Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT s o COMMUNITY DEVELOPMENT Permit#: MEC2022-00205 Date Issued: 4/4/2022 1-1 C,A R D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 parcel: 1 S126CC00200 Jurisdiction: Tigard Site address: 10065 SW CASCADE AVE Project: Tesla Subdivision: None Lot: None Project Description: Replace RTU,install 4 exhaust fans,&install 1 split system. Contractor: VIKING HEATING &SHEETMETAL LLC Owner: 10065 SWC LLC 15779 SE JANSIK CT BY ALSTON & BIRD LLP DAMASCUS, OR 97089 BANK OF AMERICA PLAZA 101 SOUTH TRYON ST STE 4000 CHARLOTTE, NC 28280 PHONE: 503-679-8096 PHONE: FAX: FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 03/31/2022 $1,109.71 Class of Work: ALT Type of Const: VB Plan Review 03/31/2022 $277.43 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 03/31/2022 $133.17 Stories: Info Process/Archiving -Lg$2.00(over 03/31/2022 $8.00 Project Valuation: $40,000.00 11x17) Info Process/Archiving-Sm$0.50(up to 03/31/2022 $27.50 11x17) Fuel Air Handlers Fuel Types: Electricity Units< 10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: 5 Vent Systems: Total $1,555.81 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set fort• in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: � Permittee Signature: ,/Sc ,r Call 503.639.4175 by 7:00 a.m.for the next available in pection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT C 111114 TIGARB Building Permit Review — Commercial - No Land Use :tee Building Permit #: MECZO2 ,— 00ZOS Site Address: ) bej(/5- sw C/1sCAOX iwt Suite/Bldg#: Project Name: -r-suotk (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: _ g.- D(2 UNIT— P- c;tincL +PNI.i-- Pup2o22 -oeoo%) Existing Business Activity: Propose Business Activity: erify site address/suite# exists and active in permit system. ❑ River Terrace Neighborhood: ❑ Yes Lr] No rmitted Use: s ❑ No El Spec Space Confirm no land use required. ET Business License: Exists: ❑ Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: Date: 3 it( 2� Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved 0 Not Approved .. _- ._- - Building Permit Submittal Original Submittal Date: 31 1 b 122- Site Plans: # 0 Building Plans: # oZ Building Permit#: SI Enter building permit#above. Workflow Routing: 1 Planning r a Building Workflow Sign-off: 14 Sign-off for Planning(include notes from planning review) Route Application Documents: a Building original permit application,site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: t $ (f Date: SI((012? I:\Building\Porms\BldgPenn itRvw_COM_NoLandUse_111819.docx Permit Coordinator Review ❑ Conditions "Met or to issuance of building permit ❑ Approved,NOT Releas- :• Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Ap cant: Revision Notice 2: Date Sent to ' .plicant: Revision Notice 3: Date Sent t. Applicant: ❑ SDC Fees Entered: Wash C. Trans Dev Tax: ❑ Yes SI N/A Trans SDC: ❑ Yes ❑ P . s SDC: ❑ Yes 0 N/A ❑ OK to Issue Permit Approved by Permit ►oordinator: Date: I:1Building\Forms\BldgPermitRvw COM NoLandUse_I11819.docx