Loading...
Permit CITY OF TIGARD SITE WORK PERMIT 1' COMMUNITY DEVELOPMENT Permit#: SIT2022-00006 Date Issued: 3/7/2022 T[GAR D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S102CB07400 Jurisdiction: Tigard Site address: 10470 SW PARK ST Project: Middleton Trust Building Subdivision: 1998-084 PARTITION PLAT Lot: 2 Project Description: Site work for a new 4,000 sq.ft.office/warehouse building with(10)parking spaces and site improvements. Contractor: BRUNER PLUMBING Owner: MIDDLETON HOLDINGS LLC PO BOX 23985 PO BOX 23985 TIGARD, OR 97281 TIGARD, OR 97281 PHONE: 503-484-5105(CELL) PHONE: FAX: 503-624-2173 FEES Description Date Amount Specifics: Permit Fee-Site Work 03/07/2022 $2,021.72 Plan Review 02/24/2022 $1,314.12 Type of Use: COM 12%State Surcharge-Building 03/07/2022 $242,61 Class of Work: NEW Info Process/Archiving-Lg$2.00(over 03/07/2022 $24.00 117) Project Valuation: Erosion$370,000.00 Erosion Control w/Development 03/07/2022 $386.40 Site Specifics: Excavation Volume: 1600 cu.yd. Fill Volume: 480 cu.yd. Impervious Surface: 8200 sq.ft. Engineered Fill: No Soil Report Required: Yes Paving: Yes Grading: Yes Landscaping: Yes Site Prep: No Storn Drains: Retaining Wall: Yes Fire Underground: No Accessible Parking: Yes Fence: No Total $3,988.85I Required Items and Reports(Conditions) 1 Ersn Cntrl 503-639-4175 2 Special Inspection(see plans) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: ... Permittee Signature: Ca 1503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. City of Tigard a COMMUNITY DEVELOPMENT DEPARTMENT , . 111 T7GARD Building Permit Review — Commercial - With Land Use Building Permit #: -e9z})-)...[' X.e Site Address: 10 Li 1 D SW Parma St-. Suite/Bldg#: Project Name: ltlddle'roh Th( \- Nd l . (Name of commercial business occupying the Woace. If vacant,enter Spec Space.) Planning Review Proposal: S tie. W0A- Z'Verify site address/suite# exists and active in permit system. f Z'River Terrace Neighborhood: ❑ Yes (I No Land Use Case #: Sp 9-2o W-c cooG4. Plans Match Approved Land Use: , gr-Site Plan 4'} Landscape Plan Other: I hrhwj Urban Forestry Plan 'v- Elevation Plan J J Building Height: Maximum Height Actual Height yr Conditions Met: rkr Prior to Submittal ❑ 'rior to Permit Issuance 1J'l; Business License: Exists: ❑ Yes ❑ No,applicant was provided a business license application Public Facilities Improvement(PFI)Permit: Required: Yes, applicant was notified El No Applied For: %Yes 0 No, stop intake Notes: Approved by Planning: tin.712L, Date: zI 1 i 12022 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: 0 Approved D Not Approved W. Building Permit Submittal Original Submittal Date: c'Y laa, Site Plans: # , / Building Plans: # 3 Building Permit#: 0.-Effer building permit#above. Workflow Routing: R-Pfanning ii'g1neering Z-PrriffirCoordinator ceding Workflow Sign-off 0.51gn-off for Planning(include notes from planning review) Route Application Documents: GLBtlIlding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: 2yn. I:\Building\Fonnsl6ldgPennitRvw COM WithLandUse 111819.docx Engineering Review [ lope at building pad: Permit#: QFt Zp2I -o61�3 E....-Conditions "Met"prior to issuance of building permit 12'E cements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) 2 Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes C \To Assess Water Quantity Fee in-lieu: ❑ Yes a-No LIDA Facility on lot: ❑ Yes 2-go Add Fee: 0 Yes 0 No 0 NOT Approved by Engineering: Date Notes: Approved by Engineering: )4, Date: a-a q-702 Z Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review Conditions "Met"prior to issuance of building permit 0 Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: 0 Yes /N/A Tigard Trans SDC: 0 Yes �N/A Parks SDC: 0 Yes K/N/A LIDA Fee: ❑ Yes N/A OK to Issue Permit Approved by Permit Coordinator: AKJ, Date: 2.12! (ZD22 I:\Building\Forms\BldgPermitRvw_COM_WithLandUse_111819.docx