Report COP ' OFFICE COPY
OrFiC t,floCaS CAsCocoe mac%
TPZ022^ 8
rift eb
COMcheck Software Version COMcheckW
Interior Lighting Compliance Certificate
Project Information RECEIVED
Energy Code: 90.1 (2019) Standard DEC 15 2021
Project Title: 210194-Tesla Center-Tigard, OR
Project Type: Alteration CITY OF TIGARD
BUILDING DIVISION
Construction Site: Owner/Agent: Designer/Contractor:
10065 SW Cascade Blvd. Frederick J.Goglia 1
Tigard, Oregon 97223 1950 Craig Rd. Suite 300
Saint Louis, Missouri 63146
314-415-2400
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed
(ft2) Watts/ft2 Watts
1-Shop Area (Automotive:Vehicular Maintenance Area) 31847 0.60 19108
2-Customer Restrooms(Common Space Types:Restrooms) 147 0.63 93
3-Conference Rooms(Common Space 218 0.97 211
Types:Conference/Meeting/Multipurpose)
4-Office(Common Space Types:Office-Open Plan) 500 0.61 305
5-Existing RR corridor(Common Space Types:Corridor/Transition <8 ft 79 0.41 32
wide)
6-Lounge(Common Space Types:Lounge/Breakroom) 1841 0.59 1086
7-Break Rm (Common Space Types:Lounge/Breakroom) 779 0.59 460
8-Parts Storage(Common Space Types:Storage>=1000 sq.ft.) 4234 0.38 1609
9-janitor's closet(Common Space Types:Storage <50 sq.ft.) 35 0.51 18
10-I.T. ROOM (Common Space Types:Computer Room) 60 0.94 56
11-Electrical Closet(Common Space Types:Electrical/Mechanical): Exempt
12-Electrical room (Common Space Types:Electrical/Mechanical): Exempt
13-Compressor Rm. (Common Space Types:Electrical/Mechanical) 117 0.43 50
14-Employee Restrooms(Common Space Types:Restrooms): Exempt
15-Customer Check-in (Common Space Types:Lobby-General) 3332 0.84 2799
Total Allowed Watts = 25828
Area Category Exemption Qualifications
Connected Watts Total # Watts
Activity Area Pre-Alt. Repl./Added Pre-Alt. Post-Alt.
Electrical Closet (Common Space Types: 64 0 64.000 64.000
Electrical/Mechanical. 60 sq.ft.)
Exemption: Less than 20%connected lighting watts
replacement.
Electrical room (Common Space Types: 100 0 100.000 100.000
Electrical/Mechanical. 130 sq.ft.)
Exemption: Less than 20%connected lighting watts
replacement.
Employee Restrooms (Common Space Types: 480 0 480.000 480.000
Restrooms. 445 sq.ft.)
Exemption: Less than 20%connected lighting watts
replacement.
Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21
Data filename: Page 1 of 13
Proposed Interior Lighting Power
A B C D E
Fixture ID : Description / Lamp I Wattage Per Lamp/ Ballast Lamps/ # of Fixture (C X D)
Fixture Fixture Watt.
Shop Area (Automotive: Vehicular Maintenance Area, 31847 sq.ft.)
LED: L111/L112: LED HIGHBAY: Other: 1 135 135 18225
LED: L133: WET LOCATION LED HIGHBAY:Other: 1 4 162 648
Customer Restrooms (Common Space Types: Restrooms. 147 sq.ft.)
LED: L141/L142: LED RECESSED CAN: Other: 1 6 25 150
Conference Rooms (Common Space Types: Conference/Meeting/Multipurpose. 218 sq.ft.)
LED: L103/L104: LED 2X2 FLAT PANEL: Other: 1 4 40 160
Office (Common Space Types: Office- Open Plan. 500 sq.ft.)
LED: L103/L104: LED 2X2 FLAT PANEL: Other: 1 6 40 240
Existing RR corridor(Common Space Types: Corridor/Transition <8 ft wide, 79 sq.ft.)
LED: L103/L104: LED 2X2 FLAT PANEL: Other: 1 2 40 80
Lounge (Common Space Types: Lounge/Breakroom, 1841 sq.ft.)
LED: L103/L104: LED 2X2 FLAT PANEL: Other: 1 15 40 600
LED: L164: LINEAR LED PENANT: Other: 1 90 9 792
Break Rm (Common Space Types: Lounge/Breakroom. 779 sq.ft.)
LED: L103/L104: LED 2X2 FLAT PANEL: Other: 1 12 40 480
Parts Storage (Common Space Types: Storage >=1000 sq.ft.. 4234 sq.ft.)
LED: L111/L112: LED HIGHBAY: Other: 1 15 135 2025
Janitor's closet (Common Space Types: Storage <50 sq.ft.. 35 sq.ft.)
LED: L104: LED 2X2 FLAT PANEL: Other: 1 1 40 40
I.T. ROOM (Common Space Types: Computer Room, 60 sq.ft.)
LED: L104: LED 2X2 FLAT PANEL:Other: 1 1 40 40
Electrical Closet (Common Space Types: Electrical/Mechanical. 60 sq.ft.): Exempt
Electrical room (Common Space Types: Electrical/Mechanical, 130 sq.ft.): Exempt
Compressor Rm. (Common Space Types: Electrical/Mechanical, 117 sq.ft.)
LED: L102: LED 2X4 FLAT PANEL:Other: 1 1 40 40
Employee Restrooms (Common Space Types: Restrooms. 445 sq.ft.): Exempt
Customer Check-in (Common Space Types: Lobby- General. 3332 sq.ft.)
LED: L111/L112: LED HIGHBAY: Other: 1 17 135 2295
Total Proposed Watts= 25815
Interior Lighting PASSES
Interior Lighting Compliance
Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans,specifications, and other calculations submitted with this permit application.The proposed interior lighting
systems have been designed to meet the 90.1(2019) Sta •. equirements in C the Version COMcheckWeb and to comply
with any applicable mandatory requirements listed in t. - lnsp- tion he Ii I
Frederick . Goglia
4 i/' 11/23/21
1 g Al _ .!
Name-Title Signature ' / Date
Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21
Data filename: Page 2 of 13
COMcheck Software Version COMcheckWeb
rft
Mechanical Compliance Certificate
Project Information
Energy Code: 90.1 (2019) Standard
Project Title: 210194-Tesla Center-Tigard, OR
Location: Tigard, Oregon
Climate Zone: 4c
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
10065 SW Cascade Blvd. Frederick). Goglia
Tigard,Oregon 97223 1950 Craig Rd. Suite 300
Saint Louis, Missouri 63146
314-415-2400
Mechanical Systems List
Quantity System Type & Description
1 HVAC System
Heating: 1 each-Central Furnace,Gas,Capacity= 65 kBtu/h
Proposed Efficiency= 80.00%Et, Required Efficiency: 80.00% Et(or 80%AFUE)
Cooling: 1 each-Single Package DX Unit,Capacity= 37 kBtu/h,Air-Cooled Condenser
Proposed Efficiency= 17.00 SEER, Required Efficiency: 14.00 SEER
Fan System: FAN SYSTEM 1--Compliance(Motor nameplate HP and fan efficiency method) : Fails: FAN 1 : FAILS: Fan
energy index must be 1.00 or higher
Fans:
FAN 1 Supply,Constant Volume, 1200 CFM,0.5 motor nameplate hp, 0.00 fan energy index,fan exception:Single
fan <= 5HP
SYSTEM COMPLIANCE REQUIREMENT UNKNOWN
Alteration details have not been specified
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications,and other calculations submitted with this •ermit application. a proposed mechanical systems have been
designed to meet the 90.1 (2019) Standard requirements i• • heck Version CO eck i-b and to comply with any applicable
mandatory requirements listed in the Inspection Checkl'•. .�C���� � /
I
11/23/21
Frederick).Goglia NO,
Name-Title Signature Date
Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21
Data filename: Page 3 of 13
1 i
1
COMcheck Software Version COMcheckWeb
lit inti
Inspection Checklist
Energy Code: 90.1 (2019) Standard
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
Plan Review Complies? Comments/Assumptions
'Si Req.ID
4.2.2, Plans,specifications,and/or ❑Complies
6.4.4.2.1, !calculations provide all information ❑Does Not
6.7.2 with which compliance can be
[PR2]1 determined for the mechanical ❑Not Observable
systems and equipment and ❑Not Applicable
document where exceptions to the
,standard are claimed. Load
calculations per acceptable
'engineering standards and
handbooks.
4.2.2, Plans, specifications,and/or ❑Complies
9.4.3,9.7 calculations provide all information ElDoes Not
[PR4]1 ,with which compliance can be
,determined for the interior lighting `❑Not Observable
;and electrical systems and equipment ,❑Not Applicable
;and document where exceptions to
;the standard are claimed. Information
provided should include interior
lighting power calculations,wattage of:
bulbs and ballasts,transformers and
,control devices.
4.2.5.2 Commissioning shall be performed as ,❑Complies
[PR5]1 ;stated in Sections 5.9.2, 6.9.2, 7.9.2, `❑Does Not
8.9.2, 9.9.2, 10.9.2, 11.2(d),and
G1.2.1(c).Commissioning must utilize ❑Not Observable
�ASHRAE/IES Standard 202 or other ❑Not Applicable
'generally accepted engineering
standards acceptable to the building
official. FPT and verification
requirements for commissioning are
as stated in Section 4.2.5.1.
Commissioning shall document
compliance of the building systems,
;controls, and building envelope with
required provisions of this standard.
;Commissioning requirements shall be
incorporated into the construction
documents.
Additional Comments/Assumptions:
I 1 JHigh Impact(Tier 1) 1 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21
Data filename: Page 4 of 13
Section
# Footing/ Foundation Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.7 Freeze protection and snow/ice ElComplies
[FO9]3 melting system sensors for future ❑Does Not
connection to controls.
❑Not Observable
EJNot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) PI-Medium Impact(Tier 2) T3TLow Impact(Tier 3)
Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21
Data filename: Page 5 of 13
__ .
Section
Mechanical Rough-In Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
& Req.ID
6.4.1.4, HVAC equipment efficiency Efficiency: Efficiency: 0Complies See the Mechanical Systems list
6.4.1.5 verified. Non-NAECA HVAC ODoes Not for values.
[ME1]2 equipment labeled as meeting
90.1. DNot Observable
CINot Applicable
- — —7-7-7 ——----"" El
Complies
Stair and elevator shaft vents Li' •,' ,,•;,..,,,,, Complies
[ME3]3 have motorized dampers that ' 1 ..,•`' ••••,, ;: '?,CIDoes Not
automatically close. ' , ',,,•,,Noa-v-,,,,- - ,1-,, •-,
, ..• -,-- ',.., , •, , *, , ONot Observable
,EIN ot Applicable
--,,f r_._,
6.4.3.4.2, -Outdoor air and exhaust systems LJComplies
6.4.3.4.3 have motorized dampers that 11Does Not
[ME4]3 automatically shut when not in
use and meet maximum leakage ['Not Observable
rates. Check gravity dampers DNot Applicable
where allowed.
6.4.3.4.5 Enclosed parking garage DComplies
[ME39P ventilation has automatic [1Does Not
contaminant detection and
capacity to stage or modulate DNot Observable
fans to 50%or less of design ONot Applicable
capacity.
6.4.3.4.4 Ventilation fans>0.75 hp have DComplies
[MEV automatic controls to shut off fan ElDoes Not
when not required.
UNot Observable
IANot Applicable
6.4.3.8 Demand control ventilation EComplies
[ME6]1 provided for spaces>500 ft2 and Upoes Not
>25 people/1000 ft2 occupant
idensity and served by systems [1Not Observable
with air side economizer,auto IIINot Applicable
!modulating outside air damper
'control, or design airflow>3,000
; mcf .
t •
6.5.3.2.1 DX cooling systems>=75 kBtu/h ,--EIComplies See the Mechanical Systems list
. . ,. .,.,___,
[ME40]2 (>. U
--- 65 kBtu/h effective 1/2016) Does Not for values.
and chilled-water and
evaporative cooling fan motor hp ['Not Observable
>= 1/4 designed to vary supply ONot Applicable
fan airflow as a function of load
and comply with operational
requirements.
6.4.4.1.1 Insulation exposed to weather DComplies
[ME7]3 protected from damage. L/Does Not
Insulation outside of the
conditioned space and associated ['Not Observable
with cooling systems is vapor DNot Applicable
retardant.
6.4.4.1.2 HVAC ducts and plenums R- R- ;DComplies
[ME8]2 insulated per Table 6.8.2. Where !ElDoes Not
ducts or plenums are installed in ;
l
or under a slab,verification may , EiNot Observable
'
need to occur during Foundation '• I,DNot Applicable
,
Inspection. ,
It--1
6.4.4.1.3 HVAC piping insulation thickness. in. , in. •i_iComplies
[ME9]2 Where piping is installed in or -EilDoes Not
under a slab,verification may
need to occur during Foundation [Not Observable
Inspection. :11Not Applicable
6.4.4.1.4 Thermally ineffective panel - ',•-•' ' , ' '' V •ElComplies
[ME41]3 surfaces of sensible heating ElDoes Not
panels have insulation >= R-3.5.
111Not Observable
,„, „,,,i'' ,-, , ", Cif‘lot Applicable
I 11.High Impact(Tier 1) { 'I Medium Impact(Tier 2) r 3 1 Low Impact(Tier 3) 1
Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21
Data filename: Page 6 of 13
.
Section Mechanical d
# Rough-In Plans Verified Field Verified Complies? Comments/Assumptions
& Re ID Inspection Value Value
6.4.4.2.1 Ducts and plenums having ❑Complies
[ME10]2 pressure class ratings are Seal ❑Does Not
Class A construction.
❑Not Observable
ElNot Applicable
6.8.1-15, Electrically operated DX-DOAS ❑Complies
6.8.1-16 units meet requirements per ❑Does Not
[ME110]2 Tables 6.8.1-15 or 6.8.1-16.
❑Not Observable
❑Not Applicable
6.4.4.2.2 Ductwork operating >3 in. water ❑Complies
[ME11]3 column requires air leakage ❑Does Not
testing. [I]Not Observable
❑Not Applicable
6.5.2.3 Dehumidification controls ❑Complies
[ME19]3 provided to prevent reheating, ElDoes Not
retooling, mixing of hot and cold
airstreams or concurrent heating [Not Observable
and cooling of the same ❑Not Applicable
1 airstream.
6.5.2.4.1 Humidifiers with airstream ❑Complies
[ME68]3 mounted preheating jackets have ElDoes Not
preheat auto-shutoff value set to
{ activate when humidification is ['Not Observable
not required. ❑Not Applicable
6.5.2.4.2 Humidification system dispersion ❑Complies
a [ME69]3 tube hot surfaces in the ['Does Not
airstreams of ducts or air-
handling units insulated >= R- ,kj❑Not Observable
0 5. ❑Not Applicable
6.5.2.5 Preheat coils controlled to stop ❑Complies
[ME70]3 heat output whenever ElDoes Not
mechanical cooling, including
economizer operation, is active. ❑Not Observable
❑Not Applicable
6.5.2.6 Units that provide ventilation air ❑Complies
[ME106]3 to multiple zones and operate in ❑Does Not
conjunction with zone heating
and cooling systems are ❑Not Observable
prevented from using heating or ❑Not Applicable
heat recovery to warm supply air
above 60°F when representative
building loads or outdoor air
temperature indicate that most
zones demand cooling.
6.5.3.6 Motors for fans >= 1/12 hp and ❑Complies
[ME72]2 < 1 hp are electronically- ElDoes Not
commutated motors or have a
minimum motor efficiency of [Not Observable
70%.These motors are also ❑Not Applicable
speed adjustable for either
balancing or remote control.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 1-3]Low Impact(Tier 3)
Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21
Data filename: Page 7 of 13
Section Mechanical Rough-In Plans Verified Field Verified
# Inspection Value Value Complies? Comments/Assumptions
& Req.ID _
6.5.3.4 'Parallel-flow fan-powered VAV air ❑Complies
[ME108]2 terminals have automatic ❑Does Not
controls to a)turn off the
terminal fan except when space ❑Not Observable t
heating is required or if required ❑Not Applicable
for ventilation; b)turn on the
terminal fan as the first stage of
heating before the heating coil is
activated;and c)during heating
for warmup or setback
temperature control,either
operate the terminal fan and
heating coil without primary air
or reverse the terminal damper
logic and provide heating from
the central air handler through
primary air.
6.5.3.7 Required minimum outdoor air ❑Complies
[ME109]2 rate is the larger of minimum ❑Does Not
outdoor air rate or minimum
exhaust air rate required by ❑Not Observable
Standard 62.1,Standard 170, or ❑Not Applicable
applicable codes or accreditation
standards.Outdoor air ventilation
systems shall comply with one of
the following: a)design minimum
system outdoor air provided <
135%of the required minimum
outdoor air rate, b)dampers,
ductwork,and controls allow the
system to supply<=the
required minimum outdoor air
rate with a single set-point
adjustment.,or c)system
includes exhaust air energy
recovery complying with Section
'6.5.6.1.
See the Mechanical Systems list 6.5.3.3 Multiple zone VAV systems with ° -' r❑Complies
Fr
[ME42]3 DDC of individual zone boxes { jt G a �❑ iforvalues.
have static pressure setpoint _ � ; r Does Not
`reset controls. °4r: � ❑Not Observable
'S' ^ 4 ��r. '
/ '' � ❑Not Applicable
6.5.4.2 HVAC pumping systems with >= < ��°a° w, F �� r °❑Complies
[ME2513 3 control values designed for �� >,Lr `:' ;▪ ' ��� d ❑
variable fluid flow(see section �' a< ▪ ;r a Does Not
details). ,, � a ' „❑Not Observable
4 , 0 0 ▪.1 ,*'�#❑Not Applicable
6.5.6.1.1 Exhaust Air Energy Recovery for ] ▪a rr'❑Complies
[ME5611 ,Nontransient Dwelling Units ' fix' El Does Not
a a * � ° � :❑Not Observable
�� ❑NOt Applicable
6.5.6.1.2 ;Exhaust air energyrecoveryfora',��
� � ���� ,� ��;❑Complies
[ME111]i spaces other than Nontransient � >> r ; � ▪ F ❑
Does Not
dwelling units meeting Tables
6.5.6.1.2 1,and 6.5.6.1.2 2. ❑Not Observable
� = ❑Not Applicable
6.5.7.2.1 'Kitchen hoods>5,000 cfm have ❑Complies
[ME3212 :make up air>=50%of exhaust ?❑Does Not
'air volume.
❑Not Observable
'❑Not Applicable
1 High Impact(Tier 1) 12 'Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21
Data filename: Page 8 of 13
Section Mechanical Rough-In Plans Verified Field Verified
# Inspection Complies? Comments/Assumptions
& Req.ID p l_ Value i Value --
6.5.7.1 Conditioned supply air to space ElComplies
[ME100]2 with mechanical exhaust<=the ❑Does Not
greater of criteria of supply flow,
required ventilation rate, exhaust ❑Not Observable
flow minu the available transffer ❑Not Applicable
air(see section details).
6.5.3.8 Occupied standy controls for ,❑Complies
[ME11211 zones serving rooms that are ❑Does Not
required to have automatic
partial OFF or automatic full OFF '' - [Not Observable I
lighting controls per Section ,❑Not Applicable
9.4.1.1 shall meet the following ,
within five minutes of all rooms in"
that zone entering occupied
standby mode: a)Active heating i't
set point shall be setback at least 4"`
'1°F, b)Active cooling set point 'kn' F
shall be setup at least 1°F and t
c)All airflow supplied to the zone
,shall be shut off whenever the
space temperature is between �_
the active heating and cooling *a rr
set points.
6.5.7.2.4 Approved field test used to
pp ,, t< t ❑Complies
[ME49]3 evaluate design air flow rates '"._ 's"❑
and demonstrate proper capture s .4, A r Does Not
and containment of kitchen '1 u a ',❑Not Observable
exhaust systems. =;,117r, 7 4.1', w� "R ❑Not Applicable
6.5.8.1 Unenclosed spaces that are / "� ' A `, '-., c ` r, ❑Complies
[ME34]2 heated use only radiant heat a Sri dr �� V$4DDoes Not
^,,, 0 , > ❑Not Observable l
a -0,,,, t' 5,4rt 3 �e , '"d❑Not Applicable
6.5.9 Hot gas bypass limited to: < 240 : ,,: , ;r , , t pi❑Complies
[ME35]' kBtu/h-15% >240 kBtu/h-10% �1� � T w 4❑Does Not
y,ii ' -1,,V s Y 1, ea ❑Not Observable s
� �p� �� , , F ❑Not Applicable
re
6.4.3.9 Heating for vestibules and air � ` � ,6 4 ',si s❑Complies
[ME6312 curtains with integral heating ' " ,Wr: , i ,
� �t.:•; � � ;� t �:,❑Does Not
include automatic controls that h
shut off the heatingsystem when , :❑Not Observable
outdoor air temperatures> 45F ,' _ / *: ❑Not Applicable
Vestibule heating and cooling `,4 1
systems controlled by a 4
thermostat in the vestibule with 7
heating setpoint<= 60F and _ ..
cooling setpoint>=80F. ,, 474: ;.
6.5.10 Doors separating conditioned 4, r -❑Complies
[ME73]3 space from the outdoors have ; El Does Not
controls that disable/reset '
heating and cooling system when ,�ID Not Observable
open. 0' , A,:n,, ❑Not Applicable
Additional Comments/Assumptions:
...... .... _ _ _
1 High Impact(Tier 1) I 2 -IMedium Impact(Tier 2) I'3 ILow Impact(Tier 3)
Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21
Data filename: Page 9 of 13
Section
#k i Rough-In Electrical Inspection Complies? Comments/Assumptions
1& Req.ID i i
9.4.1.1 Automatic control requirements ❑Complies
[ELij2 prescribed in Table 9.6.1,for the ❑Does Not
appropriate space type, are installed.
1 Mandatory lighting controls (labeled ❑Not Observable;^
as'REQ') and optional choice controls ❑Not Applicable
(labeled as'ADD1'and 'ADD2')are
implemented.
9.4.1.1a Independent lighting controls installed ❑Complies
[EL2]2 per approved lighting plans and all !❑Does Not
manual controls readily accessible and,
visible to occupants. ❑Not Observable
❑Not Applicable
9.4.1.1b No lighting shall be automatically ❑Complies
[EL26]2 turned on-restriced to manual. `❑Does Not
❑Not Observable
❑Not Applicable
9.4.1.1c <= 50%of general lighting power ❑Complies
[EL27]2 shall be allowed to be automatically ❑Does Not
turned on.
❑Not Observable
❑Not Applicable
9.4.1.1d Bilevel lighting control- <= 50%of `❑Complies
[EL28]2 general lighting controlled with one ❑Does Not
intermediate step between full off and `
full on. [Not Observable;
ONot Applicable
9.4.1.1e Automatic daylight responsive ❑Complies
[EL29]2 controls for sidelighting >= 150 watts ❑Does Not
controlled by photocontrols.
i❑Not Observable
❑Not Applicable
9.4.1.1f Automatic daylight responsive ;❑Complies
[EL30]2 controls for toplighting >= 150 watts ❑Does Not
controlled by photocontrols.
❑Not Observable
❑Not Applicable
9.4.1.1g Automatic partial OFF: lighting shall ❑Complies
[EL31]2 be reduced >= 50%within 20 minutes'❑Does Not
of zero occupancy.
❑Not Observable
❑Not Applicable
9.4.1.1h Automatic full OFF: lighting shall be °❑Complies
[EL32]2 shut off within 20 minutes of zero i0Does Not
occupancy. [Not Observable
❑Not Applicable
9.4.1.1i Scheduled shutoff: all lighting shall be ❑Complies
[EL33j2 shut off when scheduled to be ❑Does Not
unoccupied.
❑Not Observable
❑Not Applicable
9.4.1.3 Separate lighting control devices for y❑Complies
[EL4]1 specific uses installed per approved :❑Does Not
lighting plans.
❑Not Observable
❑Not Applicable
9.6.2 Additional interior lighting power ❑Complies
[EL8]1 allowed for special functions per the ❑Does Not
approved lighting plans and is
automatically controlled and ❑Not Observable
separated from general lighting. ❑Not Applicable
1 IHigh Impact(Tier 1) i2'Medium Impact(Tier 2) [ 3 1Low Impact(Tier 3) 1
Project Title: 210194-Tesla Center-Tigard, OR Report date: 11/12/21
Data filename: Page 10 of 13
Section i — i
# I Rough-In Electrical Inspection 1 Complies? I Comments/Assumptions
& Req.ID 3 [ — 1
10.4.1 Electric motors meet requirements ElComplies
[EL9j2 where applicable. ❑Does Not
❑Not Observable
ElNot Applicable
Additional Comments/Assumptions:
I 1 High Impact(Tier 1) re Medium Impact(Tier 2) 1333Low Impact(Tier 3)
Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21
Data filename: Page 11 of 13
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
6.4.3.1.2 Thermostatic controls have a 5 °F ❑Complies
[FI3]3 deadband. ❑Does Not
❑Not Observable
❑Not Applicable
6.4.3.2 Temperature controls have setpoint ,❑Complies
[F120J3 overlap restrictions. ❑Does Not
❑Not Observable
❑Not Applicable
6.4.3.3.1 HVAC systems equipped with at least ❑Complies
[F121]3 one automatic shutdown control. ❑Does Not
DNot Observable
[Not Applicable
6.4.3.3.2 Setback controls allow automatic ❑Complies
[FI22]3 restart and temporary operation as ❑Does Not
required for maintenance.
❑Not Observable
❑Not Applicable
6.4.3.6 When humidification and ❑Complies
[FI6]3 dehumidification are provided to a ❑Does Not
zone,simultaneous operation is
prohibited. Humidity control prohibits DNot Observable
'the use of fossil fuel or electricity to DNot Applicable
produce RH > 30%in the warmest
zone humidified and RH < 60%in the
coldest zone dehumidified.
6.7.2.1 Furnished HVAC as-built drawings ❑Complies
[F17]3 submitted within 90 days of system ❑Does Not
acceptance.
DNot Observable
DNot Applicable
6.7.2.2 ,Furnished O&M manuals for HVAC ❑Complies
[FI8]3 systems within 90 days of system DDoes Not
acceptance.
DNot Observable
DNot Applicable
6.7.2.3 An air and/or hydronic system ❑Complies
[FI9J' balancing report is provided for HVAC ❑Does Not
systems serving zones>5,000 ft2 of
conditioned area. '❑Not Observable
❑Not Applicable
8.7.1 Furnished as-built drawings for !❑Complies
[F116]3 electric power systems within 30 days ❑Does Not
of system acceptance.
'0Not Observable:
❑Not Applicable
8.7.2 Furnished O&M instructions for ❑Complies
[F11713 'systems and equipment to the ❑Does Not
building owner or designated
representative. ❑Not Observable
❑Not Applicable
9.2.2.3 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values.
[FI18]' lighting power is consistent with what ❑Does Not
is shown on the approved lighting
plans, demonstrating proposed watts DNot Observable
are less than or equal to allowed ❑Not Applicable
watts.
9.4.4 At least 75%of all permanently ❑Complies
[FI20]' installed lighting fixtures in dwelling ❑Does Not
units have >= 55 Im/W efficacy or a
>=45 Im/W total luminaire efficacy. ['Not Observable
DNot Applicable
1 High Impact(Tier 1) L2J_Medium Impact(Tier 2) 131Low Impact(Tier 3) 1
Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21
Data filename: Page 12 of 13
Section
Final Inspection Complies? Comments/Assumptions
& Req.ID
10.4.3 Elevators are designed with the ❑Complies
[FI2412 proper lighting,ventilation power, and ❑Does Not
standby mode.
❑Not Observable
ElNot Applicable
Additional Comments/Assumptions:
r
1
1 iHigh Impact(Tier 1) TiTMedium Impact(Tier 2) [ Low Impact(Tier 3)
Project Title: 210194-Tesla Center-Tigard,OR Report date: 11/12/21
Data filename: Page 13 of 13