Cognex Space Reconfiguration r.
ASTRUCTIUN ,, ��'�. �
Ell i''.. ('i'.a i_1o'.if: 1, 'v
Project: 41360-
Cognex Space Reconfiguration Spec Section Num:
15865 SW 74th Avenue, #105 Submittal#: 1
Tigard, OR 97224 Revision#: 0
Date: 1/11/2022 UTC
Submittal Title: Mechanical
Submittal Detail:
Response Due By: 1117/2022 UTC
Contractor: PERLO CONSTRUCTION HAS REVIEWED THIS SUBMITTAL
Russell Emmerson DATE 1/11/2022 UTC SIGNED Russell Emmerson
Perlo Construction
REVIEW BY CONTRACTOR IS UNDERTAKEN SOLELY TO
SATISFY ANY OBLIGATIONS OF CONTRACTOR TO OWNER
AND DOES NOT IN ANY WAY RELIEVE SUBCONTRACTOR
FROM HIS OBLIGATION FULLY TO PERFORM ALL
SUBCONTRACT REQUIREMENTS,NOR SHALL SUCH REVIEW
GIVE RISE TO ANY RIGHT OF ACTION OR SUIT IN FAVOR OF
SUBCONTRACTOR OR THIRD PERSONS AGAINST
CONTRACTOR. REVIEW DOES NOT EXTEND TO
CONSIDERATION FOR STRUCTURAL INTEGRITY,SAFETY,
DETAILED COMPLIANCE WITH CONTRACT REQUIREMENTS
OR ANY OTHER OBLIGATION OF THE SUBCONTRACTOR.
SUBCONTRACTOR IS FULLY RESPONSIBLE
FOR CONFIRMING AND CORRELATING ALL DIMENSIONS;
FABRICATING AND CONSTRUCTION TECHNIQUES;
COORDINATING HIS WORK WITH THAT OF ALL OTHER
TRADES;AND THE SATISFACTORY PERFORMANCE OF HIS
ENTIRE WORK IN STRICT ACCORDANCE WITH THE
.CONTRACT DOCUMENTS.
Architect: Approver's Stamp
Sabine O'Halloran
Mildren Desi n Grou P.C. These deferred submittal documents have been reviewed and
g p, been found to be in general conformance to the design of the
building. The deferred submittal items shall not be installed
until the design and submittal.docoments have been approved
by the building official.This review is for general conformance
with design concept only. Any deviation from plans or
specrficabons not clearly noted by the contractor has not been
reviewed Review shall not constitute a complete check of all
detailed dimensions or count or serve to relieve the contractor
of contractual responsibility for any error or deviation from the
contract requirements. Msm'EN
DEsra
Date.01-17-2022 Grtan
Reviewed bw SOH
Response:
Comment:
Page 1 of 12
� 4
MSUBMITTAL 4� -
Cognex Space Reconfiguration
INSTRUCTION
Project: 41360-
Cognex Space Reconfiguration Spec Section Num:
15865 SW 74th Avenue, #105 Submittal#: 1
Tigard, OR 97224 Revision#: 0
Date: 1/11/2022 UTC
Submittal Title: Mechanical
Submittal Detail:
Response Due By: 1/17/2022 UTC
Contractor: PERLO CONSTRUCTION HAS REVIEWED THIS SUBMITTAL
Russell Emmerson DATE 1/11/2022 UTC SIGNED Russell Emmerson
Perlo Construction
REVIEW BY CONTRACTOR IS UNDERTAKEN SOLELY TO
SATISFY ANY OBLIGATIONS OF CONTRACTOR TO OWNER
AND DOES NOT IN ANY WAY RELIEVE SUBCONTRACTOR
FROM HIS OBLIGATION FULLY TO PERFORM ALL
SUBCONTRACT REQUIREMENTS, NOR SHALL SUCH REVIEW
GIVE RISE TO ANY RIGHT OF ACTION OR SUIT IN FAVOR OF
SUBCONTRACTOR OR THIRD PERSONS AGAINST
CONTRACTOR. REVIEW DOES NOT EXTEND TO
CONSIDERATION FOR STRUCTURAL INTEGRITY,SAFETY,
DETAILED COMPLIANCE WITH CONTRACT REQUIREMENTS
OR ANY OTHER OBLIGATION OF THE SUBCONTRACTOR.
SUBCONTRACTOR IS FULLY RESPONSIBLE
FOR CONFIRMING AND CORRELATING ALL DIMENSIONS;
FABRICATING AND CONSTRUCTION TECHNIQUES;
COORDINATING HIS WORK WITH THAT OF ALL OTHER
TRADES;AND THE SATISFACTORY PERFORMANCE OF HIS
ENTIRE WORK IN STRICT ACCORDANCE WITH THE
,CONTRACT DOCUMENTS.
Architect: Approver's Stamp
Sabine O'Halloran
P.C. These deferred submittal documents have been reviewed and
Mildren Design Group, Vbeen found to be in general conformance to the design of the
building. The defamed submittal items shall not be installed
until the design and submittal documents have been approved
try the building official.This review is for general conformance
with design concept only. Any deviation from plans or
specifications not clearly noted by the contractor has not been
reviewed.Review shall not conshlute a complete check of all
detailed dimensions or count or serve to relieve the contractor
of contractual responsibility for any error or deviation from the
contract requirements. miu�
DEaue
Date 01-17-2022 6sow
Reviewed bv:SOH
Response:
Comment:
Page I of 12