Loading...
Report (2) mw2u2z,- 000(01 k 0,5 i@" fps SUBMITTAL = i Cognex Space Reconfiguration r. ASTRUCTIUN ,, ��'�. � Ell i''.. ('i'.a i_1o'.if: 1, 'v Project: 41360- Cognex Space Reconfiguration Spec Section Num: 15865 SW 74th Avenue, #105 Submittal#: 1 Tigard, OR 97224 Revision#: 0 Date: 1/11/2022 UTC Submittal Title: Mechanical Submittal Detail: Response Due By: 1117/2022 UTC Contractor: PERLO CONSTRUCTION HAS REVIEWED THIS SUBMITTAL Russell Emmerson DATE 1/11/2022 UTC SIGNED Russell Emmerson Perlo Construction REVIEW BY CONTRACTOR IS UNDERTAKEN SOLELY TO SATISFY ANY OBLIGATIONS OF CONTRACTOR TO OWNER AND DOES NOT IN ANY WAY RELIEVE SUBCONTRACTOR FROM HIS OBLIGATION FULLY TO PERFORM ALL SUBCONTRACT REQUIREMENTS,NOR SHALL SUCH REVIEW GIVE RISE TO ANY RIGHT OF ACTION OR SUIT IN FAVOR OF SUBCONTRACTOR OR THIRD PERSONS AGAINST CONTRACTOR. REVIEW DOES NOT EXTEND TO CONSIDERATION FOR STRUCTURAL INTEGRITY,SAFETY, DETAILED COMPLIANCE WITH CONTRACT REQUIREMENTS OR ANY OTHER OBLIGATION OF THE SUBCONTRACTOR. SUBCONTRACTOR IS FULLY RESPONSIBLE FOR CONFIRMING AND CORRELATING ALL DIMENSIONS; FABRICATING AND CONSTRUCTION TECHNIQUES; COORDINATING HIS WORK WITH THAT OF ALL OTHER TRADES;AND THE SATISFACTORY PERFORMANCE OF HIS ENTIRE WORK IN STRICT ACCORDANCE WITH THE .CONTRACT DOCUMENTS. Architect: Approver's Stamp Sabine O'Halloran Mildren Desi n Grou P.C. These deferred submittal documents have been reviewed and g p, been found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the design and submittal.docoments have been approved by the building official.This review is for general conformance with design concept only. Any deviation from plans or specrficabons not clearly noted by the contractor has not been reviewed Review shall not constitute a complete check of all detailed dimensions or count or serve to relieve the contractor of contractual responsibility for any error or deviation from the contract requirements. Msm'EN DEsra Date.01-17-2022 Grtan Reviewed bw SOH Response: Comment: Page 1 of 12 � 4 MSUBMITTAL 4� - Cognex Space Reconfiguration INSTRUCTION Project: 41360- Cognex Space Reconfiguration Spec Section Num: 15865 SW 74th Avenue, #105 Submittal#: 1 Tigard, OR 97224 Revision#: 0 Date: 1/11/2022 UTC Submittal Title: Mechanical Submittal Detail: Response Due By: 1/17/2022 UTC Contractor: PERLO CONSTRUCTION HAS REVIEWED THIS SUBMITTAL Russell Emmerson DATE 1/11/2022 UTC SIGNED Russell Emmerson Perlo Construction REVIEW BY CONTRACTOR IS UNDERTAKEN SOLELY TO SATISFY ANY OBLIGATIONS OF CONTRACTOR TO OWNER AND DOES NOT IN ANY WAY RELIEVE SUBCONTRACTOR FROM HIS OBLIGATION FULLY TO PERFORM ALL SUBCONTRACT REQUIREMENTS, NOR SHALL SUCH REVIEW GIVE RISE TO ANY RIGHT OF ACTION OR SUIT IN FAVOR OF SUBCONTRACTOR OR THIRD PERSONS AGAINST CONTRACTOR. REVIEW DOES NOT EXTEND TO CONSIDERATION FOR STRUCTURAL INTEGRITY,SAFETY, DETAILED COMPLIANCE WITH CONTRACT REQUIREMENTS OR ANY OTHER OBLIGATION OF THE SUBCONTRACTOR. SUBCONTRACTOR IS FULLY RESPONSIBLE FOR CONFIRMING AND CORRELATING ALL DIMENSIONS; FABRICATING AND CONSTRUCTION TECHNIQUES; COORDINATING HIS WORK WITH THAT OF ALL OTHER TRADES;AND THE SATISFACTORY PERFORMANCE OF HIS ENTIRE WORK IN STRICT ACCORDANCE WITH THE ,CONTRACT DOCUMENTS. Architect: Approver's Stamp Sabine O'Halloran P.C. These deferred submittal documents have been reviewed and Mildren Design Group, Vbeen found to be in general conformance to the design of the building. The defamed submittal items shall not be installed until the design and submittal documents have been approved try the building official.This review is for general conformance with design concept only. Any deviation from plans or specifications not clearly noted by the contractor has not been reviewed.Review shall not conshlute a complete check of all detailed dimensions or count or serve to relieve the contractor of contractual responsibility for any error or deviation from the contract requirements. miu� DEaue Date 01-17-2022 6sow Reviewed bv:SOH Response: Comment: Page I of 12