PFI2022-00098 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
s COMMUNITY DEVELOPMENT Permit#: PFI2022-00098
Date Issued: 04/11/2022
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Parcel: SEG2024
Jurisdiction: Tigard
Site address:
Subdivision: Lot:
Project: Ziply W0915522
Project Description: SEG2024/Ziply to splice fiber in 3 MH's and access 1 terminal hub
Class of Work: FEES
Type 1 -Utilities(gas, electric,data) Description Date Amount
PFI Permit Fee 04/06/2022 $300.00
Total $300.00
Owner:
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tigard-or.gov to schedule inspections online.
Contractor:
PHONE:
Applicant:
KAYLIE ALDOUS
4155 SW CEDAR HILLS BLVD.
BEAVERTON, OR 208747
PHONE: 5032096856
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work-
Permittee/Applicant See application
Signature:
Issued By: HPollard
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12022-00098
LM2: Condition Name: Status: Severltv7
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of any
agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and
violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and
suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc.shall be
reinstalled or replaced,with like kind of material.Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA, current edition,American Traffic Safety Services
Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.
Traffic control devices,flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively
maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic,at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area
wide Emergency Services:503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)and
503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at
each end of the construction area 72 hours(min.)before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times,including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m,to 3:00 p.m. unless authorized by the City
Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m. to 9:00 a.m. unless authorized by the
City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080.Copies of said rules may be obtained from the Center by calling 503-246-1987. If
you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI—Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before
digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the
applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with
affected utility agencies.
PFI—Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an unsafe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector,<Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI—Utilities 20-NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection,
and after completing work covered by the permit.
PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and
provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector.
PFI_Utilities 23-MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may,at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25- EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector,in writing, of any/all assignment changes.
PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain
or provide for proof of right-of-entry or easements.
PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28-AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
PFI—Utilities 31 -OTHER Applied Notice
Other
City of Tigard PFI#: PF12022-00098
ENGINEERING DEPARTMENT
. Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION TYPE OF WORK
Project name: W0915522 M TYPE 1—Franchise Utility Work
Brief description of project: Ziply to splice fiber in 3 MH's and access peed by NWN,PGE, or utility
agency
1 terminal hub. ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer
SEG 2024 Work performed for the purpose of.
• Sidewalk installation or repair
• Driveway approach installation and repay
SITE INFORMATION • Sanitary sewer lateral installation and
a uo
Location (address if available): 14945 SW Sequoia Pkwy Y main line tap
❑ TYPE 3—Full Scale Development Wank
performed with land use approval which
includes any of the following.
• Subdivisions or Partitions
APPLICANT INFORMATION • Streetwidening
Name: KaYlie.-�ldous • Mainline installation for sanitary sewer,
storm sewer, Tigard water, and Tigard
Mailing address: 4155 SW Cedar Hills Blvd water service area
City/State: Beaverton,OR Zip: 97005 ❑ TYPE 4—Small Cell Technology
❑ TYPE 5—Tigard Triangle
Phone: 208-576-4031
Email: pen iitdng@mountainitd.cotrPhone: NOTE: Type t and 2 applications may be
Contact name:
RussellWells emailed to rowperrrrits@.tigard-or.eov.
Phone: 503-312-7330 Ems: Russell.Wells@ziply.com
CONTRACTOR INFORMATION ❑ Same as applicant
Name: Northsky Communications CCB Number: 208747
Mailing address: 11818 SE Mill Plain Blvd Ste. 410 City/State: Vancouver,WA Zip: 98684
Phone: 503-209-6856 Email: gcastonguay@northskycotnm.com
ENGINEER INFORMATION
Name: Russell Wells
Mailing address: 4155 SW Cedar Hills Blvd City/State: Beaverton, OR Zip: 97005
Phone: 503-312-7330 Ems: Russell.Wells@ziply.com
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ (within the public right-of-way)
Is work related to a LAND USE DECISION? ❑Yes El No Case number:
Cityof Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 wWwalgard-or.gov • 503-718-2421 Page 1 of 4
APPLICANTS
NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application.
I,the applicant,certify that
• To the best of my knowledge, all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
Kaylie Aldous 3/16/2022
Apphc. is or authorized agent's signature Print name Date
Property owner's signature (if required) Print name Date
STAFF USE ONLY
Case No: PF12022-00098 Permit fee: , 61ti Received by: NT Date: 3/16/22
Approved by: %ila4 jj / Date: "gA11W7,Z Notified by: k�!R—Date:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 www.tigard-ozgov 0 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI)Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 10%of the Net PFI Pem-jit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FOR • ' STAFF USE ONLY
TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3:DETAILED SUBMITTAL
CHECKLIST REQUIREMENTS
Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal ❑ Dimensions
considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name
How many install sites are proposed as part of this permit ❑ Site Address
application?
TYPE 3-Must provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
❑Public Right-of-Way ❑Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers.)
❑ Engineer's Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
Cityof Tigard 13125 SW Hall Blvd. 'Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 Page 3 of 4
Ed a ofPavement
I � Ditch �►
Streetlight I —•—•—•—•—•�.� �r�.�
1 ° RaLv Daafr.
AA
f ; 1.�
•
I I
' T'�ropSs d'Se1werTirSe'� 1
I 1 - •
� I 1
y 1 I Existing House 1
ve 1 Existing
H Z, Driveway
I
a°i I c,
aj
Existing Shhop
' � 1
L
Powerpole i I c j&
1
1 I� 95' 1
1 0 7ro7per •LTne-----------
Firms Nytlrant(FH)
I � I
Scale:
I � I
TYPE 1 AND TYPE 2:
MINIUM SKETCH
I I I
� I I
' '
ut N/A if not applicable)
North arrow Property lines&dimensions Existing utilities locations
(sewer,storm,water)
Street& street names All existing structures
Proposed work Existing curb or edge of pavement Utility& street light poles
Existing S/fix'or D/W apron Slope of property Trees
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 Page 4 of 4
Page 106 2011 Edition
Diversion into a Continuous Left Turn Lane Diagram 430
Diagram 430 shows work in the travel lane(s) next to a continuous two-way
left turn lane with one direction of traffic diverted into the continuous two-way
left turn lane.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3—Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. When two or more travel lanes are reduced to a single lane before the
diversion, each lane shall be closed separately. Layout traffic control
according to ODOT Standard Drawing TM 852 for 5-lane sections.
4. A shifting taper(L/2) may be added in the diverted traffic direction
across the continuous two-way left turn lane (as shown). This option is
recommended when the speed is 45 mph or greater.
Sign Spacing and Buffer Lengths(feet)
Poatad Spadn88atwaanSipn "8uffar"
Speed A 8 C Space
20 50
25 100 100 100 75
30 100
35 350 350 350 125
40 150
45 180
50 SOD 500 500 210
55 250
60 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 107
Diversion into a Continuous Left Turn Lane Diagram 430
ROAD
WORK
AHEAD
B
jlylt
�H>EH
LANE
CLOSED
AHEAD
A
II
•
Buffer
Protection Vehicle
w/rMA(both Optional)
See Chapter 4
Buffer
•
•
•
•
U2 • I A
I
lyt B
4A~�
September 2016 Chapter 5
CUSTOMER'
OFOEF Y
ISttIED- WE: __
A RESS:
$MME TYLE'
ASSIGNA W.
TEST: JB® hM[
SPECIAL NOTES'
UNITS/ACCT CODES
/r
i
REVISIONS
Zipl7
.. RK FIBER-FATBEAM-14945 SW SEQUOIA P
wwEcr W0915522 —
MIABEP: FAH OAE OIRCT!!O
WIYIII:Irt M.63LL v915 �109iL�11EiItlEbAt
an�mt Ihnrw.iassE
iACp6IkCi:-
1FRP
51351-W0915522
METRO E - DARK FIBER FATBEAM -14945 SW SEQUOIA PKWY -TIGARD OR
Ziply Fiber Contacts Ha,e 4"I,ta,aal W..1.PMae Dan FI Wur.kem mS ruamma,.
Engineer. APP: mzz
RUSS WELLS a.:m/BymEE
503-312-7330 oda'-AH WMa MATERIALS
Inspector'. CIr[q[ID:4NUWIU1029//NWFV 2) NEI)STRAP
S kc Dark Flw.121 1) RAD MO
TROY ULLRICH cun°m..Em ue..:FATSEAM
503-765-4900 md.eu:]ABusw s.vuw Pk.9-vuHNrd,OB
Faciltties: &.bage:TGROM351
O co:111 3
ROBYN RUSSEL Cuslomeroeebed Due DBI.:LE3/H
503.260-9525 UPx:
SPLICINGIPLACING TraVf W'M'
REED I HORT 971-393-2950 206s 7
3TRCY fATREANC
JAMES STAATS 503-758-3119 c..de.:w ."m
r,q `ma"'F"''
o9ATB:H/A UNITS/ACCT CODES
UNUS
CpgerTmMrW:Be6le 1RW5
CPM:B!e}D DFl F IDA-SNp
HDXIN Nbe,C.u.;T6RDO.B .1B% 5PUCE F ER LI 2 .
PLACING FL CLL:C Du :TGRDORX xrou.9>-96 SlaUGE FIBER IA 1-2 1HAM AM2
PLACING f SI`EC ELLICODE 3:TGflooRRA �llCl TEST FlBER�2
PLACING MSPECTRE�2 all mOE 2: pEARRINEE EIDSIING Q09JRE NON—READY ACCE55ta1
SPIJDNG-6f rinn R.serve Flea.GIS:REoIumPM-
fCE0H,653651,NL118,95-%PartXS and PorlX6 $p11gEG 2422201
MPYWdk P.::51M,11 1552
.ditlT—<t:5511CG1-IEAVG9155E2 P1AL1:/REMGYE NU�1
aunt 5.'AemFlk'.F B1351i.cataB,%A6_Fil6_R1R
OSP Ptd%r<fp°M WM Fn Em Wh AHP:
swRlu"
FGROORNR-TA9F5 Sw YpuY Rwy pvRaM,oil
JMule FNer Il11B 1QD1B et 6]T SW Bp11FA R0.1t Pe NN eekkhih HUB agke[CED%,619d5C MAO lire NVB..—BED
IUMPEfl-Wr RED653,PERF 95
Place analM1e,REDIUMPFR FCSOA,RL i0 XM1B,9f.lpeY<L<rmNyITGPCORRA 5%95.
FC]OA.60HIDIR,96Ir°m tee[ust°mer mPnF brlIn II:PnIIPXG[pF 015-W Sand FC1039,6H i0 HE038,96bxAtOTGRDORYA
Far o1B-.REDJ
APwury:RFD I05 P 510 iGR00RB.k{0[015-0]-S rW FDF OI5-W-4
Feeder:FCM39.R}6H
rdnmPwd:Nzmn,BsBB
/.. C
REVISIONS
Aye i
r
E.'MYF C[NSIRUCDGC NOTES:
F MANY ROMMES AND CARIES ARE OMITTED FOR ALWAYS
ALWAYS UlEJ7E ALL PERSONAL
0 O PPE ica". APPROVED IGHTRAFFICN01 TACE HEA ALWAYS GET LO MSS BEFORE ANY AM
ALL DCDNG.ATTENTION MDI l W DMR BEAD POMER(LONG THS E LOCA WOPo(
AREA ANY DICIMGESA Dt CAL M S NEED L A PRE—AP L TIT BY TILE LOCAL
ENDNEDI.[D10W ALL LOCAL AND AREAS SAFETY UEA G 70 ALL R3 LOC AND
SAFETY EOUP.DEAN W ANY MORK AREAS BEFORE LEANING l0 THE NEJR LOCATION.
ENr`ND IS REPAIRED.ENSUE THAT ALL NEQU1RED PEfetIln ARE
A SURE GRADE ANO H ZI
ply
K FIBER-FATBEAM-14945 SW SEQUOIA PIN
NdDkaS R W09150 caw
EOlma m 1muffi
mRxanR-[ ENA fl16S31RL15 FASN,i Ifl%
2Ebi@ NCFE:— FANBa� "4
YME. 1.158.1 tACdS1RCi:— NAC A'V
rNIaP_ PIK _ IN, _
JM
CAUTION ••
wrpw vawa.e,.. Here is the planning solution to provide Dark Fiber seyNce to MH cttslartler.
a,00.o.s.aa
APP: 2/2/22
Date:02/M/2D22
Order:ASR 3402823
-STOP and LOOK UP' Circuit ID:43/IXGS/341028//NWFC/
Service:Dark Fiber 12)
Customer End User:FATREAM
Address:149455W Sequoia Pkwy-Portland,OR
Exchange:TGRO/51351
0A/C0:041/%3
Customer Desired Due Date:2/23/22
ICON:
STACY STANDY
20 7587017
STACY@FATBEAM.COM
Carrier:Wholesail Networks
Project Manager Steve Jones
IDSATp:N/A
N
F Cooper Terminal:RBGTD 18625
� v Count:BHGTO DR%,1101-1200
z Fiber Terminal:TGRDORXA 59895
Fiber Count:TGRDORXA 4201$91-96
> CLU CODE 1:TGRDORXA UNITS/ACCT CODES
CUJCODE 2:
Beaverton Reserve Fiber/GIS:RED JUMPER-FC2039,653-654,H2018,9"6 Parti and Part86
i OSP Work Order:NO OSP WO Requ�
Varasset Tickel:5511661-12/WO915522
Trunk Schematic F-51351-5464X2018,95-96_FTT6 FRP
i OSP please respond with an ECO Date ASAP:
Solution:
TGRDORXA-14945 SW Sequoia Pkwy-Portland,OR
Locate Fiber HUS H2018 at 6777 SW BONITA RD.At the HH beside the HUB splice FC2039,649-654
Into the HUB.Place a RED JUMPER-FC2039,653,H2018,95
/ Place another RED JUMPER FC2039,654 TO H2038.96.LocaleTerniml TGROORXA59995.
FC2039,654,X2018,96 from the customer MPOE back to TGRDORXA FDF 015.W-5 and
(CO SIDE OF HUB. FO2O39.653-854) FC2O39,654 TO H2O18,96 back to TGROORXA FDF 015-07-6.
(PLACE RED STRAPS AT HUB TO H2O18,95-96) Summand RED JU MPFR to TGRDORXA FDF 015-07-5 and FDF 015-07-6.
TGRDORXA H2018 c Feeder:FC2039,653-654
FDH 24/144 I Distribution:H2018,95-96
IN:TGRDORXA FC2039 645+
X0.33-157+
TGRDORXA FC -648
RXA H2018,1-144
o
---
REVISIONS
__-------------------J —�
rza
77 SW BONITA RD TGRD MH 8/76
__________________ II SW BONITA RD_
IT _L___—___ —- _-----_
to II
I £
750 10.2006—J II ' g Z'` 'y
i RBN 144 1
TGROORXA H2O18.1-120+ �I i I -----------
X0,121-144 I 9 r— RK FIBER-FATEEAM-14945 SW SEQUOIA
PROJECT co NEA -
1NFeERm
: WO915522 MCOM fflm
VawkNhDMaI RA�LL aHLS INI�2N1PON l
r JRI4R1 NME- FA16NIIeI53W
SEE PRINT 2 .. io' I-
.aw_
SEE PRINT 1II -
I� I Here is the planning solution to provide Dark Fiber servaeto this curomer.
APP: 2/2/22
i Date:02/0812022
Order:ASR 3402823
Circuit ID:431UG513410281/NWFC/
750 10.2001f 1 Service:Dark Fiber(](
RBN 144 I OustimaxEnd User-FATBEAM
8,1-120+
TGRDORXA H201Address:14N5SW SenPI Pkwy-Portland,OR
X0,121-144 Euhange:TGRD/51351
T(xt0 MH 1/289 OA/Co:041/963
II I Customer Desired Due Date:2/23/22
LCON:
STACY STANOY
2087587017
STACY@FATBEAM.COM
Cartier:Wholesail Networks
1 Project Manager Stevelnnes
DSATM N/A
m
F 1 £ Cooper Terminal::BeG18625
798 10.200111-1 to Count:BBI DBX,1101-1200
i REIN144 I I m FIM Terminal:TGRDORXA 5%95
o TGRDORXA 112018,1-114+ r Fiber Count TGRDORXA112018I
D X0,115-144 II 4 CLLICODEI.TGRDORXA
r5` II I CW CODE 2:
� UN/TS/ACCT CODES
< Beaverton Reserve Fiber/GIS:RED JUMPER-FC2039,653-654,H2O18,95-96 Poi-I and Pon"
OSP Work Order:NO OSP WO Required
Varauet Ticket 5511661-12/W0915522
Trunk Schema0c F-51351-Sa60-112018,95-%FTTCS_FTTP
OSP please respond with an ECD Dame ASAP:
s Solution
(FC2039,653-654 TO 42018,95-96) I TGRDORXA-14945 SW Sequoia Pkwy-Finland.OR
650 1(1.2008 I LJOt!Fiber HUB H2018 at 6777 SW BONITA RD.At the HH beside the HUB splice FC2039.649-654
REIN 12 I IInto the HUB.Place a RED JUMPER-FC2039,653,H2018,95
ce
TGROORXA H2018,91-96+ Plaanother RED JUMPER FC2039,654 TOX2018,96.Unica eTeredirWTGRDORXA 59895.
XD,7-24 FC2039,654,112018,96 from the customer MPOE back to TGRDORXA FDF 015-07-5 and
FC2039,654 TO X2018,96 back to TGRDORXA FDF 015-07.6.
Summary:RED 1 UMP ER to TGRDORXA FOE CIS-07-5 and FDF 015-07.6.
i Feeder:F12039,653-11
i �I II I Distribution:X2018,95-96
r
i� F II II FIELDER NOTES:
0 I Field Notes uploaded into Yarasset under REVISIONS
TEST FU3M II II 1 W0915522. In the MPOE,we have our 2 Fiber
Terminals,the TIES and the H2018 count.The
customer wants these 2 fibers extended into their
QO�`s� II II cabinet room,with assured vendoes.This is approx.
1.yV I 75-100'.They do have a 2"conduit,with mule tape
Q- we can use for the extension.From where It enters
VQ�O II II the cabinet room,they have cable trays going to
each able,and FATBEAMS cabinet is about 30'from
14 egUola wy II II I where the conduit ends.
z)raly
I '
SW CARDINAL LN RK FIBER-FATBEAM-14945 SW SEQUOIA P
SW CARDINAL LN
1 _—_____—_______________ FRaEc*F_ NMR W091557! aaARA: —
MOM mpurwflf
F� i MaND" BfR Mh¢JlN9ly aC31551E sUR)EW@".EI
TGRD MH 2/290 �\ 7 $fAF. 1�1m taco4mCr:— du rpnvvarparmt
aeli— IRKs