Loading...
Report COP ' OFFICE COPY OrFiC t,floCaS CAsCocoe mac% TPZ022^ 8 rift eb COMcheck Software Version COMcheckW Interior Lighting Compliance Certificate Project Information RECEIVED Energy Code: 90.1 (2019) Standard DEC 15 2021 Project Title: 210194-Tesla Center-Tigard, OR Project Type: Alteration CITY OF TIGARD BUILDING DIVISION Construction Site: Owner/Agent: Designer/Contractor: 10065 SW Cascade Blvd. Frederick J.Goglia 1 Tigard, Oregon 97223 1950 Craig Rd. Suite 300 Saint Louis, Missouri 63146 314-415-2400 Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed (ft2) Watts/ft2 Watts 1-Shop Area (Automotive:Vehicular Maintenance Area) 31847 0.60 19108 2-Customer Restrooms(Common Space Types:Restrooms) 147 0.63 93 3-Conference Rooms(Common Space 218 0.97 211 Types:Conference/Meeting/Multipurpose) 4-Office(Common Space Types:Office-Open Plan) 500 0.61 305 5-Existing RR corridor(Common Space Types:Corridor/Transition <8 ft 79 0.41 32 wide) 6-Lounge(Common Space Types:Lounge/Breakroom) 1841 0.59 1086 7-Break Rm (Common Space Types:Lounge/Breakroom) 779 0.59 460 8-Parts Storage(Common Space Types:Storage>=1000 sq.ft.) 4234 0.38 1609 9-janitor's closet(Common Space Types:Storage <50 sq.ft.) 35 0.51 18 10-I.T. ROOM (Common Space Types:Computer Room) 60 0.94 56 11-Electrical Closet(Common Space Types:Electrical/Mechanical): Exempt 12-Electrical room (Common Space Types:Electrical/Mechanical): Exempt 13-Compressor Rm. (Common Space Types:Electrical/Mechanical) 117 0.43 50 14-Employee Restrooms(Common Space Types:Restrooms): Exempt 15-Customer Check-in (Common Space Types:Lobby-General) 3332 0.84 2799 Total Allowed Watts = 25828 Area Category Exemption Qualifications Connected Watts Total # Watts Activity Area Pre-Alt. Repl./Added Pre-Alt. Post-Alt. Electrical Closet (Common Space Types: 64 0 64.000 64.000 Electrical/Mechanical. 60 sq.ft.) Exemption: Less than 20%connected lighting watts replacement. Electrical room (Common Space Types: 100 0 100.000 100.000 Electrical/Mechanical. 130 sq.ft.) Exemption: Less than 20%connected lighting watts replacement. Employee Restrooms (Common Space Types: 480 0 480.000 480.000 Restrooms. 445 sq.ft.) Exemption: Less than 20%connected lighting watts replacement. Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21 Data filename: Page 1 of 13 Proposed Interior Lighting Power A B C D E Fixture ID : Description / Lamp I Wattage Per Lamp/ Ballast Lamps/ # of Fixture (C X D) Fixture Fixture Watt. Shop Area (Automotive: Vehicular Maintenance Area, 31847 sq.ft.) LED: L111/L112: LED HIGHBAY: Other: 1 135 135 18225 LED: L133: WET LOCATION LED HIGHBAY:Other: 1 4 162 648 Customer Restrooms (Common Space Types: Restrooms. 147 sq.ft.) LED: L141/L142: LED RECESSED CAN: Other: 1 6 25 150 Conference Rooms (Common Space Types: Conference/Meeting/Multipurpose. 218 sq.ft.) LED: L103/L104: LED 2X2 FLAT PANEL: Other: 1 4 40 160 Office (Common Space Types: Office- Open Plan. 500 sq.ft.) LED: L103/L104: LED 2X2 FLAT PANEL: Other: 1 6 40 240 Existing RR corridor(Common Space Types: Corridor/Transition <8 ft wide, 79 sq.ft.) LED: L103/L104: LED 2X2 FLAT PANEL: Other: 1 2 40 80 Lounge (Common Space Types: Lounge/Breakroom, 1841 sq.ft.) LED: L103/L104: LED 2X2 FLAT PANEL: Other: 1 15 40 600 LED: L164: LINEAR LED PENANT: Other: 1 90 9 792 Break Rm (Common Space Types: Lounge/Breakroom. 779 sq.ft.) LED: L103/L104: LED 2X2 FLAT PANEL: Other: 1 12 40 480 Parts Storage (Common Space Types: Storage >=1000 sq.ft.. 4234 sq.ft.) LED: L111/L112: LED HIGHBAY: Other: 1 15 135 2025 Janitor's closet (Common Space Types: Storage <50 sq.ft.. 35 sq.ft.) LED: L104: LED 2X2 FLAT PANEL: Other: 1 1 40 40 I.T. ROOM (Common Space Types: Computer Room, 60 sq.ft.) LED: L104: LED 2X2 FLAT PANEL:Other: 1 1 40 40 Electrical Closet (Common Space Types: Electrical/Mechanical. 60 sq.ft.): Exempt Electrical room (Common Space Types: Electrical/Mechanical, 130 sq.ft.): Exempt Compressor Rm. (Common Space Types: Electrical/Mechanical, 117 sq.ft.) LED: L102: LED 2X4 FLAT PANEL:Other: 1 1 40 40 Employee Restrooms (Common Space Types: Restrooms. 445 sq.ft.): Exempt Customer Check-in (Common Space Types: Lobby- General. 3332 sq.ft.) LED: L111/L112: LED HIGHBAY: Other: 1 17 135 2295 Total Proposed Watts= 25815 Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1(2019) Sta •. equirements in C the Version COMcheckWeb and to comply with any applicable mandatory requirements listed in t. - lnsp- tion he Ii I Frederick . Goglia 4 i/' 11/23/21 1 g Al _ .! Name-Title Signature ' / Date Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21 Data filename: Page 2 of 13 COMcheck Software Version COMcheckWeb rft Mechanical Compliance Certificate Project Information Energy Code: 90.1 (2019) Standard Project Title: 210194-Tesla Center-Tigard, OR Location: Tigard, Oregon Climate Zone: 4c Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 10065 SW Cascade Blvd. Frederick). Goglia Tigard,Oregon 97223 1950 Craig Rd. Suite 300 Saint Louis, Missouri 63146 314-415-2400 Mechanical Systems List Quantity System Type & Description 1 HVAC System Heating: 1 each-Central Furnace,Gas,Capacity= 65 kBtu/h Proposed Efficiency= 80.00%Et, Required Efficiency: 80.00% Et(or 80%AFUE) Cooling: 1 each-Single Package DX Unit,Capacity= 37 kBtu/h,Air-Cooled Condenser Proposed Efficiency= 17.00 SEER, Required Efficiency: 14.00 SEER Fan System: FAN SYSTEM 1--Compliance(Motor nameplate HP and fan efficiency method) : Fails: FAN 1 : FAILS: Fan energy index must be 1.00 or higher Fans: FAN 1 Supply,Constant Volume, 1200 CFM,0.5 motor nameplate hp, 0.00 fan energy index,fan exception:Single fan <= 5HP SYSTEM COMPLIANCE REQUIREMENT UNKNOWN Alteration details have not been specified Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications,and other calculations submitted with this •ermit application. a proposed mechanical systems have been designed to meet the 90.1 (2019) Standard requirements i• • heck Version CO eck i-b and to comply with any applicable mandatory requirements listed in the Inspection Checkl'•. .�C���� � / I 11/23/21 Frederick).Goglia NO, Name-Title Signature Date Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21 Data filename: Page 3 of 13 1 i 1 COMcheck Software Version COMcheckWeb lit inti Inspection Checklist Energy Code: 90.1 (2019) Standard Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plan Review Complies? Comments/Assumptions 'Si Req.ID 4.2.2, Plans,specifications,and/or ❑Complies 6.4.4.2.1, !calculations provide all information ❑Does Not 6.7.2 with which compliance can be [PR2]1 determined for the mechanical ❑Not Observable systems and equipment and ❑Not Applicable document where exceptions to the ,standard are claimed. Load calculations per acceptable 'engineering standards and handbooks. 4.2.2, Plans, specifications,and/or ❑Complies 9.4.3,9.7 calculations provide all information ElDoes Not [PR4]1 ,with which compliance can be ,determined for the interior lighting `❑Not Observable ;and electrical systems and equipment ,❑Not Applicable ;and document where exceptions to ;the standard are claimed. Information provided should include interior lighting power calculations,wattage of: bulbs and ballasts,transformers and ,control devices. 4.2.5.2 Commissioning shall be performed as ,❑Complies [PR5]1 ;stated in Sections 5.9.2, 6.9.2, 7.9.2, `❑Does Not 8.9.2, 9.9.2, 10.9.2, 11.2(d),and G1.2.1(c).Commissioning must utilize ❑Not Observable �ASHRAE/IES Standard 202 or other ❑Not Applicable 'generally accepted engineering standards acceptable to the building official. FPT and verification requirements for commissioning are as stated in Section 4.2.5.1. Commissioning shall document compliance of the building systems, ;controls, and building envelope with required provisions of this standard. ;Commissioning requirements shall be incorporated into the construction documents. Additional Comments/Assumptions: I 1 JHigh Impact(Tier 1) 1 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21 Data filename: Page 4 of 13 Section # Footing/ Foundation Inspection Complies? Comments/Assumptions & Req.ID 6.4.3.7 Freeze protection and snow/ice ElComplies [FO9]3 melting system sensors for future ❑Does Not connection to controls. ❑Not Observable EJNot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) PI-Medium Impact(Tier 2) T3TLow Impact(Tier 3) Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21 Data filename: Page 5 of 13 __ . Section Mechanical Rough-In Plans Verified Field Verified # Inspection Value Value Complies? Comments/Assumptions & Req.ID 6.4.1.4, HVAC equipment efficiency Efficiency: Efficiency: 0Complies See the Mechanical Systems list 6.4.1.5 verified. Non-NAECA HVAC ODoes Not for values. [ME1]2 equipment labeled as meeting 90.1. DNot Observable CINot Applicable - — —7-7-7 ——----"" El Complies Stair and elevator shaft vents Li' •,' ,,•;,..,,,,, Complies [ME3]3 have motorized dampers that ' 1 ..,•`' ••••,, ;: '?,CIDoes Not automatically close. ' , ',,,•,,Noa-v-,,,,- - ,1-,, •-, , ..• -,-- ',.., , •, , *, , ONot Observable ,EIN ot Applicable --,,f r_._, 6.4.3.4.2, -Outdoor air and exhaust systems LJComplies 6.4.3.4.3 have motorized dampers that 11Does Not [ME4]3 automatically shut when not in use and meet maximum leakage ['Not Observable rates. Check gravity dampers DNot Applicable where allowed. 6.4.3.4.5 Enclosed parking garage DComplies [ME39P ventilation has automatic [1Does Not contaminant detection and capacity to stage or modulate DNot Observable fans to 50%or less of design ONot Applicable capacity. 6.4.3.4.4 Ventilation fans>0.75 hp have DComplies [MEV automatic controls to shut off fan ElDoes Not when not required. UNot Observable IANot Applicable 6.4.3.8 Demand control ventilation EComplies [ME6]1 provided for spaces>500 ft2 and Upoes Not >25 people/1000 ft2 occupant idensity and served by systems [1Not Observable with air side economizer,auto IIINot Applicable !modulating outside air damper 'control, or design airflow>3,000 ; mcf . t • 6.5.3.2.1 DX cooling systems>=75 kBtu/h ,--EIComplies See the Mechanical Systems list . . ,. .,.,___, [ME40]2 (>. U --- 65 kBtu/h effective 1/2016) Does Not for values. and chilled-water and evaporative cooling fan motor hp ['Not Observable >= 1/4 designed to vary supply ONot Applicable fan airflow as a function of load and comply with operational requirements. 6.4.4.1.1 Insulation exposed to weather DComplies [ME7]3 protected from damage. L/Does Not Insulation outside of the conditioned space and associated ['Not Observable with cooling systems is vapor DNot Applicable retardant. 6.4.4.1.2 HVAC ducts and plenums R- R- ;DComplies [ME8]2 insulated per Table 6.8.2. Where !ElDoes Not ducts or plenums are installed in ; l or under a slab,verification may , EiNot Observable ' need to occur during Foundation '• I,DNot Applicable , Inspection. , It--1 6.4.4.1.3 HVAC piping insulation thickness. in. , in. •i_iComplies [ME9]2 Where piping is installed in or -EilDoes Not under a slab,verification may need to occur during Foundation [Not Observable Inspection. :11Not Applicable 6.4.4.1.4 Thermally ineffective panel - ',•-•' ' , ' '' V •ElComplies [ME41]3 surfaces of sensible heating ElDoes Not panels have insulation >= R-3.5. 111Not Observable ,„, „,,,i'' ,-, , ", Cif‘lot Applicable I 11.High Impact(Tier 1) { 'I Medium Impact(Tier 2) r 3 1 Low Impact(Tier 3) 1 Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21 Data filename: Page 6 of 13 . Section Mechanical d # Rough-In Plans Verified Field Verified Complies? Comments/Assumptions & Re ID Inspection Value Value 6.4.4.2.1 Ducts and plenums having ❑Complies [ME10]2 pressure class ratings are Seal ❑Does Not Class A construction. ❑Not Observable ElNot Applicable 6.8.1-15, Electrically operated DX-DOAS ❑Complies 6.8.1-16 units meet requirements per ❑Does Not [ME110]2 Tables 6.8.1-15 or 6.8.1-16. ❑Not Observable ❑Not Applicable 6.4.4.2.2 Ductwork operating >3 in. water ❑Complies [ME11]3 column requires air leakage ❑Does Not testing. [I]Not Observable ❑Not Applicable 6.5.2.3 Dehumidification controls ❑Complies [ME19]3 provided to prevent reheating, ElDoes Not retooling, mixing of hot and cold airstreams or concurrent heating [Not Observable and cooling of the same ❑Not Applicable 1 airstream. 6.5.2.4.1 Humidifiers with airstream ❑Complies [ME68]3 mounted preheating jackets have ElDoes Not preheat auto-shutoff value set to { activate when humidification is ['Not Observable not required. ❑Not Applicable 6.5.2.4.2 Humidification system dispersion ❑Complies a [ME69]3 tube hot surfaces in the ['Does Not airstreams of ducts or air- handling units insulated >= R- ,kj❑Not Observable 0 5. ❑Not Applicable 6.5.2.5 Preheat coils controlled to stop ❑Complies [ME70]3 heat output whenever ElDoes Not mechanical cooling, including economizer operation, is active. ❑Not Observable ❑Not Applicable 6.5.2.6 Units that provide ventilation air ❑Complies [ME106]3 to multiple zones and operate in ❑Does Not conjunction with zone heating and cooling systems are ❑Not Observable prevented from using heating or ❑Not Applicable heat recovery to warm supply air above 60°F when representative building loads or outdoor air temperature indicate that most zones demand cooling. 6.5.3.6 Motors for fans >= 1/12 hp and ❑Complies [ME72]2 < 1 hp are electronically- ElDoes Not commutated motors or have a minimum motor efficiency of [Not Observable 70%.These motors are also ❑Not Applicable speed adjustable for either balancing or remote control. 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 1-3]Low Impact(Tier 3) Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21 Data filename: Page 7 of 13 Section Mechanical Rough-In Plans Verified Field Verified # Inspection Value Value Complies? Comments/Assumptions & Req.ID _ 6.5.3.4 'Parallel-flow fan-powered VAV air ❑Complies [ME108]2 terminals have automatic ❑Does Not controls to a)turn off the terminal fan except when space ❑Not Observable t heating is required or if required ❑Not Applicable for ventilation; b)turn on the terminal fan as the first stage of heating before the heating coil is activated;and c)during heating for warmup or setback temperature control,either operate the terminal fan and heating coil without primary air or reverse the terminal damper logic and provide heating from the central air handler through primary air. 6.5.3.7 Required minimum outdoor air ❑Complies [ME109]2 rate is the larger of minimum ❑Does Not outdoor air rate or minimum exhaust air rate required by ❑Not Observable Standard 62.1,Standard 170, or ❑Not Applicable applicable codes or accreditation standards.Outdoor air ventilation systems shall comply with one of the following: a)design minimum system outdoor air provided < 135%of the required minimum outdoor air rate, b)dampers, ductwork,and controls allow the system to supply<=the required minimum outdoor air rate with a single set-point adjustment.,or c)system includes exhaust air energy recovery complying with Section '6.5.6.1. See the Mechanical Systems list 6.5.3.3 Multiple zone VAV systems with ° -' r❑Complies Fr [ME42]3 DDC of individual zone boxes { jt G a �❑ iforvalues. have static pressure setpoint _ � ; r Does Not `reset controls. °4r: � ❑Not Observable 'S' ^ 4 ��r. ' / '' � ❑Not Applicable 6.5.4.2 HVAC pumping systems with >= < ��°a° w, F �� r °❑Complies [ME2513 3 control values designed for �� >,Lr `:' ;▪ ' ��� d ❑ variable fluid flow(see section �' a< ▪ ;r a Does Not details). ,, � a ' „❑Not Observable 4 , 0 0 ▪.1 ,*'�#❑Not Applicable 6.5.6.1.1 Exhaust Air Energy Recovery for ] ▪a rr'❑Complies [ME5611 ,Nontransient Dwelling Units ' fix' El Does Not a a * � ° � :❑Not Observable �� ❑NOt Applicable 6.5.6.1.2 ;Exhaust air energyrecoveryfora',�� � � ���� ,� ��;❑Complies [ME111]i spaces other than Nontransient � >> r ; � ▪ F ❑ Does Not dwelling units meeting Tables 6.5.6.1.2 1,and 6.5.6.1.2 2. ❑Not Observable � = ❑Not Applicable 6.5.7.2.1 'Kitchen hoods>5,000 cfm have ❑Complies [ME3212 :make up air>=50%of exhaust ?❑Does Not 'air volume. ❑Not Observable '❑Not Applicable 1 High Impact(Tier 1) 12 'Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21 Data filename: Page 8 of 13 Section Mechanical Rough-In Plans Verified Field Verified # Inspection Complies? Comments/Assumptions & Req.ID p l_ Value i Value -- 6.5.7.1 Conditioned supply air to space ElComplies [ME100]2 with mechanical exhaust<=the ❑Does Not greater of criteria of supply flow, required ventilation rate, exhaust ❑Not Observable flow minu the available transffer ❑Not Applicable air(see section details). 6.5.3.8 Occupied standy controls for ,❑Complies [ME11211 zones serving rooms that are ❑Does Not required to have automatic partial OFF or automatic full OFF '' - [Not Observable I lighting controls per Section ,❑Not Applicable 9.4.1.1 shall meet the following , within five minutes of all rooms in" that zone entering occupied standby mode: a)Active heating i't set point shall be setback at least 4"` '1°F, b)Active cooling set point 'kn' F shall be setup at least 1°F and t c)All airflow supplied to the zone ,shall be shut off whenever the space temperature is between �_ the active heating and cooling *a rr set points. 6.5.7.2.4 Approved field test used to pp ,, t< t ❑Complies [ME49]3 evaluate design air flow rates '"._ 's"❑ and demonstrate proper capture s .4, A r Does Not and containment of kitchen '1 u a ',❑Not Observable exhaust systems. =;,117r, 7 4.1', w� "R ❑Not Applicable 6.5.8.1 Unenclosed spaces that are / "� ' A `, '-., c ` r, ❑Complies [ME34]2 heated use only radiant heat a Sri dr �� V$4DDoes Not ^,,, 0 , > ❑Not Observable l a -0,,,, t' 5,4rt 3 �e , '"d❑Not Applicable 6.5.9 Hot gas bypass limited to: < 240 : ,,: , ;r , , t pi❑Complies [ME35]' kBtu/h-15% >240 kBtu/h-10% �1� � T w 4❑Does Not y,ii ' -1,,V s Y 1, ea ❑Not Observable s � �p� �� , , F ❑Not Applicable re 6.4.3.9 Heating for vestibules and air � ` � ,6 4 ',si s❑Complies [ME6312 curtains with integral heating ' " ,Wr: , i , � �t.:•; � � ;� t �:,❑Does Not include automatic controls that h shut off the heatingsystem when , :❑Not Observable outdoor air temperatures> 45F ,' _ / *: ❑Not Applicable Vestibule heating and cooling `,4 1 systems controlled by a 4 thermostat in the vestibule with 7 heating setpoint<= 60F and _ .. cooling setpoint>=80F. ,, 474: ;. 6.5.10 Doors separating conditioned 4, r -❑Complies [ME73]3 space from the outdoors have ; El Does Not controls that disable/reset ' heating and cooling system when ,�ID Not Observable open. 0' , A,:n,, ❑Not Applicable Additional Comments/Assumptions: ...... .... _ _ _ 1 High Impact(Tier 1) I 2 -IMedium Impact(Tier 2) I'3 ILow Impact(Tier 3) Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21 Data filename: Page 9 of 13 Section #k i Rough-In Electrical Inspection Complies? Comments/Assumptions 1& Req.ID i i 9.4.1.1 Automatic control requirements ❑Complies [ELij2 prescribed in Table 9.6.1,for the ❑Does Not appropriate space type, are installed. 1 Mandatory lighting controls (labeled ❑Not Observable;^ as'REQ') and optional choice controls ❑Not Applicable (labeled as'ADD1'and 'ADD2')are implemented. 9.4.1.1a Independent lighting controls installed ❑Complies [EL2]2 per approved lighting plans and all !❑Does Not manual controls readily accessible and, visible to occupants. ❑Not Observable ❑Not Applicable 9.4.1.1b No lighting shall be automatically ❑Complies [EL26]2 turned on-restriced to manual. `❑Does Not ❑Not Observable ❑Not Applicable 9.4.1.1c <= 50%of general lighting power ❑Complies [EL27]2 shall be allowed to be automatically ❑Does Not turned on. ❑Not Observable ❑Not Applicable 9.4.1.1d Bilevel lighting control- <= 50%of `❑Complies [EL28]2 general lighting controlled with one ❑Does Not intermediate step between full off and ` full on. [Not Observable; ONot Applicable 9.4.1.1e Automatic daylight responsive ❑Complies [EL29]2 controls for sidelighting >= 150 watts ❑Does Not controlled by photocontrols. i❑Not Observable ❑Not Applicable 9.4.1.1f Automatic daylight responsive ;❑Complies [EL30]2 controls for toplighting >= 150 watts ❑Does Not controlled by photocontrols. ❑Not Observable ❑Not Applicable 9.4.1.1g Automatic partial OFF: lighting shall ❑Complies [EL31]2 be reduced >= 50%within 20 minutes'❑Does Not of zero occupancy. ❑Not Observable ❑Not Applicable 9.4.1.1h Automatic full OFF: lighting shall be °❑Complies [EL32]2 shut off within 20 minutes of zero i0Does Not occupancy. [Not Observable ❑Not Applicable 9.4.1.1i Scheduled shutoff: all lighting shall be ❑Complies [EL33j2 shut off when scheduled to be ❑Does Not unoccupied. ❑Not Observable ❑Not Applicable 9.4.1.3 Separate lighting control devices for y❑Complies [EL4]1 specific uses installed per approved :❑Does Not lighting plans. ❑Not Observable ❑Not Applicable 9.6.2 Additional interior lighting power ❑Complies [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and ❑Not Observable separated from general lighting. ❑Not Applicable 1 IHigh Impact(Tier 1) i2'Medium Impact(Tier 2) [ 3 1Low Impact(Tier 3) 1 Project Title: 210194-Tesla Center-Tigard, OR Report date: 11/12/21 Data filename: Page 10 of 13 Section i — i # I Rough-In Electrical Inspection 1 Complies? I Comments/Assumptions & Req.ID 3 [ — 1 10.4.1 Electric motors meet requirements ElComplies [EL9j2 where applicable. ❑Does Not ❑Not Observable ElNot Applicable Additional Comments/Assumptions: I 1 High Impact(Tier 1) re Medium Impact(Tier 2) 1333Low Impact(Tier 3) Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21 Data filename: Page 11 of 13 Section # Final Inspection Complies? Comments/Assumptions & Req.ID 6.4.3.1.2 Thermostatic controls have a 5 °F ❑Complies [FI3]3 deadband. ❑Does Not ❑Not Observable ❑Not Applicable 6.4.3.2 Temperature controls have setpoint ,❑Complies [F120J3 overlap restrictions. ❑Does Not ❑Not Observable ❑Not Applicable 6.4.3.3.1 HVAC systems equipped with at least ❑Complies [F121]3 one automatic shutdown control. ❑Does Not DNot Observable [Not Applicable 6.4.3.3.2 Setback controls allow automatic ❑Complies [FI22]3 restart and temporary operation as ❑Does Not required for maintenance. ❑Not Observable ❑Not Applicable 6.4.3.6 When humidification and ❑Complies [FI6]3 dehumidification are provided to a ❑Does Not zone,simultaneous operation is prohibited. Humidity control prohibits DNot Observable 'the use of fossil fuel or electricity to DNot Applicable produce RH > 30%in the warmest zone humidified and RH < 60%in the coldest zone dehumidified. 6.7.2.1 Furnished HVAC as-built drawings ❑Complies [F17]3 submitted within 90 days of system ❑Does Not acceptance. DNot Observable DNot Applicable 6.7.2.2 ,Furnished O&M manuals for HVAC ❑Complies [FI8]3 systems within 90 days of system DDoes Not acceptance. DNot Observable DNot Applicable 6.7.2.3 An air and/or hydronic system ❑Complies [FI9J' balancing report is provided for HVAC ❑Does Not systems serving zones>5,000 ft2 of conditioned area. '❑Not Observable ❑Not Applicable 8.7.1 Furnished as-built drawings for !❑Complies [F116]3 electric power systems within 30 days ❑Does Not of system acceptance. '0Not Observable: ❑Not Applicable 8.7.2 Furnished O&M instructions for ❑Complies [F11713 'systems and equipment to the ❑Does Not building owner or designated representative. ❑Not Observable ❑Not Applicable 9.2.2.3 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [FI18]' lighting power is consistent with what ❑Does Not is shown on the approved lighting plans, demonstrating proposed watts DNot Observable are less than or equal to allowed ❑Not Applicable watts. 9.4.4 At least 75%of all permanently ❑Complies [FI20]' installed lighting fixtures in dwelling ❑Does Not units have >= 55 Im/W efficacy or a >=45 Im/W total luminaire efficacy. ['Not Observable DNot Applicable 1 High Impact(Tier 1) L2J_Medium Impact(Tier 2) 131Low Impact(Tier 3) 1 Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21 Data filename: Page 12 of 13 Section Final Inspection Complies? Comments/Assumptions & Req.ID 10.4.3 Elevators are designed with the ❑Complies [FI2412 proper lighting,ventilation power, and ❑Does Not standby mode. ❑Not Observable ElNot Applicable Additional Comments/Assumptions: r 1 1 iHigh Impact(Tier 1) TiTMedium Impact(Tier 2) [ Low Impact(Tier 3) Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21 Data filename: Page 13 of 13