798-5785 Email: Mircea_Burghelea@comcast.com
CONTRACTOR INFORMATION ❑ Same as applicant
Name: Texstar Enterprises, LLC Attn: Scott Boyles CCB Number: 228361
Mailing address: 14122 Arndt Rd City/State: Aurora, OR Zip: 97002
Phone: (503) 793-3140 Email: scott.boyles@texstarenterprises.com
ENGINEER INFORMATION
Name: K&B Technical Solutions
Mailing address: 6566 SE Lake Rd, Suite F City/State: Milwaukie, OR Zip: 97222
Phone: (719) 244-1608 Email: Permits@kbmail.net
ADDITIONAL INFORMATION
Estimated value of workis required(if over$5,000):$ 8442 (within the public right-of-way)
Is work related to a LAND USE DECISION? ❑Yes ❑No Case number:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 1 of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid fiaachise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application.
I,the applicant,certify that:
• To the best of my knowledge, all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
Brad Rollins ate z�a3.3o,ostl:05-05 Brad Rollins 3/30/2022
Applicant's or authorized agent's signature Print name Date
Property owner's signature (if required) Print name Date
��AFF USE ONLY
PF12022-00122 c�c1Z/..J7� SPV 3/30/2022
Case No: Permit fee: Received by: Date:
Approved by: 104 14- 6 Date: .313f IZOLZ Notified by: AL Date:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 www.figard-or.gov 503-718-2421 Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7% (less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FOR ONLY • ONLY
TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3:DETAILED SUBMITTAL
CHECKLIST REQUIREMENTS
Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2- Must include a sketch
showing:
Under the wireless facilities standards,is the proposal
❑ Dimensions
considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name
How many install sites are proposed as part of this permit ❑ Site Address
application?
TYPE 3- Most provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
Cl Public Right-of-Way ❑Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes (City,Water,Sewer,etc)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineers Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tiprd-or.gov • 503-718-2421 • Page 3 of 4
SW „Y " .1; 1
Edge of Pavement
I �— Ditch ---- '
Streetlight I (OOF
—•—'—'—•—•—•— —t—•—
I I '
aslasrr:--
N I d
.� d! Existing House
r; I Existing
Driveway
I
M01
I
-I I I rl
0I I I c,,
bj
Existing Shop
L
Power`ol` ! I ole 1
95 1
I � 7ope—IiyLine—.—.—.s—.—.
Firms
Lt(FN)
I I I
Scale: 1' 30'
1 I I
I I I
� � I
1 TYPE 2:
MINIUM SKETCH REQVI REMENTS (Put N/A if not applicable)
North arrow Property lines&dimensions Existing utilities locations
(sewer,storm,water)
Street&street names All existing structures
Proposed work Existing curb or edge of pavement Utility& street light poles
Existing S/W or D/W apron Slope of property Trees
City of Tigard ' 13125 SW Hall Blvd. Tigard,Oregon 97223 0 www.tigard-or.gov • 503-718-2421 • Page 4 of 4
Adau eo Healthcare Solutions - SW Pacific Hwy
Y 0.
PROJECT #: 724371 '
�H 3
LL
UA O
13200 SW PACIFIC HWY LLW F�
�
mI,
UU =U'
PORTLAND, OR OR 97223 3Z 6io
N� I
K � I
LL
y 0 I
/ V
1
JEND
PROP 1R.
A �
1
JSW \i
C
-BEGIN PR-JECT'
L
S
N a�
� S£
OWNER/APPLICANT DESIGN BY SHEET INDEX a Y
COMCAST SHT DESCRIPTION ,y
CONTACT:MITCH OMMELEA:CONSTRUCTION SPECIALIST %8B TECHNICAL SOLUTIONS
P.O.BOX 25n(AMAS. E� o
MOBILE:IRCEA SURD CS RIGS-OHEETMCINITYMAP r
CIALNAMAS,OR 97015
EMAIL:MIRCEA et1RGNELEA@LOMLAST.LOM 1-2 RIGHT-0P-WAY PLAN (,n 1^
CONTACT:KYLE BROYlNING L
LEGENDBTYPM ,SL RSI
Q
EMAIL PERMITS@KBIVAILNET
off
ulu neeswEY M
EauNE n you m Ea low u E n mYeo
W TIEQIIEON VlEl1YNOT4CAM10EM1E11.
1119E R11LEi ME ETfQf1NN MR NiA1JN1 � OEEI
TMXIIJ1 EIiNiElYllll WYAI.W CMEe 6
111E NnEeevcEEuw>1.arcax unm
CS
r1otEKAnax cExtEEnoeeeemnmx 0 1-xex lwn
NRow .what's below.
Call bef ine yOU f rleown o
CMMEJTSl1-IE8�3
MATCH SHEET 2
V / V a 7 N
9990 ' 1x15 \\ g N� 9875 PV l/ a a.
wssT
\ 13405 \ N
9970J \ y dj n tm W
1x45 1177/32877mml� U O\ \ (IJ
\
IPA SCNE: I'•1OD' LL O A 2
U
\ 13405 13165 �6 y E 13410 y O N K
13425
13485 3088'52076 13505Z g LDL'
1x55 1x35 OYp9AaNNlWCA ET0/ `,� 9870 13N Z M6 Q�
EXISTING CMLLa111NO �qr- 1x10 w
7 / O
77465 0✓ 1x]0 13515 w
9645 v V
13475 `�T� 1x10 \ fi { g
�v 1178/328 1x80 J
G�L'y NL` 3089/26105 \ ' i
13430 13490 / 13545 N
5 9625 R a
17450 9970 / OVERNEWCABLETO / 55
EXISTING
CABLE/STRAND ggb
\ yyyy3
13530
13470 9640
1]6]5 9810 an / 1].564 ti @@
13625
9885
13570
138{5 g8gp
13560 \ 9875 1356/34451 III \ i K
� 13812 \ 13510 3
1179/328M \ 13380 /
/ 13855 C 98m
/ \\Y// O�5
13800 Baas t�''m. \ \ 17805 9555
13605 9600 \9555 G n
/13620 C! 9855 13560
NT/ {
13675 ���L 3267 1357/34452
13600 ^ d
\
1J80D Y
13660 / / \ \ /
9585
(�3s 13670 13M �`' 138]0 / 8
C� ✓mow 9850 \ \ 0j N Z g
�l 9615 Q g8�
S n37 \ \ � 8
�y �FiQ 17680 13620 3121/54453 "' M/34455 7!
5 � 13708 \ tr
17665 1]700 \ \ oil
13715 P� \ 9625 9560 �/ E
369'_
13855 13725 \ ; 1.ALL WORK AREAS TO OE RESTORED TO LB� R E
OTfER CONORION.
2.UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE vAEr
137 \1 JbBD \ •` RECORDS AND FIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT.
��rr �Arar• 9,IT IS TME CONSTROCTION CONTRACTORS RESPONSRIKNY TO FIELD
13700 \ arti+...rr•w•s LOCATE ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION,
WHEN WORKING OVER OR NEAR SIDEWALI(S.PROVIDE SPOTTERS TO HOLD PEDESTRIAN TRAFFIC COMPLETE REPAIR OF ANY AND ALL DAMAGES INCURRED SMALL BE AT THE
•rr���r�.1r
UNTIL CONSTRUCTION CAN BE PAUSED,OR IT IS SAFE TO PASS TNRIXIGH ME WORK ZONE. r�rAwNre�y EXPENSE OF ME CONTRACTOR. CAl1.Ea1281-1661]
13025
13035 12990 * B IL
� Q
13045 \ 3
U w
13055L 17K
130] / SCJIE:1'.100'
'o
40 N�
N ^C-9985 0
A-M p�
0
13125 13069 13050
s9eo �
fi�`G ` 999
9
` \ C* 3000 yyy
\ 995
EXIT RIGHT-0F-WAV TO PROP6[IV \
5
1]090
1]3/21®550] )
a
1174/32883
'L 10035
ni 1-67 4
FIN((1
OVERLASH NEW CABLE TO
o9BTNG GABLEISTRAND d
10045 /
10070 \ 3
8
1002
E
10060 /
10054
10058 10052 / 175/27953 10025
1]1]0 10056
\ L S/yp�
13240 / 10042 tO0a0 Ng. / O Je m
DDa2 \ U a Y
13310 looaz 10010 2
a9A 1.ALL WONT(AREAS TO BE REBTORED TO LIKE M BETTER CONDITION.
LINDE
13300 10-50 10008 2.RECORDS AM FIELD
OESHAVEIONS LIT ME FROU s�[eT
\ A-D 10006 RECORDS AND FIELD OBSERVATION981R ARE NOT NECESSARRY E%ACT.
10006 mw a...r�r..wr.10002 11]8/3287 n p�'^IArr. 3.LTC THE ALL
UNDERGROUND
ND RGROUCONTUTIES SRESPON361LHVTOFK:LD
WHENN NG OVER OR NEAR SIDEWALKS%20VIDE SPOTTERS TO HOLD OEOESTRIAN TRA FIC \
LOCATE ALL REPAIR
ANgNDALLEBWGESINTO CURRED HALL
uyA.TM����r EOE E Of
THE
CONTRACTOR
DAIMGES INCURRED SHALL BE AT THE rwiec.e
`.rr.�+Lrr..r. CM.£�3)28415333
NIrIL COnSTROCTKIN cw 9E PAusEo,on rt la BALE To vABS THRoueH THE waRK mNE. MATCH SHEET I ,,."j'�F�,��.d"..'."„ ExPENse of THe eoNTRACTOR.
S N
LINETYPES SYMBOLS m o
AERIAL CABLE JOINT USE FCLE ®POLE TAG LL
EXISTINGCONDUIT JOINT USE POLE WIiRMiSFORMER ®POLE TAG
NEW CONDUIT ---------------- POWER POLE WI TRANSFORMER ®POLE TAG
N Q¢
RIGHT-0F-WAV RNI POWER POLE XPOLE TAG �
EASEMENT mR CABLE POLE POLE TAG LL H
PUBLIC UTILITY EASEMENT FIIL TELEPHONE F%E O POLE TAG LL
O
PROFERTY LINE EXISTING CONDUIT RISER
CENTERLINE CA PROPOSED CONOU T RISER � U
FACE OF CURB FOC PEDESTAL 99
EDGE OF PAVEMENT [OF VAULTM Np E
EDGE OF CONCRETE [OC MANHOLE e
3
EDGE OF GRAVEL LOC INLET m Q
EDGE OF SIDEWALK 6/N VALVE g x
EXCAVATION LIMITS ----------- METER Q p]E
SEWER --- s - HYDRANT ZY
STORM - so - POWER TRANSFORMER ® K
WATER x STREET LIGHT F0.E
GAS TRAFFIC SIGNAL POLE Q
POWER F SK.NAL CONTROLLER
TELEPHONE - '- CROSS WALK SIGNAL O
FIBER OPTIC -Fo- RAILROAD SIGNAL
a
CATV - ury — TREE O
TRAFFIC SIGNAL — iRd -- CULVERT
K
STREETLIGHT c
PENCE LINE IS
y
GUARD FAIL F( E
yxy G
RAILROAD TRACKS e 0 O{pj i
mE
BUILDING FOOTPRINT °4 g
OY
7 EE
N� d
U ®
>L
CMME'3]2U-15633
Page 80 2011 Edition
5.3 Two-Lane, Two-Way Roads
Shoulder Work wl Minor Road Encroachment Diag. 300
Use this detail for non-freeway work which extends into a travel lane and
maintains a minimum 10 foot travel lane. If a minimum 10 foot travel lane
cannot be maintained, or when traffic cannot safely pass by in both lanes
simultaneously, use the appropriate lane closure diagrams —for example,
Diagrams 310 through 350.
A lane closure may be appropriate for conditions such as high traffic
volumes, high speeds, and inadequate approach sight distance to the work
space, or heavy equipment adjacent to the travel lane.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Cones shall be placed along the entire length of the work space. If a
protection vehicle is used and work is in place one hour or less, the
taper and tangent devices may be omitted.
4. If the speed is 45 mph or higher, volumes exceed 2000 ADT, or there
is limited sight distance, consider placing cones or tubular markers on
centerline.
5. An arrow board in caution mode or truck-mounted PCMS with
"SHOULDER WORK" or other appropriate message may be used for
higher visibility.
Sign Spacing and Buffer Lengths (feet)
Posted Spacing Between Signs "Buffer"
Speed A B C Space
20 50
25 100 100 100 75
30 100
35 350 350 350 125
40 150
45 180
50 500 500 Soo 210
55 250
60 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 81
Shoulder Work w/ Minor (Road Encroachment Diag. 300
ROAD
WORK to
-
AHEAD
•
Initial
Warning A •
Sign
(ONOW •
® I •
•
Protection Vehicle
w/TMA(both Optional)
See Chapter 4 • Buffer
10'
ndnimum •
•
A ROAD
M NARROWS
(Optional)
B
ROAD>
M WORK
• AHEAD
Initial
Warning
Sign
September 2016 Chapter 5
Page 84 2011 Edition
Stationary Lane Closure with Flagging Diagram 320
Diagram 320 covers total closure of one lane of a two-lane, two-way
roadway. See the detail inset for the layout if using a single flagger to control
both directions of traffic on low volume roads (less than 400 ADT)with good
sight distance as discussed below.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Flaggers at each approach are required if any of the following
conditions exist:
a. Night Operations.
b. Work space is over 200 feet in length.
c. Sight distance is less than 750 feet from each approach
through the lane closure.
d. Traffic volumes are greater than 400 ADT.
4. The length between the Flagger Ahead signs shall not exceed one
mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one
mile.
5. Cones should be used to outline the work space when curves or other
roadway alignments prevent clear direction for the motorists to pass
the work space safely.
6. Cones along the work space are recommended when posted speeds
are 45 mph or greater,when working under heavy traffic or when travel
lanes are narrower than 11 feet.
7. Extended queue signing (see Diagram 5-4) should be used when
traffic queues extend beyond the initial advance warning sign.
8. When flagging near an intersection,the"Flagger Ahead" (CW23-2)
sign should be visible to traffic entering from any side road. Additional
advance warning and Flagger Ahead symbol signs may be placed on
the side road(s).
9. Sign set-up and flagger placement shown may be used for intermittent
full road closures of 20 minutes or less.
10. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should
be considered on high volume or high speed roads, or when extended
queues are expected.
Chapter 5 September 2016
2011 Edition Page 85
Stationary Lane Closure with Flagging Diagram 320
<¢3 C
;< o
76
CO W a
o - C
O O
CD
M
� l 1 0
m�y Mc3
I-
a
_ _ _ m �
• Q O Q
I y I •• m am
I � $ I • >oa
� • C G L
I I I ono
®- � • m m
� <
I 3
I I •
II � '� ��� I • m
I' g I •
CL ; Zf •
C o g j • .�c
o>>v I �C
r I
tL J v Y I I o
as
y • / ¢o
pt�O m
Cn l t cc
Yu
Sign Spacing Buffer Lengths(feet)Buffer Lengths(feet)
Posted spacing 0ei een Signs 'BuffI
er" to
to
Wed 0. a c Space O O
20 50 Z¢� O
25 100 100 100 75 O 0
30 1 100
125
0 350 350 350 150 ir
45 180 p 9
50 SOD 500 500 210 3
SS 250
60 285
65 700 700 700 325
70 365
September 2016 Chapter 5