Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PFI2022-00118
CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12022-00118 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 04/04/2022 Parcel: SEG781 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job#M2819920 Project Description: Provide 3ph ug 120/208 2500 amp svc to 99 apts and retail. Class of Work: FEES Type 1 - Utilities(gas, electric, data) Description Date Amount Total Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at wvvw.tioard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: HAP ENGLISH 2213 SW 153RD BEAVERTON, OR 97003 PHONE: 5036725489 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Hope Pollard Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12022-00118 Tvoe: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc.shall be reinstalled or replaced,with like kind of material.Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA,current edition,American Traffic Safety Services Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCHj. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices,flag persons,etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic,at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m.Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules maybe obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary,as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity, the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work,prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector. PFI Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments,property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may,at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilibes 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI—Utilities 31 -OTHER Applied Notice Other City of Tigard PFI#: PF12022-00118 ENGINEERING DEPARTMENT . Public Facilities Improvement (PFI) Permit PROJECT INFORMATION PGE Job #M2819920 TYPE OF WORK Project name: R TYPE I—Franchise Utility Work Provide 3ph ug 1201208 2500 amp svo to 99 opts and retail. performed by NWN,PGE, or utility Brief description of project: agency ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): 11860 SW 72nd Ave, Tigard, OR 97223 main line tap ❑ TYPE 3—Full Scale Development Work performed with land use approval which includes any of the following. • Subdivisions or Partitions APPLICANT INFORMATION • Streetwidening Name: PGE [Nigel Khan for Hap English] • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 2213 SW 153rd Dr water service area City/State: Beaverton, OR Zip: 97003 ❑ TYPE 4—Small Cell Technology Phone: 503-672-5462 ❑ TYPE 5—Tigard Triangle Email: crewcoordination-westem@pgn.com phone: NOTE: Type 1 and 2 applications may be Contact name: Hap English emailed to; �;r..r,twgd-or. o . Phone: 503-672-5489 Email: crewcoordination-western@pgn.com CONTRACTOR INFORMATION 0 Same as applicant Name: CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: PGE Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-wap) Is work related to a LAND USE DECISION? OYes E]No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.dprd-or.gov 503-718-2421 Page I of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant, certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Nigel Khan 3/28/2022 Applicant's authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAF • Case No: PFI2022-00118 Permit fee: Received by: HPollard Date: 3/28/2022 Approved by: rR Date: lor114, ZO LZ- Notified by:�_Date: i l City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 109/6 of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR ONLY • ONLY WIRELESSTYPE 4: SMALL DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineers Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval Cityof Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www..tigard-or.gov • 503-718-2421 • Page 3 of 4 sw " 4_ '. C-1, I Edge of Pavement 1f— Ditch —# Streetlight IEi- Cl) e•_•—•--------- _r_._ 1 rxa, s Existing House I ' > 1 z� 1 Existing Driveway a3° C" 1 o �I � Existing Shop � I i Powerpole I I o l o 1 95' 1 Prroperty Line D I I ��. r IQ I Fire Hydrant(FH) I 1 I Scale: 'I"=30' � I I TYPE 1 I I I � I I i � I TYPE 2: MINIUM SKETCH • , rr North arrow Property lines&dimensions Existing utilities locations (sewer,storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigaxd-orgw • 503-718-2421 • Page 4 of 4 Page 118 2011 Edition Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths(feet) Posted Spacing Between Signs "Buffer" Speed A B C Spnoce 20 50 25 100 100 100 75 30 100 35 350 350 350 125 40 150 45 180 50 500 500 500 210 55 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 119 Lane Closure at Intersection with Flagging Diagram 620 1� TBC BEPREPMNtlRKmPeA B Buffer 4— ,~L V�� C ;8B qROMWpHKMEM • RDM WFM roRn q O B BE PRPPMFD ro maP B gEonRq i t W�D _ cRW September 2016 Chapter C11 -36D < 810-PGE VAULT Multi-Unit Complex Legend 3 PHASE, PADMOUNTED sT NEW PGE FACILITIES TO BE INSTALLED v ��FFT 1 VAU (UNLESS OTHERWISE SPECIFIED) vy" si�F 1. VAULTS BE SET AT LOCATIONS APPROVED BY PGE. 2.TOP OF LID TO INSTALL FACILITIES 20- Cpm t` BE SET AT FINAL W c m GRADE, 810-PGE PADMOUNT VAULT,WITH 810-T-2436P-TRANS2-PGE TOP, SW CLINTON ST / sow r Dry APPROVED BY PGE. PROVIDED&INSTALLED BY CUSTOMER Z /' • DO NOT S BETWEEN O A I VAULTS. FAULT INDICATOR PDlit_ 154 • • VT 92 4.INSTALL 500 LB y fir •• �� (MIN) TEST PULL- ————————, INSTALL 1-42 AL-TX EPR JKT PRIMARY IN ST PVC SWITCH •� STRING IN EACH WC CONDUIT,PROVIDED&INSTALLED BY CUSTOMER —_ • INSTALL#750 AL-OX UG SECONDARY IN 4 OF 8-6"PVC il_ __ GEAR �• �� PD-183 ----- r17- ———' CONDUITS,PROVIDED&INSTALLED BY CUSTOMER 80 ABC 500 •� PD 1'83- 12a/2oav j3-PHASE 128 04' 15' CONSTRUCTION NOTES: RSMru 15' TRANSFORMER-500KVA 2500A 1.CUSTOMER TO PROVIDE ALL TRENCHING AND BACKFILLING JOINT USE TRENCH WITH GAS,TRENCH TO BE 48 INCHES DEEP AND 30 INCHES WIDE,MEASURED FROM FRONT 0.78%VD FINAL GRADE. OF GEAR 0.85%FLICKER ALL PGE CONDUCTORS BE INSTALLED IN GRAY,SCHEDULE 40,ELECTRICAL ♦ GRADE,PVC CONDUIT WITH NYLON PULL B STRINGS (MIN 500 LBS TEST) ♦ 45,759A AIC PGE TO DETERMINE THE SIZE AN NUMBER ZO CONDUITS REQUIRED. 5106-PGE VAULT MAINTAIN 12 VERTICAL INCHES AND 24 HORIZONTAL INCHES CLEARANCE BETWEEN VT 0O ESTIMATED DEMAND:475KW ,` °'""` 510(rT�-332P-lGE ALL BENDS MUST BE FACTORY AND OTHER UTILITIES. LMADE.ALL ELBOWS LARGERARSMALLER TO BE 36 AN 4 INCH O BE RADIUS. METERS B / VT-92 OR RUNES OF 51R EIET OR LONGER,OR OR AND STEEL OR RISE Y LENGTH UNWITHDMORE THHS ARE AN REQUIRED 12103 180 DEGREES IN BENDS,PVC SCHEDULE 40 BENDS ARE ACCEPTABLE FOR RUNS OF 45'-31ST 6'EXISTING HoiTT� BACK GEAR 1 HOUSE -D eD lea ro a 150 FEET OR LESS.THE MAXIMUM TOTAL BENDS IN ANY CONDUIT RUN IS 270 DEGREES 2004 WALL TIONOS 1 RETAIL 4"TO PD 1`� !v;( r A141OWSET AT 0;Y K.E. 2 A PGE STANDBY CREW IS REQUIRED FOR OPENING ALL ENERGIZED PGE VAULTS ABC 2 AL•TX - - +�'S 2.IOP W M To JUNCTION BOXES,AND EQUIPMENT/FACILITIES INCLUDING CONNECTION OR INSTALLATION xA- 'P K BET AT NNAL OF CONDUITS AND PULL STRINGS.CALL SERVILE COORDINATION AT 503-323-6700 VT-94Q Q uisilNc 7•-2 GRADE € AFR O1OYTD BY POF TO SCHEDULE A PGE STANDBY CREW rr 4.DO HOT c4oss RL BFTweFH 3.CUSTOMER RESPONSIBLE FOR ROAD CROSSINGS. ALL CROSSINGS MUST EXTEND YAMrs. FROM PROPERTY LINE TO PROPERTY LINE. USE ONLY GRAY,SCHEDULE 40, THINK L) \ •� N 0 ELECTRROM ICAL GRADE, R OE'PVC CONDUIT CROSSINGS TO BE 48 INCHES DEEP,MEASURED SAFETY m CUSTOMER TO CALL PGE SERVICE DESK @ 4• •• 4uc M EACH 4 DIRECTIONAL BORING HEQUIREMENTS BLACK HDPE (HIGH DENSITY POLYETHYLENQ DUCT • • OR SCHEDULE 40 WC WITH A MECHANICAL CONNECTION (CERTA-LOK OR LIKE MECHANICAL 503-323-6700, TO SCHEDULE CREW STAND BY I CONNECTION PRODUC AS AN ALTERATIVE TO HOPE DUCT.HDPE SHALL MEET THE REQUIREMENTS OF PG SPECIFICATION L22501 (AVAILABLE ON REQUEST FROM PGE PROJECT FIRST! WHILE PLUMBING INTO VT-92 • MNAGEPo FOR SAFETY REASONS THE DUCT SHALL BE BLACK WITH THREE EQUALLY SPACE su^AuaArs EXTRUDED RED STRIPES (WHICH IS A SPECIFICATION REQUIREMENT) MANDREL TEST OF cBOTHED R HDPE PIPE IS REQUIRED AFTFR INS At A LION WITH PGE INSPECTOR PRESENT 6"NEI(HUN) 5.CUSTOMER TO PROVIDE AND INSTALL#644-PGE VAULT WITH TRANSFORMERS.#64-332P-2125 COVER, UTILITY VAULT MODEL AT EQUIVALENT FOR PGE PAD MOUNT TRANSFORMERS. '�y PADNAULT TO BE SET AT FINAL GRADE (SEE DETAILALL POE TRANSFORMERS TO BE INSTALLED 8 FEET (ON SKETCH . VICINITY 1 e BUILDING,WALL OR OVERHANG AND 4 FEET f MIM FRO A NYOFIREHYDRANTSTIBLE k �Irv�i v PGE TRANSFORMERS MUST BE WITHIN 15 FEET OF A DRIVEABLE AREA. Ca<TOyB ALWAYS MAINTAIN 10 FEET CLEARANCE IN FRONT OF ALL TRANSFORMERS- . Q 7.METER BASES FOR OFFICES,UTILITY,LAUNDRY AND RECREATION ROOMS TO AVE FACTORY INSTALLED MANUAL CIRCUIT CLOSING DEVICE (LINK BYPASS ONLY) . Regal Tigard SW AT..S B.ALL METER GASES TO BE INSTALLED ON FRONT OF BUILDING OR WITHIN 10 FEET OF FRONT ON END OF BUILDING. W Costco Gas 9. TEFL BARRIER POSTS ARE REQUIRED AROUND TRANSFORMERS THAT ARE EXPOSED B 10ALLSWITCH VAULTS TO BE SET A7 FINAL GRADE WITH 61NCH GRAVEL BASE AND CONDUITS ALIGNED TO ENTER THE VAULT END LOWER KNOCKOUTS (TERM-A-DUCTS) . (SEE DETAIL ON SKETCH) 11.FRONT LOT PUBLIC UTILITY EASEMENT (P.U.E.) TO BE 8 FEET (MIM . 10 FEET (PREFERRED) RIGHT-OF-WAY PERMIT NOTICE: D . Costco Wholesale 111T -• =sr� A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY 12.ESTIMATED LL1AMPS MOTOR STARTING CURRENT FOR FLICKER CALCULATIONS. WORK IN THE RIGHT-OF-WAY MAYBE PERFORMED. ONLY PGE APPROVED TRANSFORMER LOADING AND VOLTAGE DROP CALCULATIONS BASED ON 1.-`KW WInCo Foods CONTACTORS AND CONTACTORS WHO HAVE MADE OTHER SPECIAL PER RESIDENCE. Q AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER PGE'S PERMIT 13.CONSULT WITH PGE REPRESENTATIVE 2 WEEKS BEFORE STARTING MAIN POWER THE CONTACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS TRENCHING FOR A PRECONSTRUCTION CONFERENCE. INCLUDED IN THIS CONFERENCE Costco Tire Center Q BEFORE WORK 15 TO BEGIN. A COPY OF THE PERMIT MUST BE ON SITE WILL BE EXCAVATOR,PGE,TELCO,CAN,AND GAS. 9:awdtronics ATM 14 DESIGN IS BASED ON STANDARD UNDERGROUND EQUIPMENT.NON-STANDARD UNDERGROUND EQUIPMENT MAY BE N OPTION AT N ADDITIONAL COST TO THE CUSTOMER. ® 11911 PGE CONSTRUCTION DRAWING so SmilesDenustard,yandM DATE: 9/28/2020 SCALE:NTS ACCOUNT, AWD' 1000004597 JOB NO. M2819920 JOB SITE TITLE B NTACT SERVICE COORDINF' ESSEX CONSTRUCTION F T iPEHCH pIq CCNp1Rq$PECT,CN ec .o eec�iu�mu HDr iHsiur m�.� CIRCUIT SIZE T,fli IN,6TI✓EW.15l6D•.B .'s D WEST PORTLAND-WEST PORTLAND 13,WEST PORTLAND 72ND 6 R,._. PG E „X,7 w 1e LOCATION Fldo'S B 48 Which Wich ' - North Pizzeria Superior Sandwiches .��, ANY DEVIATION FROM THIS DESIGN MUST ` 11880 SW 72ND AVE, TIGARD raLewr•orl,Ry BE APPROVED BY PGE PROJECT MANAGER DESCRIPTION o Q ® Pedia FHE TaH. cAL en PROVIDE 3PH UG 120/208 2500AMP SVC TO 99APTS AND RETAIL SPACE r0�` Mllu, ON LAW REWIRES YOU TO FOLLOW RULES ADOPTED COUNTY SECTION (S) WORK WITH SHEET E OREGON UTILITY NOTIFICATION CENrER. ns Primfnq o - - E RULES ARE SET FORTH B OAR M5 001-0 0 JU WASHINGTON C11-36D ��. Electrify America I_ GH 952-001-0090.YW MAY OBTAMI COMES aF BEAVERTON 1 OF1 O A Charging Station ULES BY CALUM THE OREGON UTun LINE CREW CENTER DESIGN BYPHONE (50 DRAWN BY ;ik9 9 Reslo,ah IGTIONCENTet,ON1INff MTION•(503-M-leend EWESTUTILITYLOCATESCALLTHEORFGON I ,MnrrlN 2213 SW 153RD DR WAYNE BRABHAM 672-544D CESAR DEL ROSTILITY NOTIFICATION CENTER,Bit AT LEAN Cp8 .bel di BEAVER ,OR 97006 2 BUSINESS DAYS PRIOR TO EXCAVATKKJ y..dig. ©PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED