Plans OFFICE COPY
RECEIVED d
JAN 1 4 2022 a4 <o c
GAS SIZING CHART TABLE 12-81 0N= °
NW MOTHERS MILK BANK-GAS PIPE SCHEDULE •^ w ..
:ITY OF TIGAF xi a,N 3�_
GAS TYPE: NATURAL GAS APPLIANCE QUANTITY FIXTURE TAG BTU LOAD TOTAL BTU LOAD PIPE SIZE a N E
INLET PRESSURE: 2.0 PSI BACKUP GENERATOR 1 ! N/A 350,365 350,365 3/4" BUILDING Dl1/t`QN u Ino • a
PRESSURE DROP: 1.5 PSI TOTAL LOAD , 350,365 �'+ Q=�V 3
;„ O c..o c c
SPECIFIC GRAVITY: 0.6 PSI c� a
DISTANCE: 100FT O
1/2" 320,000 BTU
Pk
3/4" 669,000 BTU itn.
•
1" 1,262„000 BTU
1 1/4" 2,588,000 BTU p1'"`
1 1/2" 3,878,000 BTU
BACKUP
GENERATOR
OFFICE COPY a: Project
CITY �}r�� NW MOTHERS MILK BANK
Oi' IG 15875 SW 74TH AVE.
TIGARD,OR 97224
REVI f FOR CODE COMPLIANCE
Approved: I -9'NGREV
OTC: t j
Permit#: rr pc aO01c,- 0 0 I a.8 .
Address: ) 8 7S 74 qv
Suite # :
By: ]I Date: 3 -/g.-_ 35
y�N/G
1
VALIDITYOF PERMIT REVISION SCHEDULE
THE ISSUANCE OF A PERMIT Dees A: issue Dale
.9►j PERMIT SET
BASED ON CONSTRUCTION
DOCUMENTS AND OTHER j
DATA SHALL NOT PREVENT _
THE CODE OFFICIAL FROM GAS METER
REQUIRING THE CORRECTION
OF ERRORS. OSSC 105.4
SHEET TITLE: '
PLUMBING
PLANS
DRAWN BY: JOSH CRUME
CHECKED BY
SHEET:
P-1 .0
JOB NO
22-532