Permit 1114 CITY OF TIGARD BUILDING PERMIT
s_ . COMMUNITY DEVELOPMENT Permit#: BUP2022-00080
Date Issued: 4/7/2022
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S103DD00850
Jurisdiction: Tigard
Site address: 13815 SW PACIFIC HWY 50
Project: Avalon Massage Spa Subdivision: None Lot: None
Project Description: Remodel existing 2066 sqft 1st floor tenant space w/no structural modifications
Contractor: BARRON BUILDERS Owner: D W SIVERS CO
4183 NE 11TH WAY 4730 S MACADAM AVE#101
GRESHAM, OR 97030 PORTLAND, OR 97239
PHONE: 971-293-7147 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 04/07/2022 $301.85
Occupancy Grp: B Occupancy Load: 14 Demolition
12%State Surcharge-Building 04/07/2022 $36.22
Dwelling Units: 0 Plan Review 04/02/2022 $196.20
Stories: 0 Height: 0 ft Plan Review-Fire Life Safety 04/07/2022 $120.74
Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 04/07/2022 $6.00
Value: $15,000 11x17)
DC Provision Review,COM TI-Ping 04/07/2022 $110.00
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $771.01
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 9 - 01-0090. You ay obtain a c y of the rules or direct questions to OUNC by calling 503.232 , r 1.800.332.23
` �..
Issued By: "`�_ Permittee Signature: /
Call 503.639.4175 by 7:00 a.m.for the next available inspe ion date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
r
,
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
114 'I Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
I I''.\R II 13125 SW Hall Blvd. •Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE(ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations axe disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done, /� ��,
excluding painting and wallpapering. [1] $ 1
MULTIPLIER(25%bather removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 3?5D
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order.
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
(d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line [2] of Valuation Computation): $
iDt COM)\t 4 11 t -
I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
1,111 _ " Plan Submittal Requirements
Commercial & Multi-Family - New, Additions or Alterations
T 1 GARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. ❑ map&tax lot# ❑ project name ❑ site address 0 suite number
❑ zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the"Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
1:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
IIIs4 Plan Submittal Requirements Matrix
Commercial & Multi-Family - New, Additions or Alterations
T c]n R a 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
Type of Submittal # of Plans
(Includes new, additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan is required showing location and square footage
of all buildings to be demolished,erosion control plan and
tree protection,if applicable)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanica
l 2
Plumbing(building fixtures) 2
Electrical 2
Solar Photovoltaic 2
(Requires check list for prescriptive installation. If not
prescriptive installation,engineering is required.)
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval,the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County,and Tualatin Valley Fire&Rescue),if applicable.
I:\Building\Pemrits\BUP_COM_PennitApp.doc Rev.03/05/2019
City of Tigard
114 C * COMMUNITY DEVELOPMENT DEPARTMENT
T[GARD Building Permit Review — Commercial - No Land Use
Building Permit #: l ,{P2o22-606 g0
Site Address: 13$[ S7.0 f4fP1 < divy Suite/Bldg#: ��
ews
Project Name: {- :_____ �rr i- e-�� U«`i
(Name of commercial u,mess occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal:
Existing Business Activity: PEaoNA L ceetAa.S
Proposed Business Activity: Pegs tAlAL S trzv ic9 S
Verify site address/suite#exists and active in permit system.
0 River Terrace Neighborhood: 0 Yes ] No
^�ing c_-
IQ tted Use: a. Yes ❑ No ❑ Spec Space
All Confirm no land use required.
Business License: �/N Exists: ❑ Yes ,❑ o,applicant was provided a business license application
Notes:
Approved by Planning: Date: 3/2812Z
Revisions (after Building Submittal only) Reviewer Date
Revision 1: D Approved ❑ Not Approved
Revision 2: ❑ Approved 0 Not Approved
Revision 3: 0 Approved 0 Not Approved
Building Permit Submittal
Original Submittal Date: 27_,�4/�7Z
Site Plans: #
Building Plans: # 5
Building Permit#: {❑tinter building permit#above.
Workflow Routing: gi-I5lanning 0 Permit Coordinator 114-15uilding
Workflow Sign-off: Cg'Sign-off for Planning(include notes from planning review)
Route Application Documents: liti-Suilding: original permit application,site plans,building plans, engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: Date: 4 4/'e22_
I:\Building\Forms1B ldgPermitRvw_COM_NoLandUse_11 1819.docx
Permit Coordinator Review
0 Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:.
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant
Revision Notice 3: Date Sent to Applicant:
❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes 0 N/A
Tigard Trans SDC: ❑ Yes ❑ N/A
Parks SDC: ❑ Yes 0 N/A
❑ OK to Issue Permit
Approved by Permit Coordinator: Date:
I:\Building\Forms\BIdgPerm itRvw_COM_NoLandUse_111819.docx