Permit CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT
; I COMMUNITY DEVELOPMENT Permit#: FPS2022-00050
Date Issued: 3/31/2022
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S101 BD00200
Jurisdiction: Tigard
Site address: 8005 SW HUNZIKER RD
Project: Biamp Systems Subdivision: None Lot: None
Project Description: Install 18 fire sprinklers
Contractor: AFP SYSTEMS INC Owner: TIGARD DISTRIBUTION CENTER LLC
19435 SW 129TH AVE 4800 SW MACADAM, STE 120
TUALATIN, OR 97062 PORTLAND, OR 97239
PHONE: 503-692-9284 PHONE:
FAX: 503-692-1186
FEES
Description Date Amount
Specifics: Permit Fee-COM 03/30/2022 $123.72
12%State Surcharge-Building 03/30/2022 $14.85
Type of Use: COM Plan Review-Fire Life Safety-COM 03/30/2022 $49.49
Class of Work: ALT Type of Const: VB Info Process/Archiving-Sm$0.50(up to 03/30/2022 $6.00
Occupancy Grp: B Height: ft 11x17)
Stories:
Commercial Sprinkler System:
Sprinkler Required: Yes Sprinkler Type: Wet
Standpipe Required: No Hazard: LT
Density: 0.1 Design Area: 1500
K Factor: 05.6
Commercial Fire Alarm System:
Fire Alarm Required: Alarm Type:
Pull Station Required: Smoke Detectors Req:
Battery Calcs Provided: Cut Sheets Required:
Total $194.06
Valuations: Required Items and Reports(Conditions)
Sprinkler Valuation: $4,500.00
Residential Square Footage: 0
Fire Alarm Valuation: $0.00
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon I
Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules
Issued By: Permittee Signature:
dal - AR26<<4-77e i
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.