Loading...
Permit I 4 CITY OF TIGARD BUILDING PERMIT 'k' COMMUNITY DEVELOPMENT Permit#: BUP2018-00305 Date Issued: 2/8/2022 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S110AC01101 Jurisdiction: Tigard Site address: 11290 SW BULL MOUNTAIN RD Project: Jacksons Food Stores 530 Subdivision: None Lot: None Project Description: A new convenience store with a fuel canopy,trash enclosure,and a covered recycle enclosure. Contractor: ONSITE DEVELOPMENT Owner: PACWEST ENERGY LLC PO BOX 3171 3450 COMMERCIAL CT OGDEN, UT 84404 MERIDIAN, ID 83642 PHONE: 801-621-1600 PHONE: 208-888-6061 FAX: FEES Specifics: Description Date Amount Type of Use: COM DC Provision Review,COM New-Bldg 01/18/2022 $194.00 Class of Work: NEW Type of Const: VB Permit Fee-COM-New Construction 01/18/2022 $2,713.18 Occupancy Grp: Occupancy Load: 49 12%State Surcharge-Building 01/18/2022 $325.58 Dwelling Units: 0 Plan Review 11/01/2018 $1,964.94 Stories: 1 Height: 0 ft Plan Review-Fire Life Safety 01/18/2022 $1,085.27 Bedrooms: 0 Bathrooms: 2 Info Process/Archiving-Lg$2.00(over 01/18/2022 $158.00 Value: $523,657 11x17) Info Process/Archiving-Sm$0.50(up to 01/18/2022 $50.00 11x17) Floor Areas: Metro Const.Excise Tax 01/18/2022 $628.39 Total Area: 7008 Tig-Tual School CET-Non Residential 01/18/2022 $4,555.20 Accessory Struct: 0 Plan Review 01/18/2022 $-201.37 Basement: 0 Wash Co Trans Dev Tax 01/18/2022 $40,924.00 Carport: 0 Tigard Trans SDC Improvement 01/18/2022 $43,805.84 Tigard Trans SDC Reimbursement 01/18/2022 $2,512.16 Covered Porch: 0 Parks SDC Improvement 01/18/2022 $1,403.44 Deck: 0 Parks SDC Reimbursement 01/18/2022 $254.87 PFI Permit Fee(LIDA) 01/18/2022 $300.00 Garage: 0 Additional Plan Review 02/03/2022 $45.00 Mezzanine: 0 Total $100,763.50 Required: Required Items and Reports(Conditions) 1 Special Inspection (see plans) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of Issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through �OAR �952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: _ s Permittee Signature: yJ _ j_ ,� • ' 03.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the Job site until completion of the project. Approved plans are required on the Job site at the time of each inspection. IF City of Tigard , 111111 COMMUNITY DEVELOPMENT DEPARTMENT 1. G n►i Building Permit Review — Commercial - With Land Use IBuilding Permit #: 61i f ooi 7 Oc' , . .)5— Si te Address: // O5 4.94 4,,,,)„`n Suite/Bldg#: Project Name: ja grx1S -F St)r-. (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: 1\JCW reali I bALIAtl-ly Arld gas (2t4'1o1,11 Verify site address/suite# exists and active in permit system. `l 'River Terrace Neighborhood: ❑ Yes g No Land Use Case#: COP2OI7—OCCOS '. Plans Match Approved Land Use: .g. Site Plan Landscape Plan ❑ Other: klik-Vrban Forestry Plat. S..Elevation Plan 1 ►: :wilding Height: (b4 Ac wed Maximum Height L}St ' ctual Ileight 22 0 onditions Met: S I ig Prior to Submittal 0 .6rior to Permit Issuance TA Business License: Exists: 1 Yes 0 No,applicant notified to obtain business license KPublic Facilities Improvement(PFI) Permit: Required: 8-..Yes,applicant was notified ❑ No Applied For: R[ Yes 0 No,stop intake Notes: DO Ylp}-..l C6u-Q 1 finlevitixi,1$ C l tr r)c* rn . Approved by Planning: 0 Date: 1 O/ 8 Revisions (after Building Submi only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: 0 Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: ! ` ! C ll Site Plans: # 3 Building Plans: # 7) Building Permit#: nter building permit#above. Workflow Routing: Tanning Ici.Engineering ermit Coordinator Building Workflow Sign-off: Sign-off for PI nning(include notes Erom planning review) Route Application Documents: 7 Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: I By Permit Technician: Date: /4 I:\Building\Fonns'BldgPemritRvw_COM_W ith landUse_060116.doex i Engineering Review 20S-Ope at building pad: 3 s gi-I'FI Permit#: 1 ( ;.en p a 6.7 SJ onditions "Met"prior to issuance of building permit cpsiO5r 2—Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) 2-Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes I,;1• No Assess Water Quantity Fee in-lieu: ❑ Yes LIDA Facility on lot: 121'Yes ❑ No • 0 NOT Approved by Engineering: Date Notes: --1)0 NO •I SStJi; f�at rte.•+6 (.t 444 4_+ gt f- IWE OIL 4-0 /L4-1.4.4cA, I 7_-2 3• Zc�2.l Approved by Engineering: j(g u rr s13 Date: / ) 7 -he Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved ❑ Not Approved Revision 2: ❑ Approved 0 Not Approved Revision 3: 0 Approved ❑ Not Approved Permit Coordinator Review 4 Conditions "Met"prior to issuance of building permit $ pproved,NOT Released: / 41M, y„i � 4 a i j! / --; "Alt Notes: / Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Nptice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ZSDC Fees Entered: Wash Co Trans Dev Tax: g Yes 0 N/A Tigard Trans SDC: Yes 0 N/A Parks SDC: 4 Yes 0 N/A FT OK to Issue Permit LA e S Approved by Permit Coordinator: Date: 1 Z 12 3 1 ZO t1 I:\Building\Fomvs\BldgPermitRvw_COM_W ithLandUse_070915.docx r TDT/TSDC Estimate Jacksons Food Stores 10/19/2021 1 11290 SW Bull Mountain Rd. AML TDT&RESIDENTIAL TSDC RATES EFFECTIVE 7/1/21 NON-RES:TSDC CITYWIDE EFFECTIVE 7/1/21 0 Yes Project is in River Terrace? ® No * For TDT and residential formula has been replaced with published rate per unit. Former Use ITE Rate per Rate per TDT/TSDC Rate Type Use# Code PHVT PHVT Unit* #Units Amount Description TDT 1 946 $17,039 4.00 $68,156 Gas Station,4 pump: TSDC-Imp 1 946 3.47 2,790 $9,681 4.00 $38,725 with Market TSDC-Reim 1 946 3.47 160 $555 4.00 $2,221 TSDC-RT 1 0 $0 0.00 $0 TDT 2 0 $0 0.00 $0 TSDC-Imp 2 0.00 $0 $0 0.00 $0 TSDC-Reim 2 0.00 $0 $0 0.00 $0 TSDC-RT 2 $0 0.00 $0 Did total TSDC need to be reduced to 80%of TDT? Use 1 No Use 2 No Total TDT and TSDCS Former Uses $109,102 Proposed Use ITE Rate per Rate per TDT/TSDC Use# Code PHVT PHVT Unit* #Units Amount Description TDT 1 853 $27,270 4.00 $109,080.00 Convenience Markel TSDC-Imp 1 853 17.38 2,790 $48,490 4.25 $82,531.04 with Fuel Pumps TSDC-Reim 1 853 17.38 160 $2,781 4.25 $4,732.96 TSDC-RT 1 0.00 $0 $0 0.00 $0 TDT 2 0.00 $0 TSDC-Imp 2 0.00 $0 $0 0.00 $0 TSDC-Reim 2 0.00 $0 $0 0.00 $0 TSDC-RT 2 0.00 $0 $0 0.00 $0 TDT 3 0.00 $0 TSDC-Imp 3 0.00 $0 0.00 $0 TSDC-Reim 3 0.00 $0 0.00 $0 TSDC-RT 3 0.00 $0 0.00 $0 Did total TSDC need to be reduced to 80%of TDT? Use 1 Yes Use 2 No Use 3 No Total All TDTs&TSDCs Proposed Uses $196,344 Less: Total All TDTs&TSDCs Former Uses $109,102 Total All TDTs&TSDCs Net Increase $87,242 Total Net County TDT $40,924.00 Total Net TSDC-Imp $43,805.84 Total Net TSDC-Reim $2,512.16 Total Net TSDC RT Overlay $0.00 TDT TSDC Imp+Reim Target Recovery Rate 28.0% 30% Estimated Total Impact $146,157 $154,393 Estimated Unmitigated Impact $105,233 $108,075 All TDT&TDSC TSDC RT Overlay Target Recovery Rate 29% 30% Estimated Total Impact $300,550 $0 Estimated Unmitigated Impact $213,308 $0 TDT=County Transportation Development Tax TSDC Citywide=City of Tigard Transportation System Development Tax(TSDC-Imp&TSDC-Reim) TSDC RT=River Terrace Transportation System Development Tax Overlay Extended Combination SDC Calculator-091018-I:\Community Development\Permit Coordinator\SDC Calculators Parks Estimate Jacksons Food Stores #530 11/8/2018 11290 SW Bull Mountain Rd. AMS ALL PARKS RATES EFFECTIVE 7/1/18 0 Yes Project is in River Terrace ? C) No Note: All Neigh-Imp# Units entries=0 if project is in River Terrace; All Neigh-RT# Units entries =0 if project is elsewhere in the city. Former Use Rate Type Use# ITE Code # Units Rate Parks Amount Description Parks-Imp 1 851 2.76 $424 $1,170 1102 SF Convenience Store Parks-Reim 1 851 2.76 $77 $213 0 Neigh-Imp 1 851 2.76 $0 $0 ' Neigh-RT 1 $0 0 2 $0 Total Parks Former Uses $1,383 Proposed Use Use# ITE Code # Units Rate Parks Amount Description Parks-Imp 1 851 6.07 $424 $2,574 4250 SF Convenience Store Parks-Reim 1 851 6.07 $77 $467 Neigh-Imp 1 851 6.07 $0 $0 0 Neigh-RT 1 $0 Parks-Imp 2 $0 0 Parks-Reim 2 $0 0 Neigh-Imp 2 $0 0 Neigh-RT 2 $0 0 Total Parks Outside RT Proposed Uses $3,041 Less: Total Parks Outside RT Former Uses $1,383 Total All Parks Outside RT Net Increase $1,658 Total Parks RT Proposed Uses $0 Less: Total Parks RT Former Uses $0 Total All Parks RT Net Increase $0 Total Parks-Imp $1,403 Total Parks-Reim $255 Total Neigh-Imp $0 $1,658 Total Neigh-RT $0 For Non-Residential Calculations: Prior Use: Convenience Store=400sf/EE; 1.102/400=2.76EEs. Proposed Use: Convenience Stare=700sf/EE;4250/700=6.07EEs. Parks-Imp=Parks Improvement,Citywide including River Terrace Parks-Reim=Parks Reimbursement,Citywide including River Terrace Neigh-Imp=Neighborhood Parks Improvement Outside River Terrace Neigh-RT=Neighborhood Parks Improvement Inside River Terrace CITY OF TIGARD 11/13/2018 11:12:46AM 13125 SW Hall Blvd. T[tiARD Tigard,OR 97223 (503)639-4171 Conditions Associated With Case #: CUP2017-00005 Project Name: Jackson Food Stores #530 # DESCRIPTION STATUS STATUS DATE SEVERITY APPLIED BY ACTION BY 01.TREE PROTECTION Not Met 7/19/18 Agnes Lindor 01. Prior to site work,the project arborist shall perform a site inspection for tree protection measures, document compliance/non-compliance with the urban forestry plan, and send written verification with a signature of approval directly to the project planner within one week of the site inspection. 02. SEMI-MONTHLY ARBORIST REPORT Not Met 7/19/18 Agnes Lindor 02. The project arborist shall perform semimonthly(twice monthly)site inspections for tree protection measures during periods of active site development and construction, document compliance/non-compliance with the urban forestry plan, and send written verification with a signature of approval directly to the project planner within one week of the site inspection. 03.TREE ESTABLISHMENT BOND Not Met 7/19/18 Agnes Lindor 03. Prior to site work, the applicant shall provide a tree establishment bond for all trees to be planted in accordance with the approved urban forestry plan.The total bond amount shall be equivalent to the city's average cost to plant and maintain a tree per the applicable standards in the Urban Forestry Manual for a period of one year after planting multiplied by the total number of trees to be planted and maintained. Final amount determined upon submittal of revised plans. 04. TREE INVENTORY FEE Not Met 7/19/18 Agnes Lindor 04. Prior site work,the applicant shall submit to the city the current Inventory Data Collection fee for urban forestry plan implementation.The fee shall be for the two preserved trees and any newly planted trees. Final amount determined upon submittal of revised plans. 05. STREE TREES Not Met 7/19/18 Agnes Lindor 05. The applicant shall submit a revised plan showing the required street trees, pay into the street tree fund, or a combination thereof. 06. REVISED URBAN FORESTRY PLAN Not Met 7/19/18 Agnes Lindor 06. Tree#16 is too close to paved surfaces, and Trees#19 through#24 do not meet the minimum 30-foot spacing requirements and spacing from underground utilities. The applicant shall submit a revised urban forestry plan and supplemental report to address these deficiencies, pay into the urban forestry fund, or combination thereof. 07. REFUSE AREA SCREENING Not Met 7/19/18 Agnes Lindor 07. The applicant shall submit a revised plan showing the required screening for the refuse areas. 08. IMPROVEMENTS IN CONFORMANCE WITH Not Met 7/19/18 Khoi Le CODES AND STANDARDS Page 1 of 5 # DESCRIPTION STATUS STATUS DATE SEVERITY APPLIED BY ACTION BY 08. Improvements associated with public infrastructure, including street improvements and right-of-way dedication, utilities,grading,water quality and quantity facilities, streetlights,easements,easement locations, and utility connections for future utility extensions shall be designed in accordance with the following codes and standards: • City of Tigard Public Improvement Design Standards • CleanWater Services(CWS)Design and Construction Standards • Tigard Community Development Codes, Municipal Codes • Fire Codes • Other applicable Utility District,County, State,and Federal Codes and Standard Guidelines 09. ENGINEERING APPROVAL Not Met 7/19/18 Khoi Le 09. Improvements associated with public infrastructure, including street improvements and right-of-way dedication, utilities,grading,water quality and quantity facilities,streetlights,easements,easement locations, and utility connections for future utility extensions, are subject to the City Engineer's review, modification, and approval. 10. PFI REQUIRED Not Met 7/19/18 Khoi Le 10. Prior to commencing site improvements,a Public Facility Improvement(PFI)Permit is required for this project to cover all public infrastructure work including storm water quality and detention facilities and any other work in the public right-of-way. Four(4)sets of detailed public improvement plans shall be submitted for review to the Engineering Department.An Engineering cost estimate of improvements associated with public infrastructure including but not limited to street,street grading, utilities,stormwater quality and water quantity facilities,sanitary sewer,streetlights, and franchise utilities shall be required at the time of PFI Permit submittal. Engineering cost estimate of water improvement shall be listed as a separate line item from the total cost estimate. NOTE:these plans are in addition to any drawings required by the Building Division and should only include sheets relevant to public improvements. PFI Permit plans shall conform to City of Tigard Public Improvement Design Standards,which are available at City Hall and the City's web page(www.tigard-or.gov). 11. EXACT LEGAL NAME Not Met 7/19/18 Khoi Le 11. Prior to commencing site improvements,submit the exact legal name,address and telephone number of the individual or corporate entity who will be designated as the"Permittee,"and who will provide the financial assurance for the public improvements. For example,specify if the entity is a corporation, limited partnership, LLC, etc.Also,specify the state within which the entity is incorporated and provide the name of the corporate contact person. Failure to provide accurate information to the Engineering Department will delay processing of project documents. 12. SW BULL MOUNTAIN RD IMPROVEMENTS Not Met 7/19/18 Khoi Le Page 2 of 5 # DESCRIPTION STATUS STATUS DATE SEVERITY APPLIED BY ACTION BY 12. Prior to commencing site improvements, submit plans showing the following items to Engineering for review and approval: SW Bull Mountain Road along the proposed development frontage shall be shown to have: • Between 35 feet and 42 feet of right-of-way from centerline dedication to accommodate the following: o 6-foot half center lane o 11-foot travel lane o 5-foot bike lane o 11-foot right turn lane where required • Curb and gutter • 8-foot curb tight sidewalk • 5-foot planter where required • Storm water LIDA where required • Driveway approaches meeting the City of Tigard Standards • Street trees in the planter strip spaced per requirements • Streetlights as recommended from the approved photometric analysis • Street and bike lane striping and traffic signs meeting the City of Tigard Standards,the Manual of Uniform Traffic Control Devices(MUTCD),and applicable codes • Street transition from narrower to wider sections meeting the City of Tigard and ODOT Standards 13. FRONTAGE ROAD IMPROVEMENTS Not Met 7/19/18 Khoi Le 13. Construction on the old Frontage Road, Pacific Highway/Highway 99,and ODOT controlled influence area on SW Bull Mountain Road will require a permit with ODOT. New and replaced sidewalk on the old Frontage Road must be constructed in concrete and meet the City of Tigard and ODOT standards. 14.CONSTRUCTION VEHICLE ACCESS PLAN Not Met 7/19/18 Khoi Le 14. Prior to commencing site improvements, provide a construction vehicle access and parking plan for approval by the City Engineer.The purpose of this plan is for parking and traffic control during the public improvement construction phase.All construction vehicle parking shall be provided onsite. No construction vehicles or equipment will be permitted to park on the adjoining residential public streets.Construction vehicles include the vehicles of any contractor or subcontractor involved in the construction of site improvements or buildings proposed by this application,and shall include the vehicles of all suppliers and employees associated with the project. 15. PHOTOMETRICS ANALYSIS Not Met 7/19/18 Khoi Le 15. Prior to commencing site improvements, provide a photometric analysis along SW Bull Mountain Road for the review and approval. Photometric analysis will follow the recommended values and requirements per ANSI/IESNA. If new streetlights are required based on the photometric analysis,the applicant shall submit plans showing the location of streetlights for review and approval.Type and color of pole and light fixture shall also be included on the plan. 16. FINAL STORM DRAINANGE REPORT Not Met 7/19/18 Khoi Le 16. Prior to commencing site improvements,submit a final storm drainage report and site plans as part of the PFI Permit indicating how run-off from new and modified impervious areas located onsite and offsite will be collected and treated for review and approval.The storm drainage report shall include a maintenance plan in accordance with CWS Design and Construction Standards and the City of Tigard Design Guidelines. 17. CWS STORMWATER CONNECTION Not Met 7/19/18 Khoi Le AUTHORIZATION 17. Prior to commencing site improvements, obtain a CWS Stormwater Connection Authorization prior to issuance of the City of Tigard PFI Permit. Plans shall be submitted to the City of Tigard for review.The city will forward plans to CWS after preliminary review. 18.SEWER CONNECTION Not Met 7/19/18 Khoi Le Page 3 of 5 # DESCRIPTION STATUS STATUS DATE SEVERITY APPLIED BY ACTION BY 18. Prior to commencing site improvements, submit site plans as part of the PFI Permit showing the location of proposed sanitary sewer laterals and connections for review and approval. Plans shall include any existing and proposed public sanitary sewer easements.All public sanitary sewer facilities and easements shall be designed and constructed in accordance with the City of Tigard and CWS Design and Construction Standards. 19.WATER IMPROVEMENTS Not Met 7/19/18 Khoi Le 19. Prior to commencing site improvements, submit site plans as part of the PFI Permit showing the location of proposed water improvements, including but not limited to the location of the tap,water meter,double check and fire vaults, fire hydrants, and any associated facilities for review and approval. 20.EROSION CONTROL PLAN Not Met 7/19/18 Khoi Le 20. Prior to commencing site improvements,provide an erosion control plan as part of the PFI Permit. The plan shall conform to the"CWS Erosion Prevention and Sediment Control Design and Planning Manual" (current edition). 21. FINAL GRADING PLAN Not Met 7/19/18 Khoi Le 21. Prior to commencing site improvements,submit a final grading plan showing the existing and proposed contours for review and approval.The plan shall detail the provisions for surface drainage,and show that they will be graded to ensure that surface drainage is directed to the street or a public storm drainage system. 22. 1200-CN GENERAL PERMIT Not Met 7/19/18 Khoi Le 22. Prior to commencing site improvements, obtain a 1200-CN General Permit issued by the City of Tigard pursuant to ORS 468.740 and the Federal Clean Water Act. 23.TVF&R APPROVAL Not Met 7/19/18 Khoi Le 23. Prior to commencing site improvements, provide written approval from Tualatin Valley Fire&Rescue for fire flow, hydrant placement,and emergency vehicular access and turn around. 24. ODOT WRITTEN APPROVAL Not Met 7/19/18 Khoi Le 24. Prior to commencing site improvements,provide written approval from ODOT for work in the old Frontage Road, Pacific Highway/Highway 99,and ODOT controlled influence area on SW Bull Mountain Road. 24. PLANNING INSPECTION Not Met 7/19/18 Agnes Lindor 25. Prior to final building inspection,the applicant shall contact the Project Planner,Agnes Lindor, 503-718-2429 for final walk-through.All site improvements must be completed per approved plans. 26. RECORD DEDICATION Not Met 7/19/18 Khoi Le 26. Prior to final building inspection, record the deed dedication of the right-of-way along SW Bull Mountain Road and a 6-foot PUE along the frontage of SW Bull Mountain Road. Document shall be on the City form. 27. RECORD PUE Not Met 7/19/18 Khoi Le 27. Prior to final building inspection, a 6-foot PUE along the frontage of SW Bull Mountain Road shall be recorded. 28.STREET IMPROVEMENTS COMPLETED Not Met 7/19/18 Khoi Le 28. Prior to final building inspection,work in the old Frontage Road, Pacific Highway/Highway 99 and ODOT controlled influence area on SW Bull Mountain Road shall be constructed, completed,and/or satisfied. 29. STORMWATER QUALITY FACILITIES Not Met 7/19/18 Khoi Le COMPLETED 29. Prior to final building inspection,work in the public right-of-way or public easement and including stormwater quality facilities shall be constructed, completed, and/or satisfied.Approval from the Engineering Division shall be required. 30. UNDERGROUNDING LINES Not Met 7/19/18 Khoi Le Page 4 of 5 • # DESCRIPTION STATUS STATUS DATE SEVERITY " APPLIED BY ACTION BY 30. Prior to final building inspection,place the low voltage electrical lines as well as the cable and communications lines underground along the site frontage on the old Frontage Road.Alternatively,the applicant can request to pay a fee in lieu of undergrounding. If the request is approved,the fee shall be paid in accordance with the City of Tigard Fees and Charges Schedule. 31.MAINTENANCE AGREEMENT Not Met 7/19/18 Khoi Le 31. Prior to final building inspection,demonstrate that they have entered into an agreement on City forms for the maintenance of the private on-site water quality facilities. 32. FINAL SIGHT DISTANCE CERTIFICATION Not Met 7/19/18 Khoi Le 32. Prior to final building inspection,submit a Final Sight Distance Certification for the access driveways at SW Bull Mountain Road for review and approval. 33.AS-BUILT DRAWINGS Not Met 7/19/18 Khoi Le 33. Prior to final building inspection,provide the City with as-built drawings of the public improvements as follows: 1)3 mil mylar,2)a diskette of the as-builts in "DWG"format;otherwise"DXF"will be acceptable, and 3)the as-built drawings shall be tied to the City's GPS network.The applicant's engineer shall provide the City with an electronic file with points for each structure(manholes,catch basins,water valves, hydrants and other water system features)in the development, and their respective X and Y State Plane Coordinates,referenced to NAD 83(91). Page 5 of 5