Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit Support Document
FOR OFFICE USE ONLY—SITE ADDRESS: This form is recognized by most building departments in the Tri-County area for transmitting information. Please complete this form when submitting information for plan review responses and revisions. This form and the information it provides helps the review process and response to your project. City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT ill Transmittal Letter i !GAR!) 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov TO: Allyson Armstrong DATE RECEIVED: DEPT: BUILDING DIVISION RECEIVED FROM: Meghan Ticknor MAR 16 2022 COMPANY: David Weekley Homes 'JITY OF TIGARL PHONE: 503.213.4409 Zl-III DINIa DIVISION BY EMAIL: mticknor@dwhomes.com RE: 10824 SW Lady Marion Drive MST2021-00537 (Site Address) (Permit Number) Trillium Hill Lot 7 • (Project name or subdivision name and lot number) ATTACHED ARE THE FOLLOWING ITEMS: Copies: Description: Copies: Description: Additional set(s)of plans. 3 /Each Revisions: Site Plan&revised plan sheets-PLN-1/FS-1&ELV-2 Cross section(s)and details. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other.(explain): REMARKS: We are adding a man door and concrete pad to this permit. Please see the attached revised site plan and revised plan sheets to reflect the change PLN-1, FS-1 &ELV-2. FO OF ICE USE ONLY Routed to Permit Technici : Date: C 7iZ Initials: Fees Due: ❑ Yes No Fee Desc pt. n: Amount Ire //(27--- -''''''''' - Special Instructions: ,�� Reprint Permit (per PE): [' Yes No ❑ Done Applicant Notified: ? Date: '-f , /2.2 Initials: ��' City of Tigard _ COMMUNITY DEVELOPMENT DEPARTMENT 1 c� -lz l� Building Permit Review — Residential Building Permit #: '15V-02l-00537 Site Address: 1 e 6 24 c(A) V,4, Aclnbvl jr Pro ect Name: 1 1 (t i outs }{i 5 Lot #: "7. Planning Review ��((_� _� BEY•l - ACC bone e it«Zit PAD Proposal: vtTok4'L4.. d A)e 149 t�I Verify address/suite#active in Accela. II In River Terrace: 4 No 0 Yes,River Terrace Review Addendum Site Plan Elements: jaErosion Control iiO3 copies of site plan on 8-1/2"x 11"or 11 x 17"paper Jtetained trees with drip line and tree protection measures Drawn to scale(standard architect or engineer scale) jiacootprint of new structure(including decks) and FFE ®North arrow ®Utility locations&easements(required for new and additions) Wite address,project or subdivision name and lot number widewalk/driveway approach applicant information(name and phone number) ry <3tie f-weHa7rsepric systems Lot dimensions and building setback dimensions Street tree size,type and location Of,gtrate-feetage th 'la gs+ ti am8 e++ Atreet names .reef...-- .1,.nti.,...,(s'I'..,,rrtermaif...v.,. ,hd„4' ifferetl 1 1)' d >1,000 sf of impervious area created or replaced? kilYes No If yes,is a storm water quality facility shown? ❑Yes fNo Required: ❑ Yes,applicant was notified ❑ No Received: 0 Yes ❑ No ❑ ':i a er:�ieEer 1 t T .�x t t eet Additie:rs,iFertrotieiTatnn Required: 0 Yes,applicant was notified 0 No Received: 0 Yes ❑ No © SAC Es cn,peen ff..r ADI}ap1li.d fer: 0 -Yes 0 I"cs Received: ❑ Yes 0 No t mvement(PFTI P Required: 0 Yes,applicant was notified 0 No Applied For: 0 Yes 0 No,stop intake Land Use Case #: ‘v 5'ZO (8 ©OOq 3 0 Zoning: pit Required Setbacks: Front: SO t Rear. 15 Side: 5 t Street Side: /0 t Garage: ZO t f J Building Height: Max. Height: 'SC t Actual Height: 16. 5 t ❑ 1 ....,tb a Arettl-------44 Entrance Set back no more than 8'from street-facing wall Parallel to street or offset 45 degrees or less Windows Minimum 12%of area of all street-facing facades Garage Garage door is behind widest street-facing wall Yes 0 et: ❑ Door extends no more than 5'from wall and there is a overed porch extending beyond garage. ❑ Door extends no more than 5'from wall and there is a 12 sq ft.window above garage on 2nd floor. 7.9 Garage door width is 0 12'or less jg 50%or less of facade 0 60%or less and includes 7 of following: 11 ❑ Covered porch 0 Recessed entrance 0 Wall offset 0 1'Roof eave 0 Roof offset ❑ Fire shingles 0 Lap Siding 0 Roof pitch 0 [Table,hip,or gambrel roof 0 Dormer ❑ Accent siding 0 Window trim 0 Window recess 0 Window projection 0 Balcony 0 Visual Clearance ❑ Urban Forestry Plan 0 Sensitive Lands: ❑ Yes p1 No Type: ® Conditions met prior to issuance of building permit Notes: Approved By Planning: �c� i Date: 'Revisions (after Building Submittal only) f6.. 'ewer _ Date Revision 1: Approved 0 Not Approved )I 3/Zu'Lz Revision 2: nil Approved 0 Not Approved I:\Buildine\Forms\BldePennitRvw RES I 2241 9 dncx Building Permit Submittal Original Submittal Date: 11/0 2/2-0 2/ Site Plans: # 3 Building Plans: # 3 Building Permit#: 2—Enter building permit#above. Workflow Routing. T.-Planning [ Engineering I Permit Coordinator [ Building Workflow Sign-off: Tr--Sign-off for Planning(include notes from planning review) Route Application Documents: K.-Engineering: (1) copy of permit application,jl) site plan, (1) building plan and original plan,review routing form. LBuildirig. originalpernut application,site plans, building plans, engineer and beam calculations and st details,if applicable,etc. Notes: By Permit Technician: Date: /2�09/1d2/ Engineering Review 2'Slope at building pad: /137; Conditions "Met"prior to issuance of building pertivt ('`Easements (encroachments)per engineering conditions of approval and plat facer Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes 2No Asess Water Quantity Fee in-lieu: 0 Yes [ 14o _ ��LIDA Facility on lot: 0 Yes 21 No I:e l�tnal Plat Recorded: 0 NOT Approved by Engineering: Date: Notes: Cd Approved by Engineering: t4-, (5 M( '(L Date: /?•/3- re,24 Revisions (after Bujding Submittal only) Reviewer Date Revision 1: Approved 0 Not Approved —.3 1-2o'Z Z- Revision 2: 0 Approved 0 Not Approved Permit Coordinator Review Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: 3 I3 112QZZ Revision Notice 2: Date Sent to Applicant: SDC Exemption: 0 Received Does not apply ff d SDC Fees Entered: Wash Co Trans Dev Tax: / Yes 0 N/A Tigard Trans SDC: Yes 0 N/A Parks SDC: /////Yes 0 N/A LIDA ❑ Yes / N/A 71 OK to Issue Permit Approved by Permit Coordinator: krAle Date: I 2.11'f(.iuu