Permit ..ay.M/NiCnw.tNNtet/vatxIaYifllN.taiitNiifAit&feUHN6YfYUWiW ee+trxrxx reet..rrirr ,rNr.riN.rrxiNt}ifWNetu9ftiWtFiFSMifYFMHrN1a3W46Wf!#WiIxnf Natmrfittut r.i.ie.+e ar..ta U.sr esstxaHuaN '1 NNWiN •uttsrrxr r r anti'tuN<INWfidiri:WFrJH t NwttraN tlHn..t
CITY OF TIGARD BUILDING PERMIT
8 • COMMUNITY DEVELOPMENT Permit#: BUP2022-00055
Date Issued: 3/17/2022
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503,718.2439 Parcel: 2S113AB00600
Jurisdiction: Tigard
Site address: 16150 SW UPPER BOONES FERRY RD
Project: Fairway America,LLC Subdivision:COUNCIL VIEW ACRES(LOTS 21-44) Lot: 30
Project Description: Remodel work to 9027 sqft of existing office space.Work includes selected demo of existing nonstructural
drywall/metal studs walls,suspended ceilings,doors/frames.electrical distribution,lighting.
Contractor: PACIFIC REALTY ASSOCIATES LP Owner: PACIFIC REALTY ASSOCIATES LP
15350 SW SEQUOIA PKWY#300 ATTN: N PIVEN
PORTLAND, OR 97224 15350 SE SEQUOIA PKWY#300
PORTLAND, OR 97224
PHONE: 503-624-6300 PHONE:
FAX: 503-624-7755
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: ALT Type of Const: IIIB Permit Fee-Additions,Alterations, 03/16/2022 $1,045.71
Occupancy Grp: B Occupancy Load: 61 Demolition
12%State Surcharge-Building 03/16/2022 $125.49
Dwelling Units: 0 Plan Review 03/02/2022 $679.71
Stories: 0 Height: 0 ft DC Provision Review.COM TI-Ping 03/16/2022 $274.00
Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 03/16/2022 $418.28
Value: $92,000 Info Process/Archiving-Lg$2.00(over 03/16/2022 $10.00
11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $2,553.19
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232 1987 or 1.800.332.2344.
Issued By: E4garoio-Ma.LoLo'v 4o- Permittee Signature: yew
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application 13 — 2(2. 2 _
Commercial FOR OFFICE USE ONI.Y
RECEIVED Received 53
City of Tigard DateBy: 03 DI � Permit No..BuP2o22-000
II oi
13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review'? 3 2
FEB 2 3 2022 `l Other Permit:
Phone: 503.718.2439 Fax: 503.598.1960 Date/By:
Inspection Line: 503.639.4175 Date Ready/By: /.t is. ® See Page 2 for
TICARD Internet: www.tigard-or.gov CITY OF TIGARD Not /Method. t� Supplemental Information
BUILDING DIVISION ,,,,"
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
I CATEGORY OF CONSTRUCTION work indicated on this application.
Valuation: $
❑ 1-and 2-family dwelling ®Commercial/industrial
❑Accessory building ❑Multi-family Number of bedrooms:
❑Master builder CI Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION ' Total number of floors:
Job site address: 16150 SW Upper Boones Ferry Rd New dwelling area: square feet
City/State/ZIP:Portland,OR 97224 Garage/carport area: square feet
Suite/bldg./apt.no.:- Project name:pb4.1.2.1_Fairway-F,*pansina,1741,r`e Covered porch area: square feet
Cross street/directions to job site: / Deck area: square feet
Other structure area: square feet
REQUIRED DATA;COMMERCIAL-USE CHECKLIST
•
Subdivision: Lot no.: Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Remodel work to 9,027 SF of existing office space.Work includes selected demo Valuation: $92,000.00
of existing nonstructural walls,nonstructural drywall/metal studs walls, Existing building area: 9,027 square feet
suspended ceilings,doors/frames,electrical distribution,lighting New building area: 9,027 square feet
® PROPERTY OWNER ❑ TENANT'. Number of stories: 1
Name:Pacific Realty Associates,LP. Type of construction: III-B
Address: 15350 SW Sequoia Parkway,Suite 300 Occupancy groups:
City/State/ZIP:Portland,OR 97224 Existing: B
Phone:(503)624-6300 Fax:(503)624-7755 New: B
0 APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
(Please refer to fee schedule)
Business name:Pacific Realty Associates,LP. �/ /
Structural plan review fee(or deposit): �479.7
Contact name:Robert Bumcrot
FLS plan review fee(if applicable):
Address: 15350 SW Sequoia Parkway,Suite 300
Total fees due upon application:
City/State/ZIP:Portland,OR 97224
Amount received:
(j Phone:(503)624-6300 Fax: :(503)624-7755
ti ti E-mail:permits@pactrust.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System.
Business name:Pacific Realty Associates,LP. Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address: 15350 SW Sequoia Parkway,Suite 300 Solar Installation Specialty Code checklist.
City/State/ZIP:Portland,OR 97224 Permit fee(includes plan review $180.00
and administrative fees):
Phone:(503)624-6300 Fax:( ) State surcharge(12%of permit fee): $21.60
CCB lie.: 153913 Total fee due upon application: $201.60
Authorized signature: This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name:Robert Bu crot Date: 2/23/2022 * Fee methodology set by Tri-County Building Industry
—_._....._—_.._.. Service Board.
L:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(I I/02/COM/WEB)
r
City of Tigard
it COMMUNITY DEVELOPMENT DEPARTMENT
C
rlcnxD Building Permit Review — Commercial - No Land Use
d€:KJVfiedP11tNW*1 1101 E;tar,*AIIM7spar3 I '. IROck4f t4MM tVtldw 4DRittgalgitt/ , sf14 Xrt?YM s.4i.':MArta. #sX<4uBRIViefnq£tofirtkt,,thlbk g;.
Building Permit #: 134 pZa22—(0
Site Address: /6./SZ ..) vf° Suite/Bldg#:
Project Name: j eAJAy "'YAW,G4- LLC
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: `7"-- Z •
Existing Business Activity: /0 B ffiU.
Proposed Business Activity: N ) /ct
(Verify site address/suite#exists and active in permit system.
❑ River Terrace Neighborhood: ❑ Yes ] No
ring: a-
to
ILfCPermitted Use: 'Yes El No ❑ Spec Space
onfirm no land use required.
fr h Business License:
Exists: ❑ Yes ❑ No,applicant was provided a business license application
Notes:
t
Approved by Planning: — Date: 7/y/'2 Z
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved ❑ Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
t'iG..l;.W_Pli:{&`tZkfsW;rt5Nf.gltP'S*".9tf.£dITWSI"In`ff'fPV/LVimin ttlrM, LtihAt£Ftnffi#.WWPY/,SStk'iJ.M44_rdat'.ttV,Skiffxefl.SB81t EtPtrldtnV4ghfittNisapotxdrnntii1Yh!nutw,.. .,r ,,: xx-, v
Building Permit Submittal
Original Submittal Date: 022/25/22
Site Plans: # .3
Building Plans: # (�
Building Permit#: [kEnter building permit# above.
Workflow Routing: [ 1 fanning ❑ Permit Coordinator UvBuilding
Workflow Sign-off: [L"Sign-off for Planning(include notes from planning review)
Route Application Documents: [0,13u lding: original permit application,site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: Date: �)1OG/221 q-
,rt
I:\Building\Forms\BldgPermitRvw COM NoLandUse_II1819.docx
Permit Coordinator Review
❑ Conditions"Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions(after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A
Tigard Trans SDC: ❑ Yes ❑ N/A
Parks SDC: ❑ Yes ❑ N/A
❑ OK to Issue Permit
Approved by Permit Coordinator: Date:
1:\Building\Fonns\BldgPermitRvw_COM NoLandUse_111819.docx