Loading...
Report (3) ..... (2Z Oregon Residential Specialty Code R318.2 MOISTURE CONTENT ACKNOWLEDGEMENT FORM , am the general contractor or the owner-builder at the following address: Site Address: S 0'1 A. \AA__ City: Permit#: NA Subdivision/Lot#: and/or Map and Tax Lot#: To conform with the 2008 Oregon Residential Specialty Code(ORSC), Section R318.2 and OAR 918-480-0140, I am notifying the building official that I am aware of the moisture content Requirement of ORSC Section R318.2 and have taken steps to meet this code requirement. [Section R318.2 is provided for reference]. R318.2 Moisture Content: Prior to the installation of interior finishes, the building official shall be notified in writing by the general contractor that all moisture-sensitive wood framing members used in construction have a moisture content of not more than 19 percent by dry weight of dry framing members. Signature: Date: .5.1.2 Owner-Builder I:\BuildingTorm‘RES-MoislureSensitiveWootdoc 09/25/08 Oregon Residential Specialty Code N1107.2 HIGH-EFFICIENCY INTERIOR LIGHTING SYSTEMS Jurisdiction: Permit No.: - A C:( Site Address: 3 c> l- Subdivision/Lot#: (9-- and/or Map and Tax Lot#: By my signature below, I certify that a minimum of fifty(50)percent of the permanently installed lighting fixtures in the above mentioned building have been installed with compact or linear fluorescent,or a lighting source that has a minimum efficacy of 40 lumens per input watt. (Oregon Residential Specialty Code N1107.2)I Signature: Date: /02 SIA02_ A.antractor/Authoriied Agent Print Name: ORSC Section NI107.2.High-efficiency interior lighting systems. A minimum of fifty(50)percent o the permanently installed lighting fixtures shall be installed with compact or linear fluorescent,or a lighting source that has a minimum efficacy of 40 lumens per input watt. Screw-in compact fluorescent lamps comply with this requirement. The building official shall be notified in writing at the final inspection that a minimum of fifty percent of the permanently installed lighting fixtures are compact or linear fluorescent,or a minimum efficacy of 40 lumens per input watt. IABuildineForms\RES-Hi gh Effic i ency Li ghtin g.doc 07/01/08 . • Oregon Residential Specialty Code R408.1 MOISTURE BARRIER ACKNOWLEDGEMENT FORM r\ , am the general contractor or the owner-builder at the following address: Site Address: k 9-- City: (S.37.ht. Permit#: Subdivision/Lot#: and/or Map and Tax Lot#: To conform with the 2014 Oregon Residential Specialty Code(ORSC), Section R408.1 Ventilation. I am notifying the building official that I have installed the Moisture Barrier as per Requirement in ORSC Section 408.1 and have taken the following steps to meet this code requirement: FR—fhe ground surface of the under-floor space is covered with 6-mil black polyethylene sheeting with Dioints lapped 12"at seams and ending up the foundation walls 12". /02 —1.A Signatur Date: I L or Owner-Builder 1:1Building\Fcam\RES-MoistureSanier.doc 09/13/2016 votisseiriesk ma Certificate of Compliance This document certifies that the fiberglass insulation has been installed in conformance with the manufacturer's recommendations and requirements to provide thermal resistance value(s)of: R-value Thickness Coverage Area Ceilings: R-49 X New Construction Vaults/Slopes: Walls: n Upgrade Blown in R-23 Rim Joist: Floors: Over Garage R-38 Crawl Vapor Barrier installed_Y N Sprinkler Tenting 4 mil Poly x Y _N Loose-Fill Insulation R-49 using bags of insulation to cover square feet of area at a thickness of 16.75 inches. Owens Corning'PROPINK"L77 Loosefill Insulation Owens Corning will accept no responsibility when the product is not installed in accordance with the product label.Stated R-value is provided by installing the required number ofbags at a thickness not less than the labeled minimum thickness.Installation of the required number ofbags may yield more than the specified minimum thickness.Failure by the installer to provide both the required bags and at least the minimum thickness will result in lower insulation R-value. R-VALUE BAGS PER MAXIMUM NET MINIMUM WEIGHT MINUMUM 1000 SQ.FT. COVERAGE PER SQ.FT. THICKNESS To obtain a No.of bags per 1000 sq. Contents of this bag Weight per sq.ft.of Installed insulation thermal resistance ft.of net area: should not cover installed insul.should should not be less (R)of: more than:(sq.ft.) not be less than:(lbs.) than:(in.) 60 28.0 35.8 0.895 20.00 49 22.2 45.0 0.711 16.75 44 19.7 50.7 0.631 15.00 38 16.7 59.9 0.534 13.25 30 13.0 77.0 0.416 10.50 26 11.2 89.6 0.357 9.25 22 9.4 106.3 0.301 8.00 19 8.0 125.0 0.256 7.00 13 5.4 184.6 0.173 4.75 Property Address: 13072 SW Aubergine Terrace, Lot 2, Tigard, OR 11/08/21 Carolina Jarquin Date of Installation Westside Drywall Inc.authorization 12/29/21 r_4,6. ya., to, .0 Today's Date Buildi C ractor's Signature Taylor Morrison Company/Customer Name P.O.BOX 99*HUBBARD,OR 97032*(503)620-7036*FAX(503)624-0599*CCB#71044 Form 640S 2017 Completion Certification—Site Inspection Erie r , ust New Homes Program—Single Family C of Oregon To be completed by Verifier CLEAResult is a Program Management Contractor for Energy Trust of Oregon,Inc. Payment information Incentive Payee Company Name: 'Taylor Morrison Inc-Portland Its this payment redirected?: 'No Builder or Company: Taylor Morrison Inc-Portland Redirect to Name. Verifier Payee Company Name: Performance Insulation and Energy Redirect Payee Corn Affordable Housing No Solar Ready Builder Incentive: 'Solar ReadyVerifier Ince' Site Information Development RT 113 t asttridge Rowhomes 12 Axis ID: 'REM/Rate®ID: Address: 13072 SW AUBERGINE TERR Street Line 2 Multi-Family 'No City: Tigard State: OR Zip. 97224 Total conditioned area(sq.ft.): 2,157 House Volume: I 20,358 Housing Type: Townhouse end Number of Stories: 14 Number of Bedrooms: 3 Foundation Type: Slab Floor Electric Provider: Portland General Electric Gas Provider: NW Natural Gas Solar installed Solar Installer Name/Company: Blue shaded fields are required for EPS sheet Verification Type Actual Model Equipment Details&Notes Slab Perimeter Insulation R- Slab Under Insulation R- Framed Floor R- 30.0 Secondary Framed Floor R- Insulation Above Grade Wall Insulation R- 23 Below Grade Wall Insulation R- Flat Ceiling Insulation R- 49.0 Vaulted Ceiling Insulation R- Windows Windows U- 0.3 SHGC:J0.3 Total window area. I Cooling Air Conditioning SEER: 0 Model#. Primary Heating System Details AFUE: 95 Brand Lennox Type: Gas Furnace HOPE: Model#. ML196UH070XE36B-52 Heating Fuel: Gas SEER: Primary Heat Source Comment COP. Location. Attic Outdoor Unit(for heat pumps) ECM: No Model#: ' AHRI Certificate:4805339 #of Systems 11 Gallons: I Brand: AOSmith Water Heater Type Heat Pump EF: I Model#: HPTU-66N 130 Water Heating Fuel Electric Location 'Garage or ope AHRI Certificate: Ducts and Duct Location (Partial %ducts inside: I50% . 1 Duct Leakage I189 Testing Infiltration Air Changes per Hour(ACH)@ 50Pa: 5.8 Ventilation Type HRV/ERV Model. Ventilation Supply Side-Air Cycler Airflow measured or why untestable? Roof Termination Appliances Refrigerator kWlJyr Model. ENERGY STAR Diswasher kwh/yr 270 Model: GDF51"'J— Percent High Efficacy Interior Lighting(%) 100% Thermostat Showerhead 1.5 GPH I Showerwand 1.5 GPH I Showerhead 1.6 GPH I IShowerhead 1.75 GPH Notes: