Loading...
Permit q CITY OF TIGARD BUILDING PERMIT '''- COMMUNITY DEVELOPMENT Permit#: BUP2022-00045 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 3/7/2022 Parcel: 2S102CB07400 Jurisdiction: Tigard Site address: 10470 SW PARK ST 101 Project: Middleton Trust Building Subdivision: 1998-084 PARTITION PLAT Lot: 2 Project Description: New 3,692 sq.ft.office building with accessory warehouse space. Contractor: PITMAN CONSTRUCTION AND REMODELING LLC Owner: MIDDLETON HOLDINGS LLC 436 SW BIRDSDALE DR PO BOX 23985 GRESHAM, 97 97080 TIGARD, OR 97281 PHONE: 503-515-8522 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: NEW Type of Const: VB Permit Fee-COM-New Construction 03/07/2022 $2,380.92 Occupancy Grp: B Occupancy Load: 49 12%State Surcharge-Building 03/07/2022 $285.71 Dwelling Units: 0 Plan Review 02/14/2022 $1,314.12 DC Provision Review,COM New-Bldg 03/07/2022 $218.50 Stories: 2 Height: 25 ft DC Provision Review,COM New-Ping 03/07/2022 $218.50 Bedrooms: 0 Bathrooms: 2 Plan Review-Fire Life Safety 03/07/2022 $952.37 Value: $449,185 Info Process/Archiving-Lg$2.00(over 03/07/2022 $52.00 11x17) Floor Areas: Info Process/Archiving-Sm$0.50(up to 03/07/2022 $47.50 11x17) Total Area: 3892 Metro CET 03/07/2022 $539.02 Accessory Struct: 0 Tigard CET-Non-Residential-Admin 03/07/2022 $179.67 Basement: 0 Tigard CET-Non-Residential-AH 03/07/2022 $4,312.17 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $10,500.48 Required: Required Items and Reports(Conditions) Fire Sprinkler: No Parapet: Yes 1 Special Inspection(see plans) Fire Alarm: Yes Protected Corridors: No Smoke Detectors: No Manual Pull Stations: No Accessible Parking: 2 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: Permittee Signature: 11 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. 13.1124.12Z City of Tigard " r ` t'e mk Ne.: 13125 SW Malt Blvd,Tigard.OR 97223 Pisa Revew '- �?� fLX/' e/ L'..�'p l'txme 503-718-2439 flax: 503-598.1460 1bW8..: w� / � Permit: . Inspection Lire: 503-639-417S Ready sr: 7 i to See Page 2 for .z dar.eov RECEIV�i - Sopplemaw larernadon O *Oki( D?A 1-A l AMi1 V DWEI JNG :: . BAN 2 6.w. txttsauetion ❑Dornolr on Permit fees'are based on the value of the work performed.--' T - Indicate the value(rounded to the nearest dotter)of all i 0 Add term lakuationJceplacemeni ❑Ott�l�OF l I ARU f equipment,materials,labor,overhead,and the profit for the clsTEiiii BY I1F cif DIM ON work l xt eased cot this applicnt mr. 1ifi1G D jr�y Valuation: $ p 7 and 2-fatniiydwelling �Coutmercialfuldustrial 1 0 Accessory building 0 Multi-family Number of bedrooms: p Mager builder 1 0 otherof Numbs ofbathrooms' J.+f6 91T£1NFOR1i4A7T6N:AJW L9e'no14 Total number of fleets: ? Job site address: 1(l_t,,.i-el t S W p.6,,, .t+. 5j4-. T. New dwelling area: square fret City/Strife/ZIP: ._..4 i S, ,,,,„i,ect name: ! S"�' ._. Covered porch area: square fret 1 iGarage/carport wen: square feet 1 i Cross st eet/dim:dons to job site Deck area: square feet \t't Q'�Ct.S."_ Fi V i e S i?t •,.« ;. ,f • D t3ATA W f4IMOlRCtAL-1S EC,tCX..,►BT I square I Subdivision: _ 1 Lot#' Permit fees"are based on the value of the pork pa'fonoed. I TimP #: Indicate the value(rounded to the nearest dollar)of all L ,.., m —/�'equipment,materials,labor,overhead,and the profit for the # : ,, ., tascfsaittiOiY'OF volix. - work indicated on this application. 1 Existing building ata:3 etZsquare fees __.__ -. New building area: ;;/ Q sgaere feet . 11/PRQP an toBIY_S N__ ' _. I_l TENAN'C.. Number of stories: y?- Name: .1' L- Type of construction: fI?C31k ' tk6" e Address: p elY. 23 $S" oers LI c�fsteerz� ter:d, P , 1 r7 2$I Existing Phone:( ) %K 610 5_ q Fax:( ) New: c,e, fJt,� o u Sf,, 0 AP.YYICAM' .. 0 cONTAO PPILSOl . �.BUILDING rh ff FEht$' ]3uainessnavte: ({j.tYtf'�'L?Y� 1 ' - LLC . :.• . . I�►� t�� qg '�} Structural plea review fee(or deposit): 'tom. Goateed Hama: 11-11- CY. t:7 ..»,mot FIS plan review fee(if applicable): Address: P 0. tS 17 x Irel.g 1 ( Total fees due upon application: City/State/ZIP:tP: hh� F + (G )� tar-1. 10 ax::( ) Ammon received: Frmed V d-r ds er b l fri {IA VW ,f ! r4) s Coalmeroiel and residential prescriptive Installation of .. .. . COiarl (FOR �'.: .:... ;: . • roof-sup rnoumtod Photovoltaic Solar Parcel System. Business name. J j tj+� 1r t j r,{-yam 1g Y e y Submit two(2)see of roof plan with connection details Address: �}{ gy 3 '-'""' """ 1 and fire department access,along with the 2010 Oregon "'hb ..% tY. . .-.. Solar lnsmttatfanS�.rdalr7+Code chocklist. t� f1 City/State/Z1P: -ref- ,.. -L V ? Permit fee(includes plan review i SI80.00 . .. _- _.._ and and iinistrative fees? i t Phone.( Se 2,- 1 Fax:( //) -:.State surcharge(12%of permit fee): 521.60 CCB[dcV I� ..r�� Total fee due upon application: S201.60 i Authorized signature:i:-:•; YYY -c,.,. ThB permit application expires if a permit b not obtained ^"t..-- within ISO days after It has been accepted as complete. Prirdname: J '\ _.v Date:...,f • Fee methodology set byTri-Ceunty Building Industry ..-.... ...._.- Savice Board 1:1Buiidi \Peimils113UP_COM_PermitApp.doc Rev.04/212014 430-0613T(111O21CO.M/WBB) illi LC& ti;)eer•42 if,Apte-n--4-Vir 1"--944-).i'c"'" Pr'-'-'' 'log r.>c'— ' c.". 3/7/.1.1 ..9- City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT T I c A R D Building Permit Review — Commercial - With Land Use Building Permit #: 64,Ab odo S- Site Address: 10470 SW Park Street Suite/Bldg#: Project Name: Middleton Trust Building (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: New office building with accessory warehouse space- BUILDING ONLY g] Verify site address/suite#exists and active in permit system. ] River Terrace Neighborhood: ❑ Yes ® No ® Land Use Case#: SDR2020-00004 ® Plans Match Approved Land Use: ® Site Plan Landscape Plan a Other: Floor Q lain El Urban Forestry Plan 6Cl Elevation Plan I Building Height: Maximum I leight 45 Actual Height 26 M Conditions Met: X Prior to Submittal $7 Prior to Permit Issuance fBusiness License: Exists: ❑ Yes ❑ No,applicant was provided a business license application M Public Facilities Improvement(PH) Permit: PFI2021-00143 Required: X] Yes,applicant was notified ❑ No Applied For: M Yes ❑ No,stop intake Notes: , ,,,��y� Approved by Planning: Oel Date: 2/4/2022 Revisions (after BuildingSubmittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal Original Submittal Date: 1/2./ Site Plans: # W/t Building Plans: # Building Permit#: [ nt�er building permit above. Workflow Routing: lanning WU—Engineering EI-1 ermit Coordinator Bf�lii c ng Workflow Sign-off: g—iign-off for Planning(include notes from planning review) Route Application Documents: ding original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: 02 c% I:\Building\Forms\BldgPennitRvw_COM_W ithLandUse_111819.docx Engineering Review �j Slope at building pad: `p ,CFI Permit#: mot!-co- 143 2 (;onditions "Met"prior to issuance of building permit Easements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes JLE,'No Assess Water Quantity Fee in-lieu: ❑ Yes l d No LIDA Facility on lot: ❑ Yes C(No Add Fee: ❑ Yes 0 No E NOT Approved by Engineering: Date Notes: Approved by Engineering: F{ , G4c(z— Date: GI- /Sze Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: 7 Yes ❑ N/A Tigard Trans SDC: 1p Yes ❑ N/A Parks SDC: Yes ❑ N/A LIDA Fee: ❑ Yes /Er N/A fzr OK to Issue Permit Approved by Permit Coordinator: IVA— Date: 2-I1�1 202:2— I:\Building\Fonns\B IdgPermitRvw_COM_W ithLandUse_111819.docx • TDT/TSDC Estimate 2/17/2022 10470 SW Park St BUP2022-00045 AML TDT& RESIDENTIAL TSDC RATES EFFECTIVE 7/1/21 NON-RES:TSDC CITYWIDE EFFECTIVE 7/1/21 0 Yes Project is in River Terrace ? ® No * For TDT and residential formula has been replaced with published rate per unit. Former Use ITE Rate per Rate per TDT/TSDC Rate Type Use # Code PHVT PHVT Unit* # Units Amount Description TDT 1 $0 vacant land TSDC-Imp 1 0.00 $0 $0 0.00 $0 TSDC-Reim 1 0.00 $0 $0 0.00 $0 TSDC-RT 1 0 $0 0.00 $0 TDT 2 0 $0 0.00 $0 TSDC-Imp 2 0.00 $0 $0 0.00 $0 TSDC-Reim 2 0.00 $0 $0 0.00 $0 TSDC-RT 2 $0 0.00 $0 Did total TSDC need to be reduced to 80%of TDT? Use 1 No Use 2 No Total TDT and TSDCs Former Uses $0 Proposed Use ITE Rate per Rate per TDT/TSDC Use# Code PHVT PHVT Unit* # Units Amount Description TDT 1 710 $10,100 2.47 $24,906.60 2466 SF Office TSDC-Imp 1 710 1.49 $8,905 $13,268 2.47 $18,837.95 TSDC-Reim 1 710 1.49 $514 $766 2.47 $1,087.33 TSDC-RT 1 0.00 $0 $0 0.00 $0 TDT 2 150 $4,822 1.43 $6,876 1426 SF warehouse TSDC-Imp 2 150 0.56 $8,905 $4,987 1.43 $5,201 TSDC-Reim 2 150 0.56 $514 $288 1.43 $300 TSDC-RT 2 0.00 $0 $0 0.00 $0 TDT 3 0.00 $0 TSDC-Imp 3 0.00 $0 0.00 $0 TSDC-Reim 3 0.00 $0 0.00 $0 TSDC-RT 3 0.00 $0 0.00 $0 Did total TSDC need to be reduced to 80%of TDT? Use 1 Yes Use 2 Yes Use 3 No Total All TDTs &TSDCs Proposed Uses $57,209 Less: Total All TDTs &TSDCs Former Uses $0 Total All TDTs &TSDCs Net Increase $57,209 Total Net County TDT $31,782.77 Total Net TSDC-Imp $24,038.69 Total Net TSDC-Reim $1,387.52 Total Net TSDC RT Overlay $0 TDT TSDC Imp+ Reim Target Recovery Rate 28.0% 30% Estimated Total Impact $113,510 $84,754 Estimated Unmitigated Impact $81,727 $59,328 All TDT&TDSC TSDC RT Overlay Target Recovery Rate 29% 30% Estimated Total Impact $198,264 $0 Parks Estimate 2/17/2022 10470 SW Park St BUP2022-00045 AML ALL PARKS RATES EFFECTIVE 7/1/21 0 Yes Project is in River Terrace ? 0 No Note: All Neigh-Imp# Units entries =0 if project is in River Terrace; All Neigh-RT# Units entries=0 if project is elsewhere in the city. Former Use Rate Type Use# ITE Code # Units Rate Parks Amount Description Parks-Imp 1 0 $542 $0 Parks-Reim 1 0 $99 $0 0 Neigh-Imp 1 0 $0 $0 0 Neigh-RT 1 $0 0 2 $0 Total Parks Former Uses $0 Proposed Use Use# ITE Code # Units Rate Parks Amount Description Parks-Imp 1 710 7 $542 $3,794 2466 SF Office Parks-Reim 1 710 7 $99 $693 0 Neigh-Imp 1 710 $0 $0 Neigh-RT 1 $0 1 Parks-Imp 2 150 0.57 $542 $309 Parks-Reim 2 150 0.57 $99 $56 0 Neigh-Imp 2 150 $0 $0 0 Neigh-RT 2 $0 0 Parks-Imp 3 $0 Parks-Reim 3 $0 Neigh-Imp 3 $0 Neigh-RT 3 $0 Total Parks Outside RT Proposed Uses $0.00 Less: Total Parks Outside RT Former Uses $0.00 Total All Parks Outside RT Net Increase $0.00 Total Parks RT Proposed Uses $0.00 Less: Total Parks RT Former Uses $0.00 Total All Parks RT Net Increase $0.00 Total Parks-Imp $4,102.94 Total Parks-Reim $749.43 Total Neigh-Imp $0 No Neigh-Imp Total Neigh-RT $0 No Neigh-RT For Non-Residential Calculations: Proposed Use: Gent Office=350sf/EE; 2466/350=7.0EEs. Proposed Use: Warehouse=2500sf/EE;1426/2500=0.57xEEs.