Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
EGE.ivED . , ELN.109' ^"Markup Legend i SENJU Model RC-RES Residential Flat Concealed Pendent SS8464 1-1/4"AQUAPEX TO SYSTEM — 0 - - - 1 1 K=4.9,162F°,7/16"Orifice,Maximum Spacing 16x16' CURRENT STATIC WATER PRESSURE FEB 2 2022 TO HOT WATER Delete Use RC-RES-16 Sprinkler head demand: 13 gpm @ 7.04 — HEATER C11) 6 P, [STATIC: 105psi F --- _ _ - 1 SENJUK. 4.9,Mio6d2eFl.,RC7;iR6E,S,Orifice,Residential ti ax iFmlautmCosnpcaecainlegdiP8e,xndnept S S8464 LATY OF TIGARD 1 1/4"AQUAPEX RISER gall C 1:1 E'1 8 Add Line — — — — — - 0 PRESSURE GAUGE MI 4 o.LP Add Tee I I 1 RC-RES-18 Sprinkler head demand: 17 gpm 0 12 lUILDING DIVISION 1 1/4"PRV CASH ACME (OR EQUIVALENT) "11111111 0i 2.4. ,4,q5 SENJU Model RC-RES175 Residential Flat Concealed Pendent SS8464 ADDITIONAL 5GPM AT TEE 6PSI LOSS FLOWING 26 GPMf Add Elbow L 0 - - - 1 K=4.9,205F°,7/16 ..ZIE "Orifice,Maximum Spacing 12x12' 1"WATER METER NFPA 13D STANDARD LOSS FOR SHARED SUPPLY FOR feifig'-2.?RC-RES-12-205 Sprinkler head demand: 13 gpm @ 7.04 6PSI LOSS FLOWING 36GPM OTHER UNITS 3/4"SUBMETER or 14PSI LOSS FLOWING 26GPM ........- J 80 psi +rw-' PRv set Pressure] ZEift.,'F23 Add Coupling I I 13 1st Host MOST HYDRAUUCALLY REMOTE HEADS CURB STOP ,I Add Head -@--0--0- 13 TOTAL HEAD# GPM PRESSURE REQ'D AT STREET STREET I SHUT OFF VALVE PSI LOSS ElfV.102. .,,...,..,... " I , 1 HEAD H.4 17 66.06 1 ..* 2 HEAD H.7&H.2 26.0262 91.97 _ 1 <. a 'i.: Delete Head CORPORATION , r====, 1111111 7 ill 3-0 .. M eHead '.4 Q _ STOP IPSI LOSS ...!.\..._ dik -N,... --,iii, 4111P -0 d-iiiEltigi ov - - - - MAIN G3 IFI 411) 50'OF..,-v.9, tt,.a;.E.,,t1 4: .lik-Rp-r- 1 1/2"AQUAPEX 50'OF ' Note:All rewslons must be reviewed by Uponor Et EV=.95 10'OF 25'OF 1 1/4"AQUAPEX p"R„1.58w.gi' r--.; Table F002.1 --Qt 'eqr:Ef.i'z (CI I"COPPER-K 1'COPPER-K Multipurpose Fire Safety Systems i4igtg42'4,111-2 The Uponor Residential Fire Safety System is a residential fire protections C '), WATER SERVICE DETAIL system installed I n combination with the cold side of the domestic potable water system. Only licensed contractors trained by Uponor can Install this system. F100) NTS .E-i• -•,,, , Rt,,.., trq What to do If Changes are Required I, a.,11."1"4 F.,,=Ep>.'*6 If any features or obstructions require the addition or deletion of sprinkler iw, ' 5,-,E heads,or significant relocation of sprinkler heads,contact the Uponor Design -I --- ---.-^ .P,-P'-' - I Ca i.j,?Iir'.,%H.4}414E . ._. Department to determine if observed changes require a redesign traZ=aaja EGRESS a s a p 6-0 SGD --" a—cco -ffazazszszzao 6-0 500 11111i131MMINIMICII=1:1:0319/ EGR1SS "'8',.-.:-.42C,,4-9,7.F.i -• ---tz •.ii't'A (888.594.7726). ...- ilicilliL59141 I AI DOOR SLIDE- DOOR SLIDE AEI; ;1 ., lay 'II '..T I II ,-- - ---, , ,- — --, 2.2y• ?-. VP,- \ 7- -..\ 7- -,, 1 5. r:, /- ) '. 7- , l3J , _'.;-'v 1: ifry '''7:''umCN:.... -11-71..-.._ "`/ 7------ ,- — --,.. 'It. o.t. 20 t COLOR/LINETYPE LEGEND \ ' - AM _../ . I Ark _, BLUE LINES=FEED TO FIXTURES(BATH,SHOWER,ETC.). / 1 W.I.0 i .1-' VP 1 AI 2'-'2- REEN LINES=INTERLEVEL CONNECTIONS/SUPPLY. 1 1 TYirnr Cr ‘,D_-) NF2..Eig.;:.6.:tFli ! E BLACK LINES..SPRINKLER HEAD TO SPRINKLER HEAD. 1 M. Bedroom\ INT i (M. Bedroom \ 5.. ..-.t,t9i _ . .% --4,...... m 1/2"PIPE SIZE \ , 1J1 rr.--i Lri,t 41,j, , .. ; . ---4,fii.il 7. ......-. .3/4"PIPE SIZE , 6--,, . i arta* 6 RC-RES-16 (221000A) RC-RES-16 3 11 " *S-RES--18. , 105PMEanll ?53 u RC-RES-16 RC-RE1-1:26'i (221000AR) INSULATE FLOOR 'WALL .'' 5 SH_AI b .......1 -!.. ® ..... -- 1-1/4"PIPE SIZE . i '-' , INSULATE FLOOR I - - ' Ili ;3 l' I - II -‘;- 'I OVER CRAWLSPACE OVER CRAWLSPACE \ E; :} I , 2g , 5 SHELVES ". I I 01 here by wceartsipfy,:phltetdhlbsyprnlaen,osieunticiflecat,mloyn, s\ 11 , , Aix 1 direct supervision and that I am NICET 5 SHELVES I .3- \• :j_l_11.,,-4--_- '-6h j''I S'-73/1-I \NIT '7A' \`.. _......, 7'1-1 2.2,V._..,./2., 2'-8' ' -SA. 3.15/4 ‘'s _.„/ T-1Y,' IV/ i 5 FY4" 3 HY '.•- -- ----j• ,.....- S--- Certified. I. SPRINKLER SYMBOL DEFINITION H.6 .. ,i I ,:---i Fre$ .6i-icw,.„11 I -1--- .. ... 'P. ,b,,o., - _:,,,,,, in t._, R .. /::1 K.6 S;E-R1 RC 16 ''' . :: "4 34\;" . "R ES-16 . - .. i L , . C-RES-16°! -i-.6,60 . ,'r;at 4° RC-RES-16 b 7 .9 xxx-xx ,,,, . z-r-'- .-3- , ^ ° • all 14....t. ' I I 1 t MAXIMUM SPACING(TYP) _, er..-•-• gISHOWER , aurrimen 111 .R-7,A---c.. aze Aii.iiiIlalf - % __/ wNTractEceBriacsaoLfin.szidsotnemN:ozLitaesy:0.3u0t98312:01 21:1 NM` Certification Expires.June 1,2022 SPRINKLER MODEL(TYP) ililifiLar""#.411111"111a6 , 7:1:1 1111 \ _,-/' -i/.- N, Ilall‘ Iry ....... ?.-C-RES-16 I(-J X " 1 . . I I RE,S-1k ';'' i ''r,i,:-: 16 . . RC-RES% ; --/ - 1 , .3 F.2 .1 1:4 14P ' Itchn ' iiii:' 111111 Kitchr '\ O I 4 ---, I 1,-T xsir „ ••••• 1,11d7Z; hi/rajw....Horch t ei _ Porch :''' 1 Bedroom 2 E I rz '8 et IE Bedroom 2 ' .T, I \ H 10 / N 9 ; X C 1. , \ H.10 „,r-','I 5 SHELVES .11111K.L Rjrin ril Eill lareill 5 SHELVES ' 31_ . 1 -H.• ,4 ,. RUMS-1i, 3 I '-MY' CA61416 ' •-• a 1r., B. h , ii ,o8,FoLD v ..,[ -tze,+1/2. CI- .":1;1 r..'l,- V2H•"Y'l .'" 1-- -11 4-"`'°" q , B.th'''P'mrfr------.' I : 1 2 12 -o 2-6 f-,_..J122 4111/ =1.............iiii.........wAs.,Re.R ,,,, 6 \ i ,741:7 • 1 -1 Lk- dr-- I..' D iiii-muriim --1/4°mAQUAPEX TO .. .1 g •- r.. - AQUAPEX TO 1, /-2- ‘,. r 4 1-1. ' , 418*ABOVE SLAB - H- i L., j gft iii SYSTEM [Pg.Ft111 418*ABOVE SLA en/Bdryi 3 D...n../Bdrm 3 Oa s ill I rDRYER WASHER "!:,2,------• - 2, A-- DRYER WASHER !, '1 I ; 72 . , BOLLARD---J-0 _j.,. riMAIN SHUTOFF 0-.--80U_ARD ;,, ,.1 .41 1 •C TUB& 5,1 ' ,j,;/ ilphi ----• 4", I o- r'. , T!6 5 1.13, ,: J3 I t ---- ea \Z.,..s.,.. .6 , '' --i S•1 MAIN SHUTOFF .C... 1 -, 0 V) 0 13 INSLIL j ----- ' I--2' .R ',-,I 1 Mr Fx. 1, -- S l!, 'a oRSUl I CaLVE LOCATION 1 .. ..killsr ---"1.......4ii_ 11- --.:.:.' , ,k. , ,, , . , , 1 VALVE LOCATION ' -. '''''''.'1.1"'7 ......r....."....i...6:Wi:ii....a.".. ..i..........',... .. LU 2 _;,)S,t0 SW lir I ,I.slifwii KPI\I ..,i,'" - al U U-I —I 4 ,. N UV ViL31 SIM SlIst *':1 1 tor. ., ' Stor. ' ; :1/s1 : ef 3 11,1'i'_ r711:11`'6'4';2-V,'; 5 3Yj," i LU 0 n ri E . 1 IH.12=4 3-1,:y2 :'4 1" .. ° Pt ATFORM AT-6 : r-PLATFORM AT ''''j ljj 0 R>zZEI,51,-;. i3 0- = CZ 0 = ADU 4 0, t, SFU , ,rifp ABOVE SLAP 418'ABOVE SLAB SFU kl ADU CL CD Izz U. < "••• C) < .0 • .. Garage 2E5 r 0 Garage II. ----1.3 r i, Garage 0 ' Garage = 1 Arli Nitta 1111111111 z1 r—i .- 0 MUM maw own fill '-'," k = 1:3 I Iv ll-wh-••• ouno, 1 IIIREk A , ______ N CM ,- M;gggg . 1 P 0 ,... ..... a) -0 0' , ,.. lerc,' '0 2x8 FRAMING i'lo 6€§f§ a z 0 %FP- `-' 2 _1 < 243 FRAMING rig - -ELEC ENTRANCE 04 , I ,\ "IS' 'i---„ I e kl 0 ELEC.ENTRANCE ' CD .0 0 . , ! - SPU ,L., I 1; ,-;3' .:_„ I SFU ,,,,, I . SHEET DESCRIPTION 0 0 L.1.1 0 C) ^ ' --— FIRST FLOOR W/MIRROR _ , '. 4C C) 1.1- CL GO -' OD 8 1 ) FIRST FLOOR ( 2') FIRST FLOOR - MIRROR r*, -:. F100 / ..__11)92 1/4" = 11-0" SHEET NUMBER 6. / 1/4" = 11-0" la 5 0 5 15 6,1 -5.--M-.E15......0 _ __J F100 fi 1/4"=V-0" © UPONOR - CONFIDENTIAL __,.....**. ...................__ ., Senju RC-RES:Open Web Truss/TJI Construction Insulation Recommendations ' AquaSAFErnt GENERAL NOTES: In areas subject to freezing,care should be taken in unheated attic spaces See General Notes 8.2.5.8 for Architectural ProPEX LF Brass Fire to cover Uponor AquaPEX tubing completely with insulation. Insulation Feature Requirements '^ Sprinkler Adapter Tee should follow thep 1. THIS SYSTEM IS DESIGNED AS PER NFPA 13D 2019 EDITION AS A RESIDENTIAL MULTIPURPOSE SYSTEM guidelines of the Insulation manufacturer. See Uponor ` z SECTION 3.3.12.3. Blocking Maybe Fire Sprinkler Adapter NT - - - -7= f p Y --` r Document"Uponor AquaSAFE Attic Insulation Guldlines"for attic Required.If ` Push-on Nut guidelines(Providedpackage or online q , installation in Contractors Documents 2. UPONOR COMPANY RESERVES THE EXCLUSIVE RIGHTS TO ALL DETAILS AND DRAWINGS AS SHOWN ON Blocking is Used, 1;'q"Min. at www.Uponorpro.com), � ' THIS SHEET. THESE DETAILS AND DRAWINGS ARE PROPRIETARY INFORMATION OF UPONOR COMPANY AND Use The 2 Top • 1 3'z"Max. > p UNAUTHORIZED USE MAY BE SUBJECT TO PROSECUTION TO THE FULL EXTENT OF THE LAW. Screw Holes. ti[j-I.F aottam of Mourtrrq Extreme Temperature InstallationsPlanter Box Window,Bay Window or Similar Feature. u'.. s 13racke[m Fece of muss gquaSAFE Resftlentlal Fire Satety systems are often installed in attla or If no additinal floor area is created No Additional Sprinkler is Required. Q P G 4 3. THE DESIGN OF THIS SYSTEM IS DICTATED BY SPECIFIC CEILING HEIGHTS AND ROOM SIZES. IT IS THE Fire Sprinkler Adapter other areas exposed to temperature extremes of heat and/or cold. Follow 8'-0"or less ,.�O RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO ENSURE THAT THE CONDITIONS SHOWN ON THESEill,,, CI PLANS ARE EXACTLY AS THEY EXIST IN THE FIELD. DEVIATIONS FROM THE DESIGN MAY CAUSE THE Mounting Bracket `__/ the recommended extreme weather installation instructions to Isolate and / )f it?,j m SYSTEM TO BE UNABLE TO CONTROL A FIRE.IF THE BUILDING CONSTRUCTION DIFFERS FROM THE FIRE / B - protect system components from extreme temperatures. Because this Rr.RES.16 I V 3 LL`z SPRINKLER PLAN,CONTACT THE SYSTEM DESIGNER IMMEDIATELY. system also delivers domestic cold water directly to plumbing fixtures, ® N Q 3-#SO x]1/2"--( � / 9'-0°or less 4' 1 m m n Full Course -{_.r �' Uponor highly recommends that you protect the tubing with adequate 4. THIS SYSTEM AND THE ACCOMPANYING HYDRAULIC CALCULATIONS ARE DESIGNED IN COMPLIANCE WITH Thread Strews '�_I i 1_J insulation in warm weather areas to minimize heating of the cold water o` Ls e P a NFPA 13D 2019 EDITION. supply. In Bottom Holes t7-. roe 5. "STAND-ALONE"OR"MULTIPURPOSE,WET PIPE"SYSTEMS ARE PERMITTED TO ONLY USE ANTI-FREEZE \ Installation methods include,but are not limited to: `�`o m ,.[ W LISTED FOR USE IN NEW SPRINKLER SYSTEMS, _ W o,w S Lead-Ere Flat--�R+ • Tenting over the fire sprinkler piping. O,n u[3 dy Additional layers of butt insulation. If additional floor area is created.Cannot exceed 18 Rz,be more than 2'-0" 6. MODIFICATIONS ARE PROHIBITED.SPRINKLERS THAT HAVE BEEN PAINTED,CAULKED,MODIFIED OR Concealed Senju r "' " y • Y DAMAGED MUST BE REPLACED. Sprinkler Head Concealed Flat • Increased depth of blown-in insulation, deep,more than 9'-0"wide and be with In the coverage area of the < s Cover Plate sprinkler.No Additional Sprinkler is Required. z W �` 7. A SINGLE CONTROL VALVE ARRANGED TO SHUT OFF BOTH THE DOMESTIC SYSTEM AND THE SPRINKLER Caution: If you will be Installing spray foam insulation,make sure to x F �+ E SYSTEM SHALL BE INSTALLED, Senju RC-RES:Traditional Wood Framing Construction protect all components during application.Consult with the spray foam a j = i^a,� manufacturer to ensure compatibility with all products before application, NFPA 13D Table 7.5.6.3 Distances From y 3 K ii 4 E Heat Sources adz;Fyg'r.LL 8. OWNERS MANUAL MUST BE PROVIDED TO THE OWNER. ,,22 Consultation with local building officials is encouraged to ensure compliance 5 z.W x F s 9, AT THE MAIN SHUT OFF VALVE,A TAG OR A SIGN STATING THE FOLLOWING IS REQUIRED;"WARNING:THE ProPEX LP Brass Fire with local building codes. --- ---- ------- - ^? ? i s WATER SYSTEM FOR THIS HOME SUPPLIES FIRE SPRINKLERS THAT REQUIRE CERTAIN FLOWS AND Fire Sprinkler Adapter Ordinary Intermediate Sprinkler Adapter Tee 111��� pHeat Source 'c° x�'z y PRESSURES TO FIGHT A FIRE.DEVICES THAT RESTRICT THE FLOW OR DECREASE THE PRESSURE OR / Push-on NutTemp. Temp. -3l c l AUTOMATICALLY SHUT OFF THE WATER TO THE FIRE SPRINKLER SYSTEM,SUCH AS WATER SOFTENERS, �. 135°-" 175°-725° ''+ m a rn FILTRATION SYSTEMS AND AUTOMATIC SHUT OFF VALVES,SHALL NOT BE ADDED TO THIS SYSTEM Bending PEX Tubing Side of Fireplace 36" 12" a: l°°iX l 0 i WITHOUT REVIEW OF THE FIRE SPRINKLER SYSTEM BY A FIRE PROTECTION SPECIALIST.DO NOT REMOVE r_)".;7-i 1 3/q'Min. The minimum bend radius of Uponor PEX tubing in any direction is six times y 3 g 4g r THIS SIGN". Front of Fireplace 60" 36" W er c or >_.,, p zz 3' 1 t/2 Max, the outside diameter(6 x OD). ¢Y a r o Fire Sprinkler Adapter- Bottom d Mounting pp 3/8",1/2", Uponor AquaPEX Wood Burning Stove 42" 12" =z d I�d G- P P Tl..____ Bend supports are available for 3/4"and 1"U Kitchen RangeC 10. ALL INTERIOR PIPING TO BE UPONOR"AquaPEX®"UNLESS NOTED. MountingBracket Bracket to rare of Truss UI ___ tubing to facilitate 90-degree rigid bends. 16" 9" a t S<p Cz i p m 15 vR g "'illWall Oven 18" 9" U>�u��.n FsTSf!ttip�r. 11. UPONOR"AquaPEX"TUBING TO BE SUPPORTED PER NFPA 13D AND MANUFACTURER'S RECOMMENDATIONS. 2-#10 x 1 1/2" ©J (� Recommended Tubing Length Between Fittings Hot Air Flues 18" 9" N y g a 2 C z m Full Course __r_ __,x >•.`e 12. MINIMUM SPACING BETWEEN SPRINKLERS IS 8'-0" REFER TO SPACING CHARTS FOR MAXIMUM SPACING Thread Strews �7 I .,.r �..r Fitting Size Minimum Tubing Length Uninsulated Heat Ducts 18" 9" C m x 00 '0`5-,c z^u. BETWEEN SPRINKLERS AND FROM WALLS.SPRINKLER HEAD MANUFACTURERS MAY HAVE MORE In Top Hiles {f 1L__U t..J 3/8"ProPEX Fitting 2" Uninsulated Hot Water Pipes 12" 6" cr . ;z F 10, °'RESTRICTIVE SPACING LIMITATIONS. Side of Hot Air Diffuser 24" 12" D "°r:;T^ °_Tn - \ 1/2"ProPEX Fitting 2" Front of Hot Air Diffuser 36" IB" 3 P rs > T a.�d 13.SPRINKLERS ARE NOT NECESSARILY CENTERED IN ROOMS DUE TO LIGHT FIX i URES OR OTHER CEILING --� MOUNTED OBSTRUCTIONS. 3/4"ProPEX Fitting 3" Hot Water Heater 6" 3" i=R 5 y i Lead-Free flat 2.���zR'ur y o }^ Concealed Senju rr' " 1"ProPEX Fitting 3 1/2" Furnace 6" 3" f,3 & E Z's 14. THE PLUMBING TIE IN CONNECTIONS ARE SCHEMATIC IN NATURE AND CAN BE INSTALLED OFF THE Concealed Flat s m '�['+ SPRINKLER LOOP ANYWHERE BETWEEN SPRINKLER TO SPRINKLER CONNECTION. Sprinkler Head Cover Plate 1 1/4"ProPEX Fitting 4 1/2" 50W-250W Light Fixture 6" 3" W ac o r z q?x A 250W-499W Light Fixture 12" 6" s�%S�"r '+ W 9 us3F,(7,2 .zz�15. THIS SUGGESTED LAYOUT IS BASED UPON INFORMATION PROVIDED BY OTHERS. CHANGES IN \ n5 ,a z < �p y Ti% CONSTRUCTION OR THE RESPONSIBILITY OFDTHE INSTALLER TO NOTIFY UPONOR TECNDITIONS MAY OCCUR WHICH MAY HNICAL CAL SERVICES UIRE OF SUCH TO THE LCHA CHAV. NGES.YOUT. IT IS Exposed Installation Requirements. l�( F�;y c$ „3_ c Uponor AquaPEXT"tubing(white)and ProPEXT"EP Fittings and ProPEXT" I 1 vai 16.NFPA 13D 8.2,5.OBSTRUCTIONS TO RESIDENTIAL SPRINKLERS Brass Fittings are approved for exposed installation where the following I • 8.2,5,7' SHADOW AREAS SHALL BE PERMITTED IN THE PROTECTION AREA OF A SPRINKLER AS LONG AS conditions are met.(UL 1821 Approved) THE CUMULATIVE DRY AREAS DO NOT EXCEED 15 Ff.PER SPRINKLER. rvS". • 8.2.5.8 SMALL AREAS CREATED BY ARCHITECTURAL FEATURES,SUCH AS PLANTER BOX WINDOWS,BAY Exposed Wood Joist Ceiling Assemblies. H _ M /fl Q�m I here by certify that this plan,specification, WINDOWS,AND SIMILAR FEATURES,SHALL BE EVALUATED AS FOLLOWS: ^[ c1, Joists are of dimensional lumber,engineered wood or wood I-joist. report was prepared by me or under my (1)WHERE NO ADDITIONAL m or FLOOR AREATIO CREATED BY THE ARCHITECTURAL FEATURE,NO 2. Joist are of depths from 6-I6 Inches(152-204 mm). ® direct supervision and that I NICET ADDITIONAL SPRINKLER PROTECTION IS REQUIRED. 3. Joist are of spacing from 12-24 inches(305-610 mm)on center. Certified. .o (2)WHERE ADDITIONAL FLOOR AREA IS CREATED BY AN ARCHITECTURAL FEATURE,NO ADDITIONAL 4, Joists can be exposed after installation, m SPRINKLER PROTECTION IS REQUIRED,PROVIDED ALL OF THE FOLLOWING CONDITIONS ARE MET; 5. Metal pipe hangers spaced at maximum 24 inches(610 mm)on center \ \ T�ysion an that am oNI a (a)THE FLOOR AREA SHALL NOT EXCEED 18 FT''(1.7 M) are used. 1.55" I, 1.6fi" 08/12/2021 (b)THE FLOOR AREA SHALL NOT BE GREATER THAN 24 INCHES IN DEPTH AT THE DEEPEST POINT OF 6. Listed residential automatic sprinklers of maximum activation �I / ,}' Tim W McDonald Date:THE ARCHITECTURAL FEATURE TO THE PLANE OF THE PRIMARY WALL WHERE MEASURED a ALONG THE FINISHED FLOOR. temperature rating of 155oF(68°C). I°-i" Hanger 1" Hanger NICET Certification No,150393 p (c)THE FLOOR SHALL NOT BE GREATER THAN 9FT IN LENGTH WHERE MEASURED ALONG THE Water-Based Systems Layout-Level III Tubing Support Spacing: Certification Expires:June 1,2022 PLANE OF THE PRIMARY WALL. - (d)MEASURED FROM THE DEEPEST POINT OF THE ARCHITECTURAL FEATURE TO THE SPRINKLER Metal Tubing Support. Anchor AquaPEX Tubing SecurelyEnough to SHALL NOT EXCEED THE MAXIMUM LISTED SPACING OF THE SPRINKLER. 1. Metal tubing supports that willetl for plastic tubing shall be used. ( q B 9 Support the Tubing,Yet Relaxed V' Enough to Allow the Tubing to Expand and Contract) (3)THE HYDRAULIC DESIGN SHALL NOT BE REQUIRED TO CONSIDER THE AREA CREATED BY THE 2. Do not use supports damage the tubing.Inspect metal M ARCHITECTURAL FEATURE, supports for sharp edges. 3. Do not rigidly anchor Uponor AquaPEX' rn tubing with supports.Allow 1. Along Horizontal Runs,Install Supports Every 32",If Horizontal Runs are Continuously Supported,Place Tubing Supports at Six-Foot Intervals. enough tubing for freedom of movement to expand and contract. 2. Along Vertical Runs,Install Supports Every Four to Five Feet,at Each 17,NFPA 130 8,3 LOCATION OF SPRINKLERS. Floor and at a Mid-story Guide. (2THROUGH 8.3.8. o • 8.3.2 SPRINKLERS SHALL NOT BE REQUIRED IN BATHROOMS OF 55 FT.(5.1 Mx)AND LESS In-line Flow Test W 4 o • 8.3.3 SPRINKLERS SHALL NOT BE REQUIRED IN CLOTHES CLOSETS,LINEN CLOSETS,AND PANTRIES THAT The In-line flow Test can be constructed on site. It performs a flow test[o MEET ALL OF THE FOLLOWING CONDITIONS: du Z (1)THE AREA OF THE SPACE DOES NOT EXCEED 24 FT°(2.2 M°). High Upstream Pressure ensure proper system operation and lbw(see Figure F001-8). w _ ;? ^' WITHIf need upstream pressure exceeds BD psi a pressure reducing valve may -.-. z,z ,, n (2)THE WALLS AND CEILINGS ARE SURFACED NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE CON C RUCTION. to be installed. Some jurisdictions may require a pressure reducing 4C ''.1$,� m • MATERIALS AS DEFINED IN NFPA 220,STANDARD ON TYPES OF BUILDING CONSTRUCTION. valve regardless of upstream pressure. Uponor AquaPEX /,// < w c 8.3.4' SPRINKLERS SHALL NOT BE REQUIRED IN GARAGES,OPEN ATTACHED PORCHES,CARPORTS,AND `. TubMg ///,p? SIMILAR STRUCTURES YP/////// r l 71, ''/p//� � D W 8.3,5 SPRINKLERS SHALL NOT BE REQUIRED IN ATTICS WITH OR WITHOUT STORAGE,PENTHOUSE -I Q g • EQUIPMENT ROOMS,ELEVATOR MACHINE ROOMS,CONCEALED SPACES DEDICATED EXCLUSIVELY TO AND -/ _ --i. / J Q z p m CONTAINING ONLY DWELLING UNIT VENTILATION EQUIPMENT,FLOOR/EILING SPAES,ELEVATOR SHAFTS, __ _- CRAWL SPACES,AND OTHER CONCEALED SPACES THAT ARE NOT USED OR INTENDED FOR LIVING _-- V I - li N r I , -- - } .,c•i 0 J W 6 c PURPOSES. =G VQv • 8.3.5.1 SUCH SPACES THAT CONTAIN FUEL-FIRED EQUIPMENT SHALL ALSO COMPLY WITH 8.3.5.1.1 OR •/ _ _ -.�aL� _ _yG_ I E � 0 w 8.3.5.1.1 WHERE THE FUEL-FIRED EQUIPMENT IS ABOVE ALL OF THE OCCUPIED AREAS OF THE DWELLING Male Threaded Coupling ProPEX fire W ^ S B v¢a u=i O p • UNIT,NO SPRINKLER PROTECTION SHALL BE REQUIRED IN THE CONCEALED SPACE. : Sprinkler Adapter v W y 8.3.5.1.2 WHERE FUEL-FIRED EQUIPMENT IS BELOW OR ON THE SAME LEVEL AS OCCUPIED AREAS OF THE U J DWELLING UNIT,AT LEAST ONE QUICKRESPONSE INTERMEDIATE TEMPERATURE SPRINKLER SHALL BE _ 1"Ball Valve a INSTALLED ABOVE THE EQUIPMENT OR AT THE WALL SEPARATING THE SPACE WITH THE FUEL-FIRED �-To Hot Water Heater Male Threaded Coupling = J d o EQUIPMENT FROM THE OCCUPIED SPACE. /`" Female Threaded �/ D ,.,/ i E • 8.3.6 SPRINKLERS SHALL NOT BE REQUIRED IN UNHEATED ENCLOSURES AT THE BUILDING AT E ('2 ! Tee with Water Ce Q Ce j p +rj • ENTRANCES/EXITS AS LONG AS THE DWELLING UNIT HAS ANOTHER ENTRANCE/EXIT. g u .� Pressure Gauge .9 • 8.3.7 SPRINKLERS SHALL NOT BE REQUIRED FOR CEILING POCKETS THAT MEET THE FOLLOWING Pressure Gauge Sprinkler Orifice (Optional) LLJ Q 0 o 'n CONDITIONS: re o (1)THE TOTAL VOLUME OF ALL UNPROTECTED CEILING POCKETS IN A COMPARTMENT DOES NOT EXCEED E ut ` G G p, v_ 100 FT'{2.83 M0). E Y W g i =o'm o (2)THE ENTIRE FLOOR UNDER THE UNPROTECTED CEILING POCKET IS PROTECTED BY THE SPRINKLERS < W N N Flow Test ��/ AT THE LOWER CEILING ELEVATION. r'°', To ensure the system provides enough water for proper fire sprinkler a [72 I q tJ.. m performance,you should conduct a flow verification test. W d N (3)`THE INTERIOR FINISH OF THE UNPROTECTED CEILING POCKET EXCLUDING DECORATIVE o Uponor Warning Signs / Q < w Y y E' Q K TREATMENTS IS NONCOMBUSTIBLE OR LIMITED-COMBUSTIBLE MATERIAL. o Note: The NFPA 13D Installation Standard does not require Bow (Vfl =, m 3 (4)SKYLIGHTS NOT EXCEEDING 32 FT.(2.97 Mo)SHALL BE PERMITTED TO HAVE A PLASTIC COVER. verification. rL- iil'' p "" • SPRINKLERS SHALL NOT BE REQUIRED IN CLOSETS IN GARAGES AND EXTERIOR CLOSETS g ¢ Pressure Reducing f A ~'3?4 (REGARDLESS OF SIZE)LOCATED ON EXTERIOR BALCONIES,EXTERIOR BREEZEWAYS/CORRIDORS,OR Before performing a flow verification test,confirm the water pressures by V' f Yu ACCESSED FROM OUTDOORS WHERE THE CLOSET DOES NOT HAVE DOORS OR UNPROTECTED z ff, Valve sl a z u PENETRATIONS DIRECTLY INTO THE DWELLING UNIT. c £ contacting the Water and Sewer Department of your local city. Ensure the available water pressure matches the pressure used in the system design, t N • 8.3.9 SPRINKLERS SHALL BE INSTALLED IN ANY CLOSET USED FOR HEATING AND/OR AIR-CONDITIONING SHEET DESCRIPTION EQUIPMENT,WASHERS AND/OR DRYERS,OR WATER HEATERS EXCEPT AS ALLOWED BY 8.3.8. Note: The sprinkler plan indicates the most hydraulically remote sprinkler 'Q Main Fire Sprinkler (or pair of sprinklers). For test requirements on other sprinklers,consult GENERAL NOTES&DETAILS 18. INSULATION GUIDE LINES PER NFPA 13D. 'a Shut-off Valve your local code. a • 9,1.1-WET PIPE SYSTEMS. A WET PIPE SYSTEM SHALL BE PERMITTED TO BE TO BE USED WHERE ALL PIPING IS INSTALLED IN AREAS NOT SUBJECT TO FREEZING,INCLUDING AREAS PROPERLY INSULATED TO MAINTAIN 40oF. Note: It Is a good idea to notify the fire inspector at least 24 hours prior to performing a flow verification test. This may speed up the inspection •• A.9.1.1 IN AREAS SUBJECT TO FREEZING,CARE SHOULD BE TAKEN IN UNHEATED ATTIC SPACES TO process and eliminate the need to repeat the test for the inspector, SHEET NUMBER COVER SPRINKLER PIPING COMPLETELY WITH INSULATION, INSTALLATION SHOULD FOLLOW THE ^' GUIDELINES OF THE INSULATION MANUFACTURER.FIGURE A.9.1.1(A)THROUGH FIGURE A.9.1.1(F) Note: See"AquaSAFE Flow Test Instruction Sheet"(Provided in 5' SHOW SEVERAL METHODS THAT CAN BE CONSIDERED. THESE ARE FOR ILLUSTRATIVE PURPOSES ONLY. ____ __ Contractors Documents package or online at www.Uponorpro.com)for PPpP CONSULTATION WITH THE GENERAL CONTRACTOR AND/OR OWNER IS RECOMMENDED TO ENSURE more information on Flow Test Setup,Assembly,Performing the Test and trr PROPER METHODS AND MATERIALS ARE USED TO MAKE SURE 40°F WILL BE MAINTAINED. ---- Troubleshooting. If there are any questions please contact Uponor. 80 psi © UPONOR - CONFIDENTIAL FO 0 1 PRV Set Pressure