Loading...
Permit Electrical Permit Application—City of Tigard Page 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: RESIDENTIAL WORK ONLY: FEE SCHEDULE Description I QIY. I Each I Total * Fee for all residential systems combined: $75.00 Renewable electrical energy systems: 5 kva or less 100.70 2 Check Type of Work Involved: 5.01 to 15 kva 01 133.56 2 ❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2 Wind generation systems in excess of 25 kva: ❑ Burglar Alarm 25.01 to 50 kva 301.04 2 I 50.01 to IOU kva 552.26 2 I Garage Door Opener* >100 kva(fee in accordance 552.26 2 with OAR 918-309-0040) ❑ Heating, Ventilation and Air Conditioning Solar generation systems in excess of25 kva: System* Each additional kva over 25 7.42 3 n Vacuum Systems* >100 kva no additional charge 00 3 Each additional inspection over allowable in any of the above: ❑ Other: Each additional inspection is 66.25/hr charged at an hourly(1 hr min) Inspections for which no fee is 90 00'hr specifically listed 1I:hr mint COMMERCIAL WORK ONLY: ELECTRICAL PERMIT FEES Subtotal(Enter on Page I): Fee for each commercial system: $75.00 Number of inspections allowed per permit. (SEE OAR 918-309-0000) Check Type of Work Involved: n Audio and Stereo Systems n Boiler Controls n Clock Systems ❑ Data Telecommunication Installation — Fire Alarm Installation n HVAC ❑ Instrumentation n Intercom and Paging Systems n Landscape Irrigation Control* ❑ Medical n Nurse Calls n Outdoor Landscape Lighting* n Protective Signaling ❑ Other: Total number of commercial systems: *No licenses are required. Licenses are required for all other installations L';Buildinb\Permils',EL('_PermiiApp FIR EKE doe Rot 1iE/i7.2015