Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT i i Permit#: MEC2022-00203 COMMUNITY DEVELOPMENT IF G A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 3/31/2022 Parcel: 2S102AA04100 Jurisdiction: Site address: 12230 SW MAIN ST 100 Project: Paddle Palace/Wags Pet Resort Subdivision: None Lot: None Project Description: Replace 10T split system. Contractor: ANCTIL HEATING&COOLING Owner: HOBO PROPERTIES LLC 2150 N LEWIS AVENUE PO BOX 8087 PORTLAND, OR 97227 PORTLAND, OR 97280 PHONE: 503-281-0752 PHONE: FAX: 503-282-5722 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 03/30/2022 $436.61 Class of Work: ALT Type of Const: VB Plan Review 03/30/2022 $109.15 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 03/30/2022 $52.39 Stories: 1 Info Process/Archiving-Sm$0.50(up to 03/30/2022 $12.50 11x17) Project Valuation: $13,500.00 Fuel Air Handlers Fuel Types: Electricity Units< 10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: Vent Systems: Total $610.65 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. T s rules are set f in OAR 952-0 -0010 through OAR 952-001-0090. You matey obtain a copy of the rules Issued By: ‘./' P ittee Signature: (�� !�i Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Application nFOR OFFICE USE ONLY 7 n City of Tigard E EIVE� DR By`d03�/6�2azz -��� Permit No.: M f7j) (0603 III13125 SW Hall Blvd.,Tigard,OR 9722• 3 Pert Rev _ Phone: 503.718.2439 Fax: 503.598.1960 q qq Date/By: �4� �� Other Permit: T I G A R O Inspection Line: 503.639.4175 MAR 8 LOLL Date Ready/By: lurk.: 0 See Page 2 for Internet: www.tigard-or.gov 1/4. Y OF TIGARU Notihed / 4./Mcthod: 7 2 itSupplemental Information O UIR NftStOfd %� —.`7 /. `RC TYPE OF W COMMERCIAL FEE* SCHEDULE USE CHECKLIST ❑New construction }}ma�yy Addition/alteration/replacement Mechanical permit fees*are based on the value of the work y3performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition 0 Other: mechanical materials,equipment,labor,overhead,and profit. CATEGORY OF CONSTRUCTION Value:$ 1�1500404 RESIDENTIAL EQUIPMENT/SYSTEMS FEES* ❑ 1-and 2-family dwelling rog.Commercial/industrial 0 Accessory building For special information use checklist ❑Multi-family 0 Master builder ❑Other: Description Qty. Ea. Total JOB SITE INFORMATION AND LOCATION Heating/cooling: yt� Air conditioning 46.75 Job site address: 122� V S W Ma11 \ St. Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: TI GJarc 02 "I i 2_l'7� Furnace 100,000+BTU(ducts/vents) 54.91 'J Heat pump 61.06 SuitePoldgJapt.no.: I Project name: q" Ductwork 23.32 Cross street/directions to job site: // D o /t f� Hydronic hot water system 23.32 1 !�C( t Z �sfGlCli( L O y d r6,--1� ��� Residential boiler(radiator or G hydronic) 23.32 Unit heaters(fuel-type,not electric), in-fall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: I Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK ' Gas fireplace/insert 33.39 '^ t' r, Flue vent for water heater or gas PU 1 putt like-For I I (V tO() Sp\1t fireplace 23.32 s, Si-e YY\ Log lighter(gas) 23.32 , Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 PROPERTY OWNER I 0 TENANT Other: 23.32 y,.,1.1^ Environmental exhaust and ventilation: Name: tb Prt)pe l L\1 e S Range hood/other kitchen �y equipment 33.39 Address' PJOX $11 Clothes dryer exhaust 33.39 City/State/ZIP: Nor-land 0 - (1-1280 Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:(503 )16 —3302 Fax:( ) Attic/crawlspace fans 23.32 CX APPLICANT tA CONTACT PERSON Other: 23.32 Business name:Anent T ea-tin� Coo 11 n� Fuel piping: $14.15 for first four;$4.03 for each additional Contact name: v ar ouh Fern, O Furnace,etc. Address:2150 N . LeW I s ive Gas heat pump City/State/ZIP: pOrt- A OP— t112-i Water heater /unit heater rrn� Water heater Phone:(SO3) Ell——O�"JL_ Fax: :( ) Fireplace �y y� y r t� Range E-mail: m ar Iah @ a chi l W QL W'- m Barbecue CONTRACTOR Clothes dryer(gas) Business name: \ 1 'eQ" no ti cboki>nf� Other: ��1,((, .�y�y W "J MECHANICAL PERMIT FEES* Address:2I t V L t 5 r Alt. Subtotal port 0� 112.21 q�,�o•�1 City/State/ZIP: Minimum permit fee($90.00) Phone:( 11) p 1 .\a Grp Fax: Plan review(25%of permit fee) 7 LO 1 .V I"J—. ( ) State surcharge(12%of permit fee) CCB lic.: $ On TOTAL PERMIT FEE This permit application expires if a permit Is not obtained within 180 days after it has been accepted as complete. Authorized signature:. ------- • Fee methodology set by Tri-County Building Industry Service Board Print name:(kAar10ur\ Fe,rre y0 Date: ZIZy(ZZ 1:1Buildina\Permits lMEG PemritApp 040113.doc 440-4617T(11/02/coM/WBn) City of Tigard IIICOMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: HEC2 22- O2O3 Site Address: 124-3d Sw /(1(410 R Suite/Bldg#: Project Name: hull & Eotj&i �- � QS p -i2e i+ (Name of commercial business occupying the space If vacant,enter Spec Spacc.) Planning Revi ew rw !' / Proposal: P V 1 put! I i, �'" �I i 0-- join s ill .jf/Ct vi Existing Business Activity: Pettleart a((Lb..,/ s l Qd' 04- Proposed Business Activity: _ if Verify site address/suite#exists and active in permit system. River Terrace Neighborhood: ❑ Yes J No 0 Zoning. PIA) G 6 7 a—Permitted Use: .0 Yes ❑ No ❑ Spec Space i Confirm no land use required. iNs Business License: Exists: *1 Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: 46"1Date: 3/1 61/z 2.-C Revisions (after Building Submittal only) Reviewer G DateG Revision 1: ❑ Approved El Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal Original Submittal Date: /Y3 a8 ZA22. Site Plans: # /2. Building Plans: # 2- Building Permit#: al.-"Enter building permit# above. Workflow Routing: R—Planning ❑ Permit Coordinator Z.—Building Workflow Sign-off: [Sign-off for Planning(include notes from planning review) Route Application Documents: Building: original permit application,site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: 14f1---- Date: 03//62022— I:\Building\Forms\BldgPermitRvw_COM NoLandUse_111819.docx Permit Co ordinator Review ❑ Conditions -t"prior to issuance of building permit ❑ Approved,NOT Re • -ed: Date: Notes: x , Revisions (after Building Submittal only) Revision Notice 1: Date Sent t. Applicant: Revision Notice 2: Date S- to Applicant: ^ • Revision Notice 3: - Date .-nt to Applicant: El SDC Fees Entered.: ash Co Trans Dev Tax;,_., [] .Yes ■ A Tigard Trans SDC: 0 Yes ❑ N/A Parks SDC: ❑ Yes El N/A ❑ OK to Issue Pe mit Approved by Permit Coordinator: Date: I:\Building\Forms\BIdgPermitRvw_COM_NoLandUse_11 1819.docx