Loading...
PFI2021-00454 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT 1114 I ' COMMUNITY DEVELOPMENT Permit#: PFI2021-00454 T I C;AHD 13125 SW Hall Blvd..Tigard OR 97223 503.718.2421 Date Issued: 01/03/2022 Parcel: SEG1177 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: Ziply Fiber#5510892 Project Description: Access 3 MHs to splice fiber.Access existing PED to splice and pull fiber.SEGS 1177, 1178, 1180, and 1344 Class of Work: FEES Type 1 -Utilities(gas,electric,data) Description Date Amount PFI Permit Fee 01/03/2022 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tigard-or.gov to schedule inspections online. Contractor: PHONE: Applicant: MICHELLE ROSE 6074 N DISCOVERY WAY STE. 125 BOISE, ID 83713 PHONE: 2085764031 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See ��application , Issued By: / c2 J a Oet,14 L L) Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2021-00454 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code,and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes,etc.shall be reinstalled or replaced,with like kind of material.Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept.of Transportation, FHWA, current edition,American Traffic Safety Services Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic,at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service.Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property,public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14- UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements,shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other City of Tigard pFI#: 2021-00454 lS " ENGINEERING DEPARTMENT TIGARD Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: 5510892 ❑ TYPE 1—Franchise Utility Work Brief description of project: Ziply proposes to access 3 MHs to splice performed byNWN,PCE, or utility agency fiber. Access extisting PED to splice and pull fiber ❑ TYPE 2—ROW Sidewallc/Driveway/Sewer Work performed for the purpose of • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): 12550 SW 68th Ave main line tap ❑ TYPE 3—Full Scale Development Work performed with land use approval which includes any of the following • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: Ziply Fiber-Michelle Rose • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 6074 N Discovery Way Ste. 125 water service area City/State: Boise, ID Zip: 83713 El TYPE 4—Small Cell Technology Phone: 208 576 4031 El TYPE 5—Tigard Triangle Email: permitting©mountainitd.com Phone: 208-576-4031 NOTE: Type 1 and 2 applications may be mulled to towpernits n,tirard-or.eov. Contact name: Phone: Email: CONTRACTOR INFORMATION 0 Same as applicant Name: NorthSky Communication CCB Number: 208747 Mailing address: 11818 S Mill Plain Blvd Ste. 410 City/State: Vancouver, OR Zip: 98684 Phone: 503-975-6272 Ems: pfrazier@northskycomm.corn ENGINEER INFORMATION Name: Russ Wells Mailing address: 4155 SW Cedar Hills Blvd City/State: Beaverton, OR Zip: 98684 Phone: 503-643-1001 Email: russell.wells@ziply.com ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ nia (within the public right-of-way) Is work related to a LAND USE DECISION? ❑Yes ❑CNo Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant,certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. Michelle Rose 12/21/2021 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: PFI2021- Permit fee: -- '7 ? Received by: SPV Date: 12/22/2021 Approved by: Date: 72l2.472/ Notified by: Date: ( t 3 I?-0 22 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PH Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3: DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans(sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the El General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report LI Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13123 SW Hall Blvd. • Tigard,Oregon 97223 • w ti:tigard-or.gov • 503-718-2421 • Page 3 of 4 Edge of Pavement 'III" — Ditch Streetlight III (1IIkt- --- -•-•-•-•-•-•-r-•- Raul bcaa-. 1. ^. ' T--Frt73j'osld'Selrover ari -- I r•• I I CU c! •1 • I Existing House zr I Existing i • Driveway el u1 I 0, a I r ,,,./V d-: il 1 %--1 • aI aI w 1 cc 1. Al :I I 0I Existing Shop I • Powerpole IJ > \o £ I • • ^ I'2' I Fire Hydrant(F H) I I II Scale: 'I"=30' i I I I I I I 1 TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer, storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 4 of 4 f# UNITS/ACCT CODES tt REVISIONS Z1pl�� PROTECT GOAD: — ^owlxnrt: FM Zr! x �I ZE EMC ME 1.100 OE DIME.— 011G OF M1ti1P— tlC - .4C — 1 - 1 / r UI 11 , )1" _ , i . ADDRESS o ORDER It ISSUES a E: I SERVICE rem: ' / ASSIGNMENT: I , _ --� TEST- dB N4 ell SPECW ENT: ......1\ r f r� �I MNs %ICIillill r� i M- �gem.,=. - M ji ii 7_ ��11 UNITS/ACCT CODES —4444\ 4110 • • )i _ I- a 16.... �� �"��' ---- REVISIONS / % 1p �/ '-_ I zip, I��I111r{rL i ,� i be nll�l... / 1 :� "— W0908333 12550 SW 6BTH AVE Is �-_1Jf II - `:Y LL® PROJECT — IIUU NIINBEP. W33 Fbllf94E R0.C11V.� _� DAM N.R. PQ R6411 WMLS QM wJffi1L115SI.M.. tam POE- RE: ME: I:567.8 RL.SREt- IRE t OF P PROJECT WO 908333 BBFTP—TIGARD—METRO—E-12550 SW 68TH AVE, PORTLAND/TIRGARD OR j APP 11/16/21 GEOERAL CONSTRUCTION ROLES: CONTACTS: MANY FACULES AND CABLES ARE PITIED FOR IX£AMTY.ALWAYS UIPJZE ALL PERSONAL ENONEERING Date:11/17/2021 PPE.PROVIDE APPROVED TRAFFIC CO41RCL PLAN.ALWAYS GET LOCALES BEFORE ANY MID RUSS TELLS Order:PSR 9399258 ALL DIGGING.ATTESTOR HIGH VOLTAGE OVER ITEM PORES 1LQN'MO E2/TRE LIDIOL 503-843-1001 Circuit ID'.434IKN/723616//NWFC/ AREA. ANY CHANGES OR ADMIIONS NEED TO BE PRE—APPROVED BY LSE LOCAL ,EFF"KEEL Service:Ethernet 1613 ENGINEER.FOLLOW ALL LOCAL AND FEDERAL SAFETY LAMS.MUTE ALL IESING AND 972 249 8968 Customer End User:Cache Valley Electric SAFETY EGUIP.CLEAN RP ANY ROM AREAS BEFORE LEAVING TO ME MOT LOCATION. FACILITES Address:12550 SW 68th Ave-Portland,CM ENSURE GRADE AND 011 C IS REPNIBD.ENSURE THAT ALL REGUPED PERMS ARE ANGELS EOIAUFp Exchange:TGRD/51351 SQUIRED AND ON MAID.UIRJZE ALL MANHOLE PPE AID SAFETY PROCESSES. 503-S43-0390 0A/CO:041/963 INSPECTOR Customer Desired Due Date:12/29/21 DAVE CARNLEY LCON: 971-940-9000 SITE CON=NOR FANDREV SPIJ IG/PLAONC SITE TEL NO=5030316614 DAVE CARNLEY SITE EMAIL=RO6.FANDREY@CVE.COM 971_940-9000 Carrier:Zippy Retail LOCATES Project Manager:Solomon Kasim OREGON 811 DSAT0:2188892 B Existing Capper Terminal:BBTRI T20180 n HOURS Count BBTRI DCG,2301-2345t80,2346413BTRI DC6.2347.2350 L15,m„re BOcnpMrF,ra"k,a PLAONC-1B HOURS POT: N/A ' _ mi.�4 O PLACING FLAGGED 6 HOURS Fiber co,,,,N/A �Las0,T o� "'Ic o-fn N HOURS 2 HOURS CLLI CODE1':TGROORKA wraa-a B Q�SmNr.U.,:. .. Cal GDDE2: UNITS/ACCT CODES Beaverton Facilities Reserve Fiber:RED JUMPER FC2038,331-H1001,64 sit cw,.+i;q' I raw sweet No OSP Work Order:OSP WO Required u�.re C •i,a.e,monza Inflnlum:15946-5 Varasset Ticket:5504207-685/W0908333 ''Amp s OSP please respond with an ECD Date ASAP p me ® Ye,wha.. .,.O Solution: v • a.e.Perwra,e Met,.,... . TSRDOR0A':12550 SW 68th Ave-Portland,OR w' H Locate Mil TOROMH4/61(5W HAMPTON&69TNAVE)and place a 48-fiber 0PK'4C: niw.nawestonv nm9efrrurvmyn S through MN 1/430 and Mil 5/62 and on to pedestal 5I2P5.At MN 4/61 space the t Port.,Cm 48-fiber to the 96-fiber(IPIOd1920)H 1001,64-66.(N1001,64-66 show P emWO i 9 1 D Non Dedicated in DPII 9 1 • At pedestal 512P5 place and splice a 6-port terminal to N1001,60-66 mn Yang Y'•N-rr- portal-porta3.Port al and Porta3 will be a spare.From the terminal portal place 9 sw r.n'^+ nsaes wh a drop to the customer MPOE and tag this fiber. 7 O Test H1001,64 porttlTGRDORKA(S060)EDP-012-09-44 '.' .�a Ln i Summary:RED JUMPER FC2038,331-111001,64TGRDOR0A 15460I FDF-012.09-44 Feeder:PC2038,331 DisRlbution:N/A Place RAD MD and turn-up service. Please contact me with any questions. MATERIALS U I S 1pIG REVISIONS 2422.201 2422.201 SPLICED REARRANGE CLOSURE UG—1 �' SRa u EFIQ.OSBES-1 SU PL ACE ACE ENCLOM E UG-1 U 6 PONT 5O-1 SPLICING PLACE B PORT 50'.1 sillaIG S•LJLE FIBER—6 [ALL BEFORE YOU BIG n-1-1 HITS ONC 72 HORS NOTICE REQUIRED 2422.201 PLACE/PAL INTO DUCT-1,15Y zipJy W0908333 12550 SW 68TH AVE PROJECT ca.k'EA — NUMBER W0908333 ODLCOR'8ND0GN0 BAYRMT: ROL D.65BL0R15 DM R9Rts,12YI)MSPX 1123762I NIX:— RE MO 1.100 IASDElRDi— cow ']—CIF S TM3R— PG — SEC — --0 TGRDORXA H1001 TGRDORXA H1001 FDH 48/432 FDH 48/432 IN:TGRDORXA FC2038,313-330+ IN:TGRDORXA FC2038,313-330+ III 11111 (TGRDORXA FC2038.331+) (PLACE RED STRAP TO TGRDORXA H1001.64+) III Jill I TCRDOR4XBA FC2038.332-336+ TGRDORXA 9ORX FC2038.332-336+ IIII OUT:TGRDORXA H1001,1-432 OUT:TGRDORXA H1001,1-432 hi -48 �IIIU lli IIIII 4" K. r 1 II II TGRDO 10.2006 T15 TGRDORXA H1001,1-26+ III 80,27-29+ UNITS/ACCT CODES TGRDORXA H1001,30-94+ 1 XD,95-96 I _ III Il .III IIIII 1 II ;1ffIIIII I r 111 II ( I 0 II III IIIII REVISIONS I e II '► III I I'T=i-11 JI �,, �II IIIIzi-plyIII 540 70.2006fb1 YJD TCDOXA H7001,1-26+ 80,27-2s+ W090833312550 SW68TH AVE I XD,95—XA H1001,30-94+ i ��, _ _—'----1 — III I li -XD�95-96 �---t� e, PROJECT Icaxu: — _ it 1.4, y W 3 001 WOE-RCTM CRLL KNIS YOU DIG RUM NE r-M.hQ11MB15 MP ,XCRESO EEA AYNIX I f l r III -_ I )2 MIME KIT REWIRED RUMI I:IW rNfp61PJ.T;- p pE p � I (! , „ - ---12 k---- 111 PROP- \ 11 1L1 1 I 1 I jji 111 11 II IIIII , ��I��I I � II If III I I1 I IIIII © Access PED to ------�L_ ---__ 1111 e6zlo.zoo6 I I splice and pull fiber. 0 Y,D 96 II:i1i'I TGRDCRXA H1001,1-26+ n; i 'III III TGRDORXA+H1001,34-76+ ' N IIII I X0,77-90+ 4Ir IIII II XD,91-96 I .� � I II IIII IIII -- J -_ Wall N II II !ill IIII i6 PORT GRDORXA0882302 a TAD FIRER H1001,64 IIII II Jill irTtDORXA H1001,64-66 Lto TO GUSTO TERMINAL.PLACE DROP �1 IXD.1-3+ 'k TO CUSTOMER MPOE pulp IIII WI (PLACE SPLICE ENCLOSURE)I �� II __ I 1111 IIII I I 12550 5W 68ih Ave C I I „ !III III I '. UNITS/ACCT CODES r, I I il'1 111/ //J! I I 48-FI48-FlBER 48 III -- I I XD,1 3+ n I I TGROORXA H1001,Bh86+ II III I — — _. I 0.7—,e I III (PLACE/PULL 1153• IN DUCT) (REARRANGE SPLICE ENCLOSURE) IIII IIII I I (PLACE 100• SLACK IN EACH I4H) II iI (PLACE 50' SLAG IN ST PED) Access MH4/61, i1ll %' I I I II I I II I IIIII , Ci, III I I I I I I I ()IlI REVISIONS e Ii ► ►1 o w _ ► III CALL e6222 YOU DIG I I� NOTICE II III III I —T I I 11 R MUSS A9T1�REWIRED U I III I I 1 I/li I I IIL"L III I I II III I —�� L I IIII o IIIb - HAMPL _=- IIII _ III IIII zippy — - __ ,/ /� I �- i111 __�I'�_- — Af ;, I W091)833312550 SW 68TH AVE — —_=—ter/y. --__: _ — — _ — ;Norm IIIII 1 I P CRT ii% Ii I--�-- � i _� � = TCRD MH 5 62 � F�'I � �m�an w'��x wn I 'I ' ' TGRD MH 4/61 JJ 'i 1 //� " ' Aw'Lmw'reoswertx 1, I I -- I I l ,t L -1:1C0 140BIALC- 5'§ ____ � i, l) ��TG 10000+C12:501-600+ UCAE9-24 C20:326-350+3E6-400+ ENGINEER IIAVE wI AL 2 auu1 OCO:601-200+C12:501-600� 418-5301-13-BOO4 1-160 OCC:1001-1125+701-675+ ,\ UOAE6S-2.1390+1as1-1500 288PB11(1136') C12:1301-1360+1451-1500Y �� H,001:8/-192+2.%D+21�-S62 DCA:401-B00+DCG8T6-9T5 TO MH 230 +22%D $ i O O 6 PORT TERM 500' L10 MX4 200+X1001:]57-]60 MH61 78+25 51p6U 546-0121T64 in T102:26-32+26-82+ PD251W1A B42924 2120+464-5 SW HAMPTON h 68TH AVE 432 • `01796-9M U1 AES28-22 - REV 06/03/14 AC FC2036:1-336+96X0 .1001:1-56+-36 `00 - - MH 61 432 SM ST FC2038:1-406+24X0 4%4246 A U05522-26 _ __ ----__ / QyQ 1� WOOL 6T�e9+M8-286+26xp t0000+03:101-500+ r 11` -, H1161At4M29138421%0 8000D+1101-1200+C12: '(iI) I 1-200+13WD+301-600+ -3 • 166 16:M1-600+not-I500+ 000q -I R66400SM 12:1201-1500 +,$ I - - �s 5p H101-514 +12%0 6 UCAE2B114:1--22005 I - \ Si H cN 1I Q T14:1-26 n'O g C UCAE6-24 '(� I- '� -T OCG]-.4A0 ry CA:601-900+201-300+100DD -' KF 4-21 D U6AE18-24 A .8 0 - 1 3 UNITS/ACCT CODES C201-600+(E:,601-2300+1001p(_ 1 u C2011201-16T5+250U+125,-1E100 11 I. FORIB/6( B 24-'JI _ E uGAE12-24 _ y002 248136(82r) C3:101-500+1101-1200+ [ C12:1-200+301-500+ n + 6 o n00421-22+21-22+ a 6Xp+H1001:331-342+6%D Cc115:1401-1500+C12:1201-130D+ 8 3� ti 1O TD MA'6` 1361-1450 ///��� F p�i2-242wO 1 �s Fo o , 0 0 �5 --....,IT_ i^///��� ^/ O _ ' I G Ck401UGAE4-24 1 • ECAIR 4 _�✓ 3f 7.1. AA CI�:1001�200+ CEAE55101-62222W+20WD - - H T10208 H+600+51-94+SDP+X1-X6 -11+1'+ — J UOAE2-24 r 0 0 0 F CA:1001-1200 • Re N24-91 6 l (J\ 4-SM / � ¢fi-FC2038:403-406+ 11022:1-46 YGD48-9M - (/0T2 L1039:1-24+1600+41-48 RBN24-SM -D \O Y2 %0%1-B+T009:2,-Z2+XO01-20 NA T - J 8 T1009:21-22+X0.23-24 NA KRUSE ESA B —6—p 11- K UGAE28-22DU5 0 I- T14:1-26 - L T14:1UCAE 8 0 - - - 1= L- CA:101-200+020:1201-1615+ REV1510NS c20:1-600+0C:1201-1700+ 1500+1751-1800 M N - (= R- 48R871(400') _ E- H1001:289-330+6ND M C2U 326-S50+3J6-400+ P �\ - 46RBH(141E) 478-500+551-600+7500 (] H1001:217-264 -24 N 10,0 600 -AE106-22 1 AE5106-22 R UNF CB:1801-2400 1101:1-100+51-56 n01:1-100+%1-08 CB:1801BOI-2000 P 2000D24 AE54-22009 S SOPR 10A1 STI1B 12:16-57i68-89+160-195+1600 0 TOD24 SMMX {p+e p RI FAO T 10A1 600PR STUB T1:' .39-V0+8%D IOUT+ V3024-SM DC0:601-1125+T5%) n.� : 9 88r.1 5 TIC .:.)_4+16XD n009:981+25-40+B9D - U DCA:12<f�-4�600NB ziply 0 n009:2X0+25-40+BOD i(lPr NO MH DETAIL FOR STUB PLACEMENT 60046-SM T1009:2431)+25-40+BOO 1N090833312550 SW 68TH AVE � � PRGECT CO WA - NUMBER: W0908333 COMM-RCIONO CALL REHIRE wA1Ww1 GAD n15 e RXA AGSM MIS AR „LE R-1-1 ?OM? FADE..- R WOW[W 1>SOAW01 11-2 HOURS NDIICE REQUIRED BONE 1:100 TRCRCI:- 6NG liti 1 TMOP- i - D 9EC. - TO CO VIA MH61 YGD24-SM T1009:2X0+39-40+8%D IN T1009:2X0+39-40+8XD OUT 0 • UNITS/ACCT CODES 0 0 NH YI LL0 <� 24R8N2r827') rm 6XD+H1001:331-342+6XD sm 3 �YOD24-SM T1009:2X0+39-40+80D T1009:2%D+25-40+800 L4304 MH1 li MH430 80+65 5106TA 7F001CD O 5460 U2SIWIA SW 68TH PKWY REV 06/03/14 JRC • M H 430 REVISIONS 0 O ,g3 DUCT INFO PER 7F001C0 YOD48-SM j 44 T1009:2400+25-40+800 O 1i OA6,1111,11/4 ziply bo fiber TU, W0908333 12550 SW 68TH AVE TO MH431 CALL BEFORE YOU OIG — B-I-I PIDJECT 1�11N1!B�BI1GI�8p3�13�3� IOMLt - T2 NPIRS NOTICE REWIRED NUMB W09081�A1 EXOICQE VIR1C11340 4 CRAM DUE MR famousary 10:03 womMR IVEYEBt PdE- RE: MfBPE BOLE 1:IW 061(t TAM WW1COGI OF B 1909.- Pc - BEG. - CA:2101-2175+250D UGAKF1-24 -0I( ---3 7 DCG 071 70 OCG:1001-1125+701-875+ 12:1301-1350+1451-1500+ DCA:401-600+OCG:878-975 DEAD A. UGAE9-24 AE54-220DS DC0:1201-2400 A - R. UGAE12-24 E T14:1-28 • UGAE528-22 KC:1801-2100+75%D+2176-2399+1 XD C. UGAE6-24 OT1009:33-36+2DD IN v 0 71009:33-36+2DD OUT — DAG:1201-1800 UNITS/ACCT CODES YGD12-SM D. UGAE6-24 24RBN (827') CA:2301-2400 § 6XD+H-1011:331-342+6XD 2 E. UCAE1-24 ° p -I 2 a E. RBN48-SM AES108-22 (H1001:67-69+268-288+2600) O T101:1-100+%1-%B �IfC H1001:68L9+268-288+J851D2+6XD C3 0 O O PEC701 288RBN (1136') 8 C • ~H1001:97-192+24X0+217-362 +22XD E sD ° 31 REVISIONS L10 MH5 T MH62 81+25 4464TA 546-0121784 YGO•B-SM - • - T1009:1-48 UG2SI WI HAMPTON ST. &69TH AYE. 6 PORT TERM 500' REV1 0/21/14JRC 2XD+H1001:357-360 MH 62 Zi(hy fior C , W090833312550 SW 68TH AVE me 0908333 C.O.AG - CALL LiE•iE YOU DIG MI16ER: WVPNJJJ ECKQO:fAROMM A-I-I DMYM211F OAR RG996911 CIY 72 POURS MT ICE REQUIRED IW.✓An RIDIE- 202211112916012211 RE' 9YlE: I:IW iBQ69E1:- DRC A OF A TAW'- )NG - 9L - v ----� No 3 1�0�01011�� I' Single Flagger Operation ....... a. F. for Low Volumes �F (Optional) 7 a W ®©©®:. (ADT<g0D ONE LANEwe a BE 1 f4O� PREPARED 'K �30•3'•3c t• TO STOP �� r IRHILT — — — — — — AR♦ ���'• .,. /K K K KI ,, J.• �.� ! • i1c�°! °L_iw zero •�.u° / V/ C. I ro... ---- IT 2• B 2. B 2. 2. __. 1 mile max. IITI —. • • r• • , — — — — CI • ms+ • • • 6 ••. .>♦ 3• r• S 0 C L B I B I A' Buller ' \ Protection Vehicle ROAD \ w/TMA(both Optional) WORK See Chapter 4 p AHEAD W 111i> C ONE LANE BE PREPARED al n�o TO STOP Two Flagger Operation 3 C d CO w CO �, (Optional) PO co 0 in APM-Z 'aue1-6