Loading...
Permit CITY OF TIGARD MECHANICAL PERMIT a COMMUNITY DEVELOPMENT Permit#: MEC2022-00009 TIGARD 13125 SW Hat Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 1/26/2022 Parcel: 2S 101 BD00300 Jurisdiction: Tigard Site address: 8015 SW HUNZIKER RD Project: Fred Shearer&Sons Subdivision: None Lot: None Project Description: Replace(6)RTU and(1)split unit. Contractor: ALLIANT SYSTEMS LLC Owner: 8015 HUNZIKER LLC 351 NW 12TH AVE 8015 SW HUNZIKER RD PORTLAND, OR 97209 TIGARD, OR 97223 PHONE: 503-619-4000 PHONE: FAX: 503-230-9238 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 01/25/2022 $1,791.99 Class of Work: ALT Type of Const: VB Plan Review 01/25/2022 $448.00 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 01/25/2022 $215.04 Stories: Info Process/Archiving-Lg$2.00(over 01/25/2022 $12.00 11x17) Project Valuation: $67,116.00 Info Process/Archiving-Sm$0.50(up to 01/25/2022 $27.50 11x17) Fuel Air Handlers Fuel Types: Natural Gas Units< 10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: 1 Appliances Vent Fans: Vent Systems: Total $2,494.53 Hoods: Comm Incinerators: Required Items and Reports(Conditions) Woodstoves: Gas Fireplaces: Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: Edgard-a-Ma.L4o-.a.oi.o- Permittee Signature: S.e. atp-14,ca{i vw Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. 0- 1/5 21 Mechanical Permit Application � Foiz oFFlr.'r: USE oNi, City of Tigard �EC >tl// Received O I 2Z °.7' Permit No.tle-/► �0. trMy 111 13125 SW Hall Blvd.,Tigard,OR 97223 Dan V � / Phone: 503.718.2439 Fax: 503.598.1960 d Plan Review Other Permit: e Inspection Line: 503.639.4175 JAN 4:iJ22 Date/By: - I�J 2 T I G A R D Date Ready/By: 1 r• 63 See Page 2 for Internet: www.tigard-or.gov CITY OF rlUaRD N c ed/Method: 167 Supplemental Information E3UILDWG ENVISION I TYPE OF WORK M RCIAit-FEE* SCHEDULE - USE CHECKLIST Mechanical permit fees*are based on the value of the work ❑New construction ®Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit. Value:$ 67,116 CATEGORY OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES* ❑ 1-and 2-family dwelling ®Commercial/industrial 0 Accessory building For special information use checklist. ❑Multi-family ❑Master builder ❑Other: Description Qty. Ea. Total JOB SITE INFORMATION AND LOCATION Heating/cooling: Air conditioning 46.75 Job site address: 8015 SW Hunziker Rd Fumace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: Tigard, OR 97223 Fumace 100,000+BTU(ducts/vents) 54.91 Heat pump 61.06 Suite/bldg./apt.no.: I Project name: RTU Replacement Duct work 23.32 Cross street/directions to job site: SW Hunziker& SW Wall St Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: I Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK Gas fireplace/insert 33.39 Flue vent for water heater or gas Replace RTU 1-6, and 1 split unit fireplace 23.32 Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 Other: 23.32 ® PROPERTY OWNER I ❑ TENANT Environmental exhaust and ventilation: Name: Fred Shearer and Sons Range hood/other kitchen — equipment 33.39 Address:8015 SW Hunziker Street Clothes dryer exhaust 33.39 City/State/ZIP: Tigard, OR 97223 Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:( 503)520-9991 Fax:( ) Attic/crawlspace fans 23.32 0 APPLICANT 0 CONTACT PERSON Other: 23.32 Business name: Alliant Systems Fuel piping: $14.15 for first four;$4.03 for each additional Contact name: Furnace,etc. Address: 351 NW 12th Ave Gas heat pump Wall/suspended/unit heater City/State/ZIP: Portland, OR 97209 Water heater Phone:(503)619-4000 Fax: :( ) Fireplace Range F:-mail:permits@alliant-systems.com Barbecue CONTRACTOR Clothes dryer(gas) Other: Alliant Systems Business name: MECHANICAL PERMIT FEES* Address: 351 NW 12th Ave Subtotal City/State/ZIP: Portland, OR 97209 Minimum permit fee($90.00) Plan review(25%of permit fee) Phone:(5j03)619-4000 Fax:( ) State surcharge(12%of permit fee) CCB lie.:153420 TOTAL PERMIT FEE This permit application expires if a permit is not obtained within 180 Digitally signed by Deb Han days after it has been accepted as complete.n ON:C=U5,E=dhenn.ii.ntwy.t.m. m,O=Nliant Authorized signature: e a 1 1 syrm.,CN=D.b Hm . Fee methodology set by Tri-County Building Industry Service Board D.U.2021.12.21 0939:15-0e.00' Print name: Deb Han Date: 12/21/2021 I•\Building\Permits\MEC_PermitApp_040113.doc 440-4617T(11/02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial & Multi-Family Fee Schedule: Total Valuation: Permit Fee: $0.00 to$500.00 Minimum fee$69.06 $500.01 to$5,000.00 $69.06 for the first$500.00 and $3.07 for each additional$100.00 or fraction thereof,to and including $5,000.00. $5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and $2.81 for each additional$100.00 or fraction thereof,to and including $10,000.00. $10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and $2.54 for each additional$100.00 or fraction thereof,to and including $50,000.00. $50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and $2.49 for each additional$100.00 or fraction thereof,to and including $100,000.00. $100,000.01 and up $2,608.71 for the first$100,000.00 and $2.92 for each additional$100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. I`\Building\Permits\MEC_PermitApp_040113.doc 2 City of Tigard III in COMMUNITY DEVELOPMENT DEPARTMENT 11 T 1 G lz o Building Permit Review — Commercial - No Land Use Building Permit #: Site Address: to l 5 IV(/i, i r K2. Suite/Bldg#: Project Name: (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review ' / Proposal: �p�,(,(,,e� 5 i u, ( ) �-�rW , -C V 1i �� ,�-- t iAt (i2) Sp f`-u-t4 1/- Existing Business Activity: FV SG�� 50 t/1.9 Proposed Business Activity: Verify site address/suite#exists and active in permit system. ❑ River Terrace Neighborhood: ❑ Yes II No ►7# Zoning: : —L (�( Permitted Use: ,® Yes ❑ No ❑ Spec Space Confirm no land use required. 9 Business License: Exists: iz) Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: Date: I /1.4 22 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: Site Plans: # Z Building Plans: # 2, Building Permit#: []--Enter building permit#above. Workflow Routing: [ Planning ❑ Permit Coordinator [WBuilding Workflow Sign-off: 0� .S'gn-off for Planning(include notes from planning review) L7 Route Application Documents: Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: -%% Date: P/A911,2.__ 1:\Building\Forms\BldgPermitRvw_COM NoLandUse_l11819.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit ❑ Approved, NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: • Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: O SDC Fees Entered: Wash Co Trans Dev Tax: 0 Yes 0 N/A Tigard Trans SDC: - 0 Yes 0 N/A Parks SDC: 0 Yes 0 N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Forms\BIdgPermitRvw_COM NoLandUse_111819.docx