Loading...
Permit CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2022-00009 Date Issued: 1/26/2022 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S113A600701 Jurisdiction: Tigard Site address: 16145 SW UPPER BOONES FERRY RD Project: Kiddie Academy Subdivision: CIRCUIT PARTITION Lot: 2 Project Description: Install(1)illuminate wall SIGN B"Kiddie Academy" Contractor: RAMSAY SIGNS INC Owner: KALVI LLC 9160 SE 74TH AVE BY MURUGAPPAN, PRABAKAR PORTLAND, OR 97206 8821 NW SAVOY LN PORTLAND, OR 97229 PHONE: 503-777-4555 PHONE: FAX: 503-777-0220 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 01/26/2022 $119.33 Occupancy Grp: U Occupancy Load: 0 Demolition 12%State Surcharge-Building 01/26/2022 $14.32 Dwelling Units: 0 Plan Review 01/18/2022 $77.56 Stories: 0 Height: 0 ft Info Process/Archiving-Sm$0.50(up to 01/26/2022 $1.50 Bedrooms: 0 Bathrooms: 0 11x17) Value: $2,500 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $212.71 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance. or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Edga.rol o-M - Permittee Signature: St-e- Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. ' Building Permit Application Commercial rCE\b1; F FOR OFFICE USE ONLY City of Tigard Received �j�/II /, Permit No.W�/ P2022r 0009 � ' 13125 SW Hall Blvd.,Tigard,OR 97223 iAN 1 3 20Z2 Plan Date/By:Review /9 ZQ22 � C Phone: 503-718-2439 Fax: 503-598-1960, Date/By '-01 -al. -4 Related Permit: l 1 G A R D Inspection Line: 503-639 4175 CITY C Ii:GARD Date Ready/By: / �j i ...a.,- I ® See Page 2 for Internet: www.tigard-or.gov �p` t� q +CVfs�4 No' edMethod: D�/' 1 L�/•�•/' Supplemental Information TYPE OF WORK BUILDING 1/ REQUIRED DATA:1-AND 2-FAMILY DWELLING IQ New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. 0 1-and 2-family dwelling ria Commercial/industrial Valuation: $ ❑Accessory building El Multi-familyNumber of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 16145 SW Upper Boones Ferry Rd New dwelling area: square feet City/State/ZIP: Tigard,OR 97224 Garage/carport area: square feet ,1 Suite/bldg./apt.4: Project name: Kiddie Academy Covered porch area: square feet Cross street/directions to job site: SW Upper Boones Ferry Rd&SW Durham Rd Deck area: square feet i 4 Other structure area: square feet l { REQUIRED DATA:COMMERCIAL-USE CHECKLIST 7 Subdivision: CPO 4M METZGER I Lot#: W482205 Permit fees*are based on the value of the work performed. Tax map/parcel#: 2S113AB00701 / R2214132 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. f Install(1)illuminate wall SIGN B"Kiddie Academy" Valuation: $ 2,500 i 'ZIIP Ws. Existing building area: square feet New building area: square feet ❑ PROPERTY OWNER ® TENANT Number of stories: Name: Kalvi LLC Type of construction: SIGNAGE Address: 8821 NW Savoy Ln Occupancy groups: City/State/ZIP: Portland,OR 97229 Existing: Phone:( ) Fax:( ) New: ® APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: Ramsay Signs Structural plan review fee(or deposit): + Contact name: Chris Slovick FLS plan review fee(if applicable): Address: 9160 SE 74th Ave City/State/ZIP: Portland,OR 97206 Total fees due upon application: 971-334-3033503-961-7784 Amount received: Phone:( ) Fax: :( ) PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* E-mail: permits@ramsaysigns.com Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photovoltaic Solar Panel System. Business name: Ramsay Signs Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 9160 SE 74th Ave Solar Installation Specialty Code checklist. City/State/ZIP: Portland,OR 97206 Permit fee(includes plan review $180.00 and administrative fees): Phone:( ) 971-334-3033 Fax:( ) 503-961-7784 State surcharge(12%of permit fee): $21.60 CCB Lie.: 63422 /J Total fee due upon application: $201.60 Authorized signature: ��^/JLed- �L19.//, � This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Chris Slovick Date: 12.23.21 * Fee methodology set by Tri-County Building Industry Service Board. 1:\Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, 0 excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 0 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: 0 (a) Parking $ (b) An accessible entrance: $ 0 (c) An accessible route to the altered area: $ 0 (d) At least one accessible restroom for each sex or a single unisex 0 restroom: $ (e) Accessible telephones: $ 00 (f) Accessible drinking fountains:and, $ 0 (g) When possible,additional accessible elements such as storage and 0 alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ 0 I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 • • City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional,drawn to scale and labeled with: A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number 0 zoning 0 applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the"Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans,details and specifications. J. Accessibility barrier removal worksheet. K. Deposit-based on valuation of project. I:\Building\Pezmrts\BUP_COM_PernutApp.doc Rev.03/05/2019 • e City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 1/11 S " Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal #of Plans (Includes new,additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage 1 of all buildings to be demolished,erosion control plan and tree protection,if applicable) ( Site Work 3 (must include location of all accessible parking) Plumbing(site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing(building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor,City of Tigard,Washington County,and Tualatin Valley Fire&Rescue),if applicable. ¢ tpf tt I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 r f