Loading...
Plans •/`f "POLYGON AT ROSHAK RIDGE" f 6/f ' a•r „ it, LOT 222 HUB AND TACK CERTIFICATION %vza2/ -c1933S NE 1/4 SEC. 7, T 2 S, R 1 W, W.M. CITY OF TIGARD, WASHINGTON COUNTY, OREGON SURVEYED FEBRUARY 7, 2022 I I PREPAREI? FOR: TAYLOR MORRISON, INC. 703 BROADWAY ST., SUITE 710 VANCOUVER, WA. 98660 1 / / LOT 221 I / 0 I o 1 a w I N89`54'0O"W 87.43' i \ .-12 gp D ' --j-28,05'-----. \ L=7.07 ZS I \ L=10.37 d ¢ L=40.00 I 1y8s¢ eNi e - \ L 1 1 I w LOT �- I 222 I L=23.29 rr i I I I Ii I I o I o 128.52'-.-_ 4 --'--77.is.� h 11 N89'54'00"W 92.25' t 8.00' PUBLIC a c I UTILITY EASEMENT I 0 O +o w REGISTERED Y N1 v PROFESSIONAL LOT 6.00' PUBLIC LAND SURVEYOR 223 UTILITY EASEMENT I 25.00' 0 I a OREGON I I d JULY'9,2002 I } TRAVIS C.JANSEN 1 57751 I i II Qi RENEWS:6/30/2023 I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT I 20 0 1020 HAVE ACCURATELY SURVEYED AND STAKED THE OFFSETS TO THE FOUNDATION ENVELOPE FOR LOT 222 OF THE PLAT OF 1 INCH = 20 FEET "POLYGON AT ROSHAK RIDGE". j s f DRAWN BY: AY DATE:02/09/22 REVIEWED BY: T2 DATE:02/09/22 PACIFIC COMMUNITY DESIGN z 395-010 PLANNING - ENGINEERING - SURVEYING PROJECT NO.: (503) 941-9484 3DESIGN= FIELD REPORT Page 1 of 1 GDI Project: Polygon-113-05 Prepared By: Jessica Pence Project Name: Roshak Ridge 03/09/2022 Location: SW Bull Mountain Road and SW Roy Report#: 216 Rogers Road, Tigard Arrival: 1230 Departure: 1315 Weather: Sun, 50s Permit#: TBA Site Visit Requested By: Kaleb (Taylor Morrison) Met With (on site): Kaleb (cell phone) Purpose: Observe subgrade for lots 221 and 222 and 223 and 209 Outstanding Issues: FR 215 (2/28/22) Lot 221 soft spats;-loose rode eosin g-lecatiet9 slel cs-e�t,.rk *RESOLVED* 2 exposcu ; ;,;y; *RESOLVED* %" diameter steel foundation probe was used to assess subgrade conditions. Subgrade generally consisted of brown silt and clay or decomposed basalt. Probe resistance indicated generally medium stiff to stiff subgrade conditions. Loose crushed rock was observed over the surface of lot subgrade. We recommend tightening the crushed rock surface. OUTSTANDING ISSUES Lot 221 I observed crews had excavated the entirety of the lot and had loosely placed approx. 6" crushed rock over subgrade. Subgrade observed, including areas that were previously observed as soft, was generally medium- stiff to stiff. I was informed the footing near the slop had been deepened by approx. 2-ft, and survaey indicated the footing met the recommended minimum 5-ft horizontal set back. Lot 222 I observed crews had excavated the lot to approx. planned grade (see site plan). I observed loose crushed rock over the subgrade. We recommend tightening the crushed rock surface. Conclusion Based on our observations, it is our opinion the subgrade for lots 221 , 222, 223, and 209 as observed today, as indicated on the attached site plan, has been prepared in general accordance with our geotechnical recommendations. Distribution: Attachments: Site Plan (1) Reviewed by: This repon presents opinions formed as a result of our observation of activities relating to geotechnical engineming or envrunntenml set cot es. We rely on the contractor w comply with the plans and specifications throughout the duration of the project irrespective of the presence of our representative. Our work does nut include iupeivistua ul du et null of the t nnuacmr,the contiacrur's employees or agents. Our firm is not responsible for site safety. This held repot tis a DRAFT representation of our field observations,testing,anJ ptelmlinaty IRuns l lentlanons, rile I epuu can only be considered final upon review of the CeoDeslgn project manager,as Indicated by murals in the"Reviewed By'section. Signature: JP 9450 SW Commerce Circle,Suite 300 I Wilsonville,OR 97070 I S03.968,8787 I wvw.geodesigninc.coln