Permit Electrical Permit Application—City of Tigard
Page 2—Supplemental Information
Limited Energy Permit Fees: Renewable Energy Permit Fees:
RESIDENTIAL WORK ONLY: FEE SCHEDULE
Description I QIY. I Each I Total *
Fee for all residential systems combined: $75.00 Renewable electrical energy systems:
5 kva or less 100.70 2
Check Type of Work Involved:
5.01 to 15 kva 01 133.56 2
❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2
Wind generation systems in excess of 25 kva:
❑ Burglar Alarm 25.01 to 50 kva 301.04 2
I 50.01 to IOU kva 552.26 2
I Garage Door Opener* >100 kva(fee in accordance
552.26 2
with OAR 918-309-0040)
❑ Heating, Ventilation and Air Conditioning Solar generation systems in excess of25 kva:
System* Each additional kva over 25 7.42 3
n Vacuum Systems* >100 kva no additional charge 00 3
Each additional inspection over allowable in any of the above:
❑ Other: Each additional inspection is 66.25/hr
charged at an hourly(1 hr min)
Inspections for which no fee is 90 00'hr
specifically listed 1I:hr mint
COMMERCIAL WORK ONLY: ELECTRICAL PERMIT FEES
Subtotal(Enter on Page I):
Fee for each commercial system: $75.00 Number of inspections allowed per permit.
(SEE OAR 918-309-0000)
Check Type of Work Involved:
n Audio and Stereo Systems
n Boiler Controls
n Clock Systems
❑ Data Telecommunication Installation
— Fire Alarm Installation
n HVAC
❑ Instrumentation
n Intercom and Paging Systems
n Landscape Irrigation Control*
❑ Medical
n Nurse Calls
n Outdoor Landscape Lighting*
n Protective Signaling
❑ Other:
Total number of commercial systems:
*No licenses are required. Licenses are required for all
other installations
L';Buildinb\Permils',EL('_PermiiApp FIR EKE doe Rot 1iE/i7.2015