Loading...
Correspondence ms-rz0ZI- UuLA by LLower Columbia Engineering C 58640 McNulty Way E St. Helens, OR 97051 503.366.0399 Technical Memorandum To: Brad Hendrickson From: Andrew Niemi, P.E. Date: February 24, 2022 Subject: Remodel — 15760 SW Highland Road—Patio Cover Structural Assessment of Framing Modifications Job No.: 3216 Brad: As you requested, we have assessed the changes that were made by your contractor to the framing of your patio cover that is being constructed at 15760 SW Highland Road in Tigard, Oregon. We have reviewed the current framing condition and the only item of structural significance that deviated from our original design was the fact that the glulam cross beams were not bolted directly to the posts. Based on my assessment of this current condition, I have determined that the existing framing is adequate if the wall that is framed over the glulam beam on the house end is sheathed with 15/32" APA rated panels attached with 8d nails at 12" on center in the panel field and 6" on center along all panel edges. Also, make sure to install the Simpson H2.5 hurricane ties at each rafter end. Please don't hesitate to call with any questions regarding this summary. Sincerely, 4-��D PROFFS Andrew Niemi, P.E. / „k INEF sa Principal Engineer ,e R _ 987PE t�REGON 1� °kY9, .'A0 .4VDARRIN- EXPIRES:DECEMBER 31,2022 --------------- Lower Columbia Engineering, LLC