DATE: 1/05/2022
REQUEST FOR INFORMATION RFI#:
BEAVERTON MOTORCYCLES -Job#: 22002.
TO: Steven Eggleston FROM: Tim Gunter l ECEIVE
Axis Design Group, Inc. Hallmark Interiors, Inc
PHONE: 503-284-0988 PHONE: 503-698-2438 JAN 3 12022
EMAIL: stevene@axisdesigngroup.com EMAIL: timghallmark@icloud.com OF 7I�;ARd
CC: Scott Brockway-Walen Construction
Lisa Berardo-Walen Construction 3UILDING DIVISION
Ken Rust-VLMK Consulting Engineers Inc
Please review the following RFI as soon as possible. The outcome of this RFI may lead to additional costs or time
needed to complete the project.
SUBJECT: 3 5/8" 18 GA STUDS 16"O.C. ON FULL HEIGHT WALL DRAWING#:
SPEC SECTION:
DATE RESPONSE REQ'D: 01/07/2022
QUESTION _ {{
t L gibA'Of: ,a 4 rtf,,, . aft,s byH, 5,,,.it i¢ .v <e t „Ti ti 4
Is it acceptable to use 3 5/8" 18 ga studs 16"o.c. on the full height wall? Please advise.
SUGGESTION:
RESPONSES
3625162-43 AT 16" O.C.ARE ACCEPTABLE IN LIEU OF THE 4005162-33 AT 16" O.C.SHOWN ON THE PLANS.
VLMK(KEN RUST)01-06-22
\c„.R�D iPN� ss/o
i 656 •E
6" GO h
12, 0CL.
�D• RUS' 01-06-21
EXPIRES: 12/31/2022
aI n 20915 SW 105th Avenue I Tualatin,OR 97062
NroP P:(503)718-6680 I F:(503)210-7090 I W:WalenGC.com
Construction
OR CCB:223805 I WA LIC:WALENCL816BP
A t DESIGNGROUP Serving our clients since 2000
2Q
ARCHITECTURE&ENGINEERING,INC. vt:aRS
ARCHITECTURALDESIGN MASTERPLANNING LANDUSEPLANNING I
ARCHITECT'S SUPPLEMENTAL INSTRUCTION (ASI) No. 01
ASI Number: 001
Date of issuance: January 27, 2022
Contract for: General Construction
Contract date: Click here to enter a date.
AXIS project number: 21-019
Project: Lanphere Motorcycle
10500 SW Cascade Ave.,
Tigard,OR 97223
Owner: Lanphere Enterprises
324 SW 4th Street,
Troutdale,OR 97060
To contractor: Walen Construction
20915 SW 105th Ave
Tualatin,OR 97062
The work shall be carried out in accordance with the following supplemental instructions issued in accordance with the
Contract Documents without change in Contract Sum or Contract Time. Proceeding with the work in accordance with these
instructions indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. If the
Contractor determines that there is a change in the Contract Sum or Contract Time, a written notification to the Owner is
required within 10 days.
DESCRIPTION:Attachment description here...
CHANGES TO ARCHITECTURAL PROJECT MANUAL
ASI NUMBER: REASON FOR: REFER TO: SECTION It;NAME-DESCRIPTION
CHANGES TO ARCHITECTURAL DRAWING
ASI NUMBER: REASON FOR: REFER TO: SHEET#;NAME-DESCRIPTION
ASI 01.01 OWNER REQUEST G-004;FIRE AND LIFE SAFETY PLAN
REVISE • Revised FLS floor plan to reflect Dyno 109 revisions.
DELETE • Delete Specialty Tools 133.
REVISE • Revised FLS floor plan to reflect Fluids 134
revisions.
ASI 01.02 OWNER REQUEST A-111; DEMOLITION PLAN
DELETE/ • Delete(E)Overhead Sectional Door 101C.
DELETE/ • Delete(E) HM Door 102.
DELETE/ • Delete(E)Alum Door 106.
11104 S.E.STARK STREET,PORTLAND,OR 97216 j 503,284.0988 I WWW.AXISDESIGNGROUP.COM 1/3
•
DELETE • Delete(E)glazing and seals at window types:A.1,
B.1,C.1.
ASI 01.03 OWNER REQUEST A-121;FLOOR PLAN
ADD • Furr out exterior walls:Sales/Service Reception
101,Sales/Service Office 102,Sales/Service Office
103,Waiting 104.
ADD • Add (N)Security Roll-up Door 101C.
REVISE • Revise(N) HM Door Type 101D to C.1.
DELETE/ • Delete(E) HM Door 102.Add(N) HM Door 102.
ADD
DELETE/ • Delete Window Type C and Add transaction
ADD counter to Sales/Service Office 102.
REVISE • Revise(N) HM Door Type 103 to C.1.
REVISE • Revise(N) HM Door Type 104 to C.1.
ADD • Add (N)Alum Door 106.
REVISE • Revised floor plan to reflect Dyno 109 revisions.
ADD • Add (N) HM Door 109 to new Dyno 109 enclosure.
DELETE • Delete Specialty Tools 133.
REVISE • Revised floor plan to reflect Fluids 134 revisions.
ADD • Add resilient flooring LVT-1 to:Sales/Service
Reception 101,Sales/Service Office 102,
Sales/Service Office 103,Waiting 104.
ADD • Replace(E)glazing and seals at window types:A.1,
B.1,C.1.
ASI 01.04 OWNER REQUEST A-151; REFLECTED CEILING PLANS
REVISE • Revised RCP to reflect Dyno 109 revisions.
DELETE • Delete Specialty Tools 133.
REVISE • Revised RCP to reflect Fluids 134 revisions.
ASI 01.05 OWNER REQUEST A-552;DOOR AND WINDOW DETAILS
DELETE/ • Delete(E)Overhead Sectional Door 101C.Add (N)
ADD Security Roll-up Door 101C.
ASI 01.06 OWNER REQUEST A-621;DOOR SCHEDULE AND STOREFRONT/
WINDOW SCHEDULE
DELETE/ • Delete(E)Overhead Sectional Door 101C.Add (N)
ADD Security Roll-up Door 101C.
REVISE • Revise(N) HM Door Type 101D to C.1.
ADD • Add (N) HM Door 102.
REVISE • Revise(N) HM Door Type 103 to C.1.
REVISE • Revise(N) HM Door Type 104 to C.1.
ADD • Add (N)Alum Door 106.
ADD • Add (N) HM Door 109.
DELETE • Delete Specialty Tools Door 133.
ADD • Add window types:A.1, B.1,C.1.
ASI 01.07 OWNER REQUEST A-622; ROOM FINISH AND INTERIOR MATERIALS
FINISH LEGEND
ADD • Add resilient flooring LVT-1 to:Sales/Service
Reception 101,Sales/Service Office 102,
Sales/Service Office 103,Waiting 104.
DELETE • Delete Specialty Tools Door 133.
11104 S.E.STARK STREET,PORTLAND,OR 97216 I 503.284.0988 I WWW.AXISDESIGNGROUP.COM 2/3
ATTACHMENTS:
REFERENCE NO. REVISION DATE DESCRIPTION
ASI 01.01 1/25/2022 G-004;FIRE AND LIFE SAFETY PLAN
ASI 01.02 1/25/2022 A-111;DEMOLITION PLAN
ASI 01.03 1/25/2022 A-121; FLOOR PLAN
ASI 01.04 1/25/2022 A-151;REFLECTED CEILING PLAN
ASI 01.05 1/25/2022 A-552;DOOR AND WINDOW DETAILS
ASI 01.06 1/25/2022 A-621;DOOR SCHEDULE AND STOREFRONT/WINDOW SCHEDULE
ASI 01.07 1/25/2022 A-622; ROOM FINISH AND INTERIOR MATERIALS FINISH LEGEND
DISTRIBUTION:
TO COMPANY EMAIL
Lisa Berardo Walen Construction Iberardo@WalenGC.com
REQUESTED BY ARCHITECT:
Steven Eggleston, Project Architect
Signature Printed name,Title
11104 S.E.STARK STREET,PORTLAND,OR 97216 1503.284.0988 I WWW.AXISDESIGNGROUP.COM 3/3
FOR OFFICE USE ONLY—SITE ADDRESS:
This form is recognized by most building departments in the Tri-County area for transmitting information.
Please complete this form when submitting information for plan review responses and revisions.
This form and the information it provides helps the review process and response to your project.
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
111 _ Transmittal Letter
T I G A iz D 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
TO: Permit Services DATE RECEIVED:
DEPT: BUILDING DIVISION C
FROM: Steven Eggleston JAR a 1 2022
COMPANY: AXIS Design Group Architecture&Engineering,Inc. i Y OF TIGARD
PHONE: (503)284-0988 Direct:(971)533-8727 WILDING DIVISIO1\1By:
EMAIL: stevene@axisdesigngroup.com
RE: 10500 SW Cascade Ave,Tigard,Oregon 97223 BUP2021-00279
(Site Address) (Permit Number)
BL BM Service Shop TI/1S135BA03302&1S135BA03303
(Project name or subdivision name and lot number)
ATTACHED ARE THE FOLLOWING ITEMS:
Copies: Description: Copies: Description:
Additional set(s) of plans. 3 Revisions: G-004,A-111,A-121,A-151,A-552,A-621 and A-622
Cross section(s) and details. Wall bracing and/or lateral analysis.
Floor/roof framing. Basement and retaining walls.
Beam calculations. Engineer's calculations.
Other(explain): RFI-001;ASI-001
REMARKS: Changes to Project Reflected in:RFI-001-3 5/8"18 GA STUDS 16"O.C.ON FULL HEIGHT WALL;Sheets A-121 and
ASI-001;Sheets G-004,A-111,A-121,A-151,A-552,A-621 and A-622
FOR OFFICE USE ONLY
Routed to Permit Techni 'an: Date: a- , - Initials: Tf-
Fees Due'{J Ye No Fee Description: Amount Due:
O, S. plate re,rle $ 4s
$
$
$
Special
Instructions: �T .
Reprint Permit(per PE): C Yes I I No E Done
,/
Applicant Notified: y— mate: l 742.2 Initials:
PP