Loading...
Permit INg CITY OF TIGARD MASTER PERMIT s COMMUNITY DEVELOPMENT Permit#: MST2022-00021 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 02/02/2022 Parcel: 2S112BD07500 Jurisdiction: Tigard Site address: 7894 SW HANSEN LN Subdivision: BRITTANY MEADOWS Lot: 11 Project: Nielsen Project Description: Rooftop Solar PV 10.4 kW BUILDING Floor Areas Required Setbacks Required Stones: 0 Bedrooms: 0 First: 0 sf Basement. 0 sf Left: 0 Parking Spaces. 0 Height: 0 Bathrooms: 0 Second: 0 sf Garage: 0 sf Front: 0 Smoke Dwelling Units: 0 Third: 0 sf Right: 0 Detectors: Total: 0 sf Value: $5,782.00 Rear: 0 PLUMBING Sinks: 0 Water Closets: 0 Washing Mach: 0 Laundry Trays: 0 Rain Drain: 0 Urinals: 0 Lavatories: 0 Dishwashers: 0 Floor Drains: 0 Sewer Lines: 0 SF Rain Drains: 0 Storm Sewer: 0 Tubs/Showers: 0 Garbage Disp: 0 Water Heaters: 0 Water Lines: 0 Catch Basins: 0 Bckflw Prevntr: 0 Footing Drain: 0 Ice Maker 0 Hose Bib: 0 Backwater Value: 0 Drywell-Trench Drain: 0 Other Fixtures: 0 Other Fixture Units: MECHANICAL Fuel Types Air Conditioning: N Vent Fans: 0 Clothes Dryers: 0 Heat Pump: N Hoods: 0 Other Units: 0 Furn<100K: 0 Vents: 0 Woodstoves: 0 Gas Outlets: 0 Furn>=100K: 0 ELECTRICAL Residential Unit Service Feeder Temp Srvc!Feeders Branch Circuits 1000 sf or less: 0 0-200 amp: 0 0-200 amp: 0 W/Svc or Fdr 0 Ea add'I 500 sf: 0 201-400 amp: 0 201-400 amp: 0 W/O Svc/Fdr 0 Mfd Home/Feeder/Svc: 0 401-600 amp: 0 401-600 amp: 0 601-1000 amp: 0 601+amp-1000v: 0 1000+amp/volt: 0 ELECTRICAL-RESTRICTED ENERGY SF Residential Audio&Stereo: N HVAC: N Security Alarm: N Vaccuum System: N Garage Opener: N All P Roof TopSolar PV System 10.4 kW Ecom g N Other: Y Other Description: Y pasin BUILDING INFO Class of Work: Type of Use: Type of Constr: Occupancy Group: Square Feet: OTR SF VB R-3 0 Owner: Contractor: NIELSEN,MARK D&MARY L BRS FIELD OPS LLC Required Items and Reports(Conditions) 7894 SW HANSEN LN 1403 NORTH RESEARCH WAY TIGARD,OR 97224 OREM,UT 84097 PHONE: PHONE: 855-205-2530 FAX: Total Fees: $363.19 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR os9-nnl-nnln thrn1 inh CIA oS9-M1_nnon Vnii may nhhin a rnnv of the niloc nr eiir<rt ni foefinne to(ll IAIr`by Tallinn Sn4 9'39 10A7 nr 1 Ann''19 7 4A Issued By: Ec o-roto-M�dO" a Permittee Signature: S� Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Applieatiolr�� V 1� ®ED 7 Residential °� FOR OFFICE USE ONLY City of Tigard JAN 17 2022 Received Ai 2c tit L , PermitNo �„C 2 A7C/l2 "� 13125 SW Hall Blvd.,Tigard,OR 97223 - Date/By: �l�J g y Plan Review ,(/^i/,1 a ��Y ilh �F I��A��j/r/ L/ Aok Other Permit: Phone: 503.718.2439 Fax: 503.598.19 Date/By: ..flt hitl7 Inspection Line: 503.639.4175 lUILDING DIVISION Date Ready/By / a ® See Page 2for Internet: www.tigard-or.gov tined/Method: !3i ( - Supplemental Information _ TYPE OF WORK R:Q II ED TA:I-AND 2-FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the r CATF.GORY OF CONS'FRUCT ION work indicated on this application. ❑ I-and 2-family dwelling Valuation: $ 5782.40 ❑Commercial/industrial ❑Accessory building ❑Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 7894 Southwest Hansen Lane, Portland,Oregon, 97224 New dwelling area: square feet City/State/ZIP: Garage/carport area: square feet Suite/bldg./apt.no.: Project name: Mark Nielsen Covered porch area: square feet Cross street/directions to job site: Deck area: square feet 1 1 Other structure area: square feet z Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Rooftop Solar PV 1 p (4 1193/' Valuation: $ Existing building area: square feet New building area: square feet ' PROPERTY OWNER ❑ TENANT Number of stories: Name: Mark Nielsen Type of construction: Address: 7894 Southwest Hansen Lane, Portland,Oregon,97224 Occupancy groups: City/State/ZIP: Existing: Phone:( ) I'ax:( ) New: ❑ APPLICANT flit CONTACT PERSON BUILDING PERMIT FEES* Business name: BRS Field Ops,LLC (Please:refer Ya lee schedule) Structural plan review fee(or deposit): Contact name: Jeffrey Lee - FLS plan review fee(if applicable): Address: 1403 N Research Way ----------- City/State/ZIP: Orem,UT 84097 Total fees due upon application: Amount received: Phone:( 385)482-0045 Fax: :( ) PHOTOVOLTAIC SOLARPT. L SYSTEM FEES* [-mail: permitting.deparment@biueravensolarcom If Commercial and residential prescriptive installation of ` CONTRACTOR -f roof-top mounted Photovoltaic Solar Panel System. Business name: BRS Field Ops,LLC Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 1403 N Research Way Solar Installation Specialty Code checklist. City/State/ZIP: Orem,UT 84097 Permit Fee(includes plan review $180.00 and administrative fees): Phone:( 385)482-0045 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lie.: 227185 / Total fee due upon application: $201.60 Authorized signature: ,// This permit application expires if a permit is not obtained • 1166' within 180 days after it has been accepted as complete. Print name: Jeffrey Lee Date: 01 /14/2022 *Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP-RESPermitApp.doc 02/24/2011 440-46I3T(I1/02/COM/WEB) Electrical Permit Applicatiol ECEIVE FOR OFFICE USE ONLY Received City of Tigard Date/By: Permit#: 12O22-a Q2.I II 13125 SW Hall Blvd.,Tigard,OR 97223 JAN 17 2022 Plan Review Phone: 503.718.2439 Fax: 503.598.1960 Date/By: Related Permit#: Inspection Line: 503.639.4175 611-Y OF TIGAHL Ready Date/By: .[uric: ® See Page 2 for "UM`D Internet: www.tigard-or.gov Notified/Method: Supplemental Information U ► I A►I ❑New construction 0 Addition/alteration/replacement Please check all that apply(submit 2 sets of plans w/items checked): 0 Service or feeder 400 amps or more 0 Building over three stories. ❑Demolition ❑Other: where the available fault current 0 Marinas and boatyards. ` CATEGORY OF CONSTRUCTI f)' exceeds 10,000 amps at 150 volts or 0 Floating buildings. less to ground,or exceeds 14,000 0 Commercial-use agricultural ElI-and 2-family dwelling ❑Commercial,industrial ❑Accessory building amps for all other installations. buildings. ❑ Multi-family ❑Master builder ❑Other: 0 Fire pump. 0 Installation of 150 KVA or JOB SITE INFORMATION AND LOCATION ' 0 Emergency system. larger separately derived ❑Addition of new motor load of system. Job#: I Job site address: 7894 Southwest Hansen Lane, Portland, OregoIj 2., 4ore. ❑`A", `E", l-r','I-3", City/State/ZIP: 0 Six or more residential units. occupancy. 0 Health-care facilities. ❑Recreational vehicle parks. Suite/bldg./apt.#: I Project name: Mark Nielsen 0 Hazardous locations. 0 Supply voltage for more than 0 Service or feeder 600 amps or more. 600 volts nominal. Cross street/directions to job site: ;>,` Description Qty. EachTotal New residential single-or multi-family dwelling unit. Subdivision: I Lot#: Includes attached garage. 1,000 sq.ft.or less 168.54 4 Tax map/parcel#: Ea.add'I 500 sq.ft.or portion 33.92 1 , t Limited energy,residential Rooftop Solar PV (with above sq.ft.) 75.00 2 Limited energy,multi-family 75.00 2 residential(with above sq.ft.) Renewable Energy 0 See Page 2 Services or feeders installation,alteration,and/or relocation Name: Mark Nielsen 200 amps or less 100.70 2 Address: 7894 Southwest Hansen Lane,Portland,Oregon,97224 201 amps to 400 amps 133.56 2 401 amps to 600 amps 200.34 2 City/State/ZIP: 601 amps to 1,000 amps 301.04 2 Phone:( ) I Fax:( ) Over 1,000 amps or volts 552.26 2 Temporary services or feeders installation,alteration,and/or Email: relocation Owner installation:This installation is being made on property that I own which is not 200 amps or less 59.36 1 intended for sale,lease,rent,or exchange,according to ORS 447,449,670,and 701. 201 amps to 400 amps 125.08 2 Owner signature: Date: 401 amps to 599 amps 168.54 2 Branch circuits—new,alteration,or extension,per panel '-`f A.Fee for branch circuits with Business name: BRS Field Ops,LLC above service or feeder fee, 7.42 2 each branch circuit Contact name: Jeffrey Lee B.Fee for branch circuits without serAddress: 1403 N Research Way branchce it feederitfee,first 56.18 2 branch circuit City/State/ZIP: Orem,UT 84097 Each add'l branch circuit 7.42 2 Miscellaneous(service or feeder not included) Phone:( 385)482-0045 I Fax: :( ) Each manufactured or modular dwelling,service and/or feeder 67.84 2 Email: permitting.department@blueravensolar.com Reconnect only 67.84 2 .,`° 3 ` Pump or irrigation circle 67.84 2 Business name: BRS Field Ops, LLC Sign or outline lighting 67.84 2 Signal circuit(s)or limited-energy ID See Page 2 2 Address: 1403 N Research Way panel,alteration,or extension. City/State/ZIP: Orem, UT 84097 Each additional inspection over allowable in any of the above Additional inspection(1 hr min) 66.25/hr Phone:( 385) 482-0045 Fax:( ) Investigation(1 hr min) 90.00/hr Email: permitting.department@blueravensolar.com Industrial plant(1 hr min) 78.18/hr Inspections for which no fee is 90.00/hr CCB Lic.: 227185 Electrical Lc.: Cl493 Suprv.Lic.: 6394S s. cifically listed(/2 hr min) ��. _ ELECTRICAL PERMIT FEES Suprv.Electrician signature,required: t/ :' _ Subtotal: Print name: Shan Whittaker Date: 01 / 14/2022 0 Plan Review Required(25%ofpermit fee): AOState surcharge(12%of permit fee): Authorized signature: i# �, TOTAL PERMIT FEE: / ice' This permit application expires if a permit is not obtained within 180 Print name: Jeffrey L Date: 01 /14/2022 days after it has been accepted as complete. * Number of inspections allowed per permit. I:\Building\Permits\ELC_PermitApp_ELR_ERE.doc Rev 06/17/2015 440-46I5T(I I/05/COM/WEB Electrical Permit Application —City of Tigard Page 2—Supplemental Information Limited Energy Permit Fees: Renewable Energy Permit Fees: a C s s qE°d vv to � � „A r: z5 �' Description Qty. Each Total Fee for all residential systems combined: $75.00 Renewable electrical energy systems: 5 kva or less 100.70 2 Check Type of Work Involved: 5.01 to 15 kva 1 133.56 2 ❑ Audio and Stereo Systems* 15.01 to 25 kva 200.34 2 Wind generation systems in excess of 25 kva: ❑ B• urglar Alarm 25.01 to 50 kva 301.04 2 50.01 to 100 kva 552.26 2 Garage Door Opener* >100 kva(fee in accordance with OAR 918-309-0040) 552.26 2 n H• eating, Ventilation and Air Conditioning Solar generation systems in excess of 25 kva: System* Each additional kva over 25 7.42 3 n V• acuum Systems* >100 kva—no additional charge 0.0 3 Each additional inspection over allowable in any of the above: Li Other. Each additional inspection is 66.25/hr 1 charged at an hourly(1 hr min) Inspections for which no fee is 90.00/hr s.-cificall listed('/2 hr min Subtotal(Enter on Page 1): Fee for each commercial system: $75.00 * Number of inspections allowed per permit. (SEE OAR 918-309-0000) Check Type of Work Involved: ❑ Audio and Stereo Systems ❑ Boiler Controls ❑ Clock Systems ❑ Data Telecommunication Installation n F• ire Alarm Installation ❑ HVAC ❑ Instrumentation Intercom and Paging Systems ❑ Landscape Irrigation Control* ❑ Medical ❑ Nurse Calls I I Outdoor Landscape Lighting* Protective Signaling n O• ther: Total number of commercial systems: *No licenses are required. Licenses are required for all other installations I:\Building\Permits\ELC_PermitApp_ELR_ERE.doe Rev 06/17/2015