PFI2022-00038 n CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT
COMMUNITY DEVELOPMENT Permit#: PF12022-00038
Date Issued: 02/10/2022
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 parcel: seg2565
Jurisdiction:
Site address:
Subdivision: Lot:
Project: PGE Job#M3055635
Project Description: SEG 2565/Contractor to bore/trench to install conduits and vaults(72 and 73) PGE to pull wire through
contractor installed conduit
Class of Work: FEES
Type 1 -Utilities(gas, electric, data) Description Date Amount
PFI Permit Fee 02/09/2022 $300.00
Total 5300.00
Owner:
REQUIRED INSPECTIONS
Call 503-639-4175 for the IVR inspection request line or visit the City of
PHONE: Tigard website at www.tigard-or.gov to schedule inspections online.
Contractor:
PHONE.
Applicant:
JEREMY SPRAGUE
2213 SE 153RD DR.
BEAVERTON, OR 97003
PHONE:
Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact
information of responsible parties before beginning work.
Permittee/Applicant
Signature: See application
Issued By: &�4L 4'lvl�
Special Conditions(See Attached)
Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY
Conditions for PF12022-00038
Type: Condition Name: Status: Severity:
PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice
Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any
agreement with the City of Tigard regarding work to be done pursuant to this permit.
PFI_Utilities 02-WORK SITE AREA Applied Notice
The work area and approach roads shall be maintained in a clean condition, free from obstructions and hazards. The
spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and
violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and
suspension of work to accomplish clean-up.
PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice
Prior to starting work, effective and approved erosion control devices must be installed and maintained meeting the Clean
Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to
accomplish effective erosion control.
PFI_Utilities 04-WORK SITE REPAIRS Applied Notice
Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be
reinstalled or replaced,with like kind of material. Obtain City approval of restoration work.
PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice
Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices
[MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA,current edition, American Traffic Safety Services
Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH].
PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice
Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area.
Traffic control devices, flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively
maintained.
PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice
Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The
applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area
wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue) and to 503-962-8140(Tri-Met)and
503-431-2345(Tigard School District)and other service providers impacted by such closure.
PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice
Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at
each end of the construction area 72 hours (min.) before initiation of construction work.
PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice
Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City
approval of any access closures.
PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice
Work is permitted in daylight between the hours of 7:00 a.m,to 7:00 p.m. Mon-Fri unless otherwise authorized by the City.
PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice
Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City
Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the
City Engineer.
PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice
The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to
assure public safety.
PFI_Utilities 13-DRAINAGE CONTROL Applied Notice
Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and
the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective
drainage control.
PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice
Oregon taw requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR
952-001-0100 through OAR 952-001-0080. Copies of said rules maybe obtained from the Center by calling 503-246-1987. If
you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit
holder's expense.
PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice
Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before
digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the
applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with
affected utility agencies.
PFI_Utilities 16-TEMPORARY PATCH Applied Notice
A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance
approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is
liable for hazards or damage resulting from the prosecution of the work.
PFI_Utilities 17- REPAIR OF EXISTING FACILITIES Applied Notice
Work under this permit shall include repair of existing facilities(roads,ditches, etc.)as may be necessary, as determined by
the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit.
Corrective work shall be done at the applicant's expense.
PFI_Utilities 19- PRECONSTRUCTION MEETING Applied Notice
Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert
Phone#>,to establish a preconstruction meeting.
PFI_Utilities 20- NOTICE TO COMMENCE WORK Applied Notice
The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection,
and after completing work covered by the permit.
Contact Ken Fisher at 503 816 6146 or kenny@tigard-or.gov
PFI_Utilities 21 - PERMIT/PLAN ON SITE Applied Notice
A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan
and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and
provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and
specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work
performance.
PFI_Utilities 22 - DAILY INSPECTION REPORTS Applied Notice
Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector.
PFI_Utilities 23 -MONUMENT PROTECTION Applied Notice
Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's
expense.
PFI_Utilities 24 -VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice
The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or
construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense.
PFI_Utilities 25 -EMERGENCY CONTACTS Applied Notice
Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2)persons who have
authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The
applicant shall notify the City Inspector, in writing, of any/all assignment changes.
PFI_Utilities 26 -RIGHT OF ENTRY/EASEMENTS Applied Notice
Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed
easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain
or provide for proof of right-of-entry or easements.
PFI_Utilities 27 -PRIVATE PROPERTY AGREEMENTS Applied Notice
Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction
activity.
PFI_Utilities 28 -AS-BUILT DRAWING Applied Notice
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
1,2,3,4,5 28-AS-BUILT DRAWING
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
One as-built drawing showing all new public improvements, including any revision made to the previously approved
construction plans and, also,any improvement which may impact an existing public system or facility, shall be provided to the
City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance).
PFI—Utilities 31 -OTHER Applied Notice
Other
w
City of Tigard PFI#: PF12022-00038
ENGINEERING DEPARTMENT
Public Facilities Improvement (PFI) Permit
PROJECT INFORMATION
PGE Job# M3055635 TYPE of WORK
Project name: ® TYPE 1—Franchise Utility Work
Brief description of project:
Contractor to bore/trench to install performed byNWN,PGE, or utility
agency
conduits and vaults (72 & 73). PGE to pull wire through ❑ TWE 2—ROW Sidewallr/Driveway/Sewer
contractor installed conduit. Work performed for the purpose of
• Sidewalk installation or repair
• Driveway approach installation and repair
SITE INFORMATION • Sanitary sewer lateral installation and
Location (address if available):
16625 SW 92nd Ave main line tap
❑ TYPE 3—Full Scale Development Work
Portland, OR, 97224 performed with land use approval which
includes any of the following.
• Subdivisions or Partitions
APPLICANT INFORMATION • StreetwidLning
Name: PGE [Submitted by Jeremy Sprague] • Mainline installation for Sanitary sewer,
storm sewer, Tigard water, and Tigard
Mailing address: 2213 SW 153rd Dr water service area
City/State:
Beaverton/OR Zip: 97003 ElTYPE 4—Small Cell Technology
Phone:
503-672-5446 ❑ TYPE 5-Tigard Triangle
Email: crewcoordination-western@pgn.com Phone: 503-464-7777
NOTE: Type 1 and 2 applications may be
Contact name:
Jose Velasco emailed to rowpermitsatigard-or.goov.
Phone: 503-672-5454 Email: crewcoordination-western@pgn.com
CONTRACTOR INFORMATION ❑ Same as applicant
Name: Lindberg Pipe & Grade Inc. CCB Number: 183853
Mailing address: PO Box 203 City/state: Brush Prairie/WA Zip: 98606
Phone: 360-518-4505 Email: MattB@Ipgrade.com
ENGINEER INFORMATION
Name: PGE Crew
Mailing address: City/State: Zip:
Phone: Email:
ADDITIONAL INFORMATION
Estimated value of work is required(if over$5,000):$ (within the public right-of-way)
Is work related to a LAND USE DECISION? ❑Yes El No Case number:
City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 ww-wtigard-or.gov • 503-718-2421 • Page 1 oro
APPLICANTS
NOTE: Person specified as`Applicant"shall be designated"Permittee"and shall provide financial assurance for
work,if required by the city pursuant to TMC 15.04.140.
* With the exception of a utility operating pun, t to a valid franchise or license with the City of Tigard,when the owner and the applicant
are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner
or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this
application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application.
I,the applicant,certify that:
• To the best of my knowledge, all the information provided within this application package is complete and
accurate.
• The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the
subject property.
• If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the
conditions and limitations of the approval.
gooA- r..y g4ig; rcm Jeremy Sprague 02/04/2022
Appliis or ad&rtizled agent's signature Print name Date
Property owner's signature (if required) Print name Date
STAFF USE ONLY
Case No: aFl2o2z-000as Permit fee:_$ S&V '�7 Received by: Nr Date: 2/ano2s
Approved by: Date: Notified by: Date: Z[49JEo2'Z
City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov 503-718-2421 • Page 2 of 4
DEVELOPMENT ENGINEERING FEES
Public Facility Improvement(PFI) Permit:
INITIAL PFI PERMIT FEE
Part 1: Required submittal fee is 101/o of the Net PFI Permit Fee.See below for calculations.Minimum of$300.
NET PFI PERMIT FEE
Part 2: All non-water system improvements engineer's estimate X 7% (less the initial PFI Permit Fee).
WATER LINE CONSTRUCTION FEE
Part 3: All public water system improvements engineer's estimate X 12%.
FOR ONLY • ONLY
TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3:DETAILED SUBMITTAL
CHECKLIST REQUIREMENTS
Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch
showing:
Under the wireless facilities standards,is the proposal ❑ Dimensions
considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name
How many install sites are proposed as part of this permit Site Address
application?
TYPE 3-Must provide 4 sets of plans (sized 24 x 36
or 22 x 34) and an electronic version of all submittal
The proposed equipment is located on which of the following: items. The plans must that include:
❑Public Right-of-Way ❑Private Property
❑ Cover—Site,Vicinity,Abbreviation,Legend
If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.)
type&use: ❑ Street(Plan,Profile)
❑ Water,Storm and Sanitary(Plan Profile)
❑ Water Quality Facilities
❑ Grading
❑ Landscaping/Tree Plan
❑ Composite Utility Plan(Electrical,Phone,Gas, Storm,
Sanitary,Water,Signage,Street Lights,etc.)
❑ Details
❑ Traffic Sight Distance
❑ Signing and Striping
❑ Street Light Plan and Photometric
❑ Engineers seal/signature
❑ Sheet label(project land use name,revision and plan
log block,dates and sheet numbers)
❑ Engineers Construction Estimate
Additional Submittals
(per land use conditions,if applicable)
❑ Traffic Report
❑ Storm water Drainage Calculations
❑ Geotechnical Report
❑ Preliminary Access Report(Sight Distance)
❑ Proposed Plat
❑ Pathway Design
❑ Water Provider Approval
City of Tigard 13125 Six'Hall Blvd, Tigard,Oregon 97223 • www.tigaid-or.gov • 503-715-2421 • Page 3 of 4
Edge of Pavement
I -0— Ditch
n Streetlight I —•—•—•—•—•—•—•TT—•—
I I
i YI—Fropo� WTL—erTi iF" I
I 1
I1r I in! ! Existing House 1
d I V1 I Existing 1
11 • Driveway
�I I 'r I 1
Q.I
-E I 1
� � 1
dl 1 1
Existing Shop
I Cr jy i
L y
Power`` 1 0 l e
I�
L95'
�iopeZryLme----t(FH)
� I I
1 ! Scale: 1•=30•
I I I
TYPE 1 AND TYPE 2:
MINIUM SKETCH
I I !
' � I
I I i
REQUIREMENTS N/Anot 1 1
North arrow Property lines&dimensions Existing utilities locations
(sewer,storm,water)
Street&street names All existing structures
Proposed work Existing curb or edge of pavement Utility&street light poles
Existing S/W or D/W apron Slope of property Trees
Cityof Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 0 www.tigard-otgov 503-718-2421 • Page 4 of 4
SINGLE FAMILY LEGEND
NEW PGE FACILITIES TO BE INSTALLED
ewc
(UNLESS OTHERWISE SPECIFIED)
u NAB axs wos assn REMOVEFACILITIES INSTALL FACILITIES
g •„73 -- 504PGE SWITCH VAULT,WITH 55.W2P-PGE TOP,
t PROVIDED&INSTAII DBYCUSTOMER
To
ALL
PGE TO INSTALL 14 WAY LATERAL TAP
a CDSTd'ER TO UFATE SPLICE AONKVA 4250-212STRANSPAD.PGE
y BTAND EXFOSEFRIMARYYIRE PAD MT ■ PROVIDED&INSTALLED BY CUSTOMER
PGE TO SPLICE AAU ENERGIZE 7200V,121x240V,10,3W
PDM Q FAULT INDICATOR
AW 120.24W Issa INSTALL 142 AL-EPR JKT PRIMARY IN 7 PVC CONDUIT
J2pAMP PROVIDED&INSTALLED BY CUSTOMER
E HPIAC.3 TON _
esus �E plrywlla 160%VD PROVIDED B INSTALLED By CUSTOMER•PYD CONDUIT
nw + 119024AARO 142 PVC CONDO IT FOR GOLD TEMP
PROVIDED&INSTALLED By CUSTOMER
W4
M! SPLICE2��`
>a C21-ICA �EASEMENT REQUIRED
6 M
021.148
n
FOai Aft M
aw
�pgQoo Lx
RIGHT-OF-NMY PERMIT NOTICE.
m 5 nxA PERMIT-NOM ITS I 000L A PR IS TI
IBr.ECUIRm q'• E E ARR y dJEE aFCauCa ONLY
EXE<pwgrFD
iaFC CpRI LE
NMS IFSOEffX4OT WIT LGE WILL HE A1aN£
T1AORE f WEU OW N Fy THE LOCUL FTEEM 9OCLICNINMIIT
BEFpiE WCRN 1S iOPFGIN RCO%Ci TIE FERMRNUATMpI BITEMRA
.PERMIT
CONSTRUCTION NOTES: SFEXT
1-%�MLyHE�61FEfEPOGRYyBVEIKµLHOOF�ONALLiiOTRRPILLNG.1RBgITOBE
�[ }R/JISFdiNER°M 0.L fLNWRE MlM°RIIL� Ys( LEtA4lEg1gIGLGRREf.
MHVBCMAYIE°aSK R°Hp2125 `METGCETERMOMMOURREENINETFES AA NVMEER_6 WIINNBREWIRE
e CfEP(MINI AN�AptCE WM/JNt]VEgiCAL NCTRUTIONryEBAND]1XCiIALLELHOMINTO�OMKK1MEIE^R �ASEBEtt.EEN
ALLBENOSMVSTBEFACTORTYMILE.RGICBTEELON DFipERAIAMS
ffw6 YtEREWIREDFCR gIM9 ff I51 Fi£r IXi LpY£R FOR aiV fNY LENGTH
1'14b' RJII VAIH M[TEIINN I®LEGREE6HffF16R LAIRULULLOBEIASME
HRRIN. ACCO EMRL,NSOIILXFE ORUIU THE MAXIMUM TOTAL BENDS IN ANY
DECFEES
2 ARGESm4iDBIC IBRE IRM FpICPENIFG ENEh EEDFGE VMAie
504-PGE VAULT .4 n RIES INTSUDIwawgecTCN CA Ns1ALUTlw
5IFM2PfGE DIAMOND PLATE DOOR I N 3. m sn�IE1M.AAcaE° ON AT MAL. .
C RMM A
CCYCIIr A r OBTONER REHCI.L4NC F FMATH°6YN� I.WO`LVGPAY 9tl1EtllEA°,
e ER6T!µW/LE,%EGQIWIINTA NYLCN FLLLBrR NG61Y N.rm1ffi.IEHTI.
BET ATIM-AIWB 'GWTN EELUYkM .ptyPEM LENBPY RIYETIMEF.E�g1Cy
REIROMDBrwE. faovtoF PnD n Gmli;, T wLM Fr
'E CGNECT.'Qtl L7 iVEiOHVE7 f"ORE SMALL MEET THE
M' zrOROE uom 'r'. LnvH LAVAL.aLE rn"REaLTHREEsPROD Pc-mOECT
rtET aT 1H WGEa UAR s/iET"RE/.sOMS THE UAL OHALL BE 3UU M EWAI.r awaE
GgrOE E"XrYaI bREDSTRAESVAHIRY lAASPEaFUTONSEOa.REMENHr MnI�LTESTo=
p4C wPrmL>:DBYPGE —{ DQE nz IB REwaeU AFTER ws,ANAnGN U.UAININOTa1FR WT
mw cqO�
2�
cel°W� SINGLE PRIMARY TO EMENDAMINIMW OF 10 FROM
I P ' y GVC 4TMEEN 9^NINIYJM IFUNSO2MEP T'ID.
Q O Q AAttii& 6 ALL NETf4wFIXiM9L9 TOeE R13111If°BFEET MINI FgC4IINY WRMµl75}IBLE
(\ NSTAg EOI IH �ILp�W:.WHLWGWiH4VG AIFJAFEEiM FIl
ry�N�iE _ SINGLE-PHASE TRANSFORMER PAD- - ws ORMERO M.Isr eE w�THIN,s FE�r`c� wrvEnBiiauEa
BTRMGNEP`�al R.c CONDUIT CONFIGURATION „MAI FARANCF IN m°RYTcs ALL-NARIOPMERS
00 O ?� RwM sae `_ice Ro°vEwl eniniu aeaETON°ro rErtG- IrWiLwivlar�lrEm
O O /fl x Lc°"1EmL`v rOAlwmrAOwre Foil I BmpYopmL�xMLT A�p�gp
YrYIMMe Oe o� to LEGEND PD-73 HUFRn'GRBL°"siw°prDmiMBTPr"'IiFr00 WVO`RE PI AT YIAwrVJN4 TCQ9r TOT4fT101lgElE
sr VT-72 PGEGTneIy, ..
�aat1 ,,• OO B,md.M1 G.Y.
My D
T� a T.a°rury PG CONSTRUCTION DRAWING
VICINITY MAP +P ®�`"" AS-BUILT VERIFICATION&NESC VIOLATIONS CORRECTED
CONTACT SERVICE COORDINATOR TNe d..rRSRLRmuratey N,PNs,Rh FIELD CORBIrUDIIm.
,zMM OeM�.dM FGraman: Data:
FOR TRENCH AND CONDUIT INSPECTION PRIOR
U, sAMuse TRmnvuoox TO BACKFILL PGE WILL NOT INSTALL WIRE
,, ,^.p • UNTIL TRENCH IS+00%BACKFILLED. O1re.2132022Uws ACODUIT.1070001 ANO'100(g04591 ''OB HO M3055635
JOB SITE rANY DEVIATION FROM THIS DESIGN MUST SERVICE COORDINATOR TITLE
4e BE APPROVED BY PGE PROJECT MANAGEq 503-323-6700 OR ROD-i47-ft.R1R ` GRwai,IRMIno,lom slxE
o:Ra.�R Y. AnEwroN: CALL 811 BEFORE YOU DIG /�� KING CITYSUMMERFIELD 17X22
� ' OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED Lauiw.
BY THE OREGON UTILITY NOTIFICATION CENTER. / 1 ARDOR37224
H I N K THOSE RUES ARE SET FORTH IN OAR 962-001-0001
SAFETY THE RULE 9 10CeI I I W THE MAY OBTAIN
CO IES OF M TK a 320a l CT0 OW:
UG xry ce One Nome•Tem NeedM am
FIRST BFAVERTDN
NOTIFICATION CENTER
ADMINISTRATION UNECREW CENTER WASHINGTON 021148 C2114A Tai
TO REQUEST UTILITY LOCATES CALL THE OREGON rtsGry VE RHmeIBD+l manN Br
UTILITY NOTIFICATION CENTER,811 AT LEABT NIISx MMYs below. �,B«IB.IDw JGse Velasco 503 8]2-5484 SUJATHA NARAYANAN
2 BUSINESS DAYS PRIOR TO EXCAVATION. 0811aYa aA' euveRrmaRwum O PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED
Page 80 2011 Edition
5.3 Two-Lane, Two-Way Roads
Shoulder Work w/ Minor Road Encroachment Diag. 300
Use this detail for non-freeway work which extends into a travel lane and
maintains a minimum 10 foot travel lane. If a minimum 10 foot travel lane
cannot be maintained, or when traffic cannot safely pass by in both lanes
simultaneously, use the appropriate lane closure diagrams—for example,
Diagrams 310 through 350.
A lane closure may be appropriate for conditions such as high traffic
volumes, high speeds, and inadequate approach sight distance to the work
space, or heavy equipment adjacent to the travel lane.
1. Use truck-mounted flashing warning lights on work and protection
vehicles. See Section 4.3 —Lights and Lighted Signs for exceptions.
2. For added visibility, a truck-mounted arrow board or PCMS in caution
mode may be used.
3. Cones shall be placed along the entire length of the work space. If a
protection vehicle is used and work is in place one hour or less, the
taper and tangent devices may be omitted.
4. If the speed is 45 mph or higher, volumes exceed 2000 ADT, or there
is limited sight distance, consider placing cones or tubular markers on
centerline.
5. An arrow board in caution mode or truck-mounted PCMS with
"SHOULDER WORK" or other appropriate message may be used for
higher visibility.
Sian Spacing and Buffer Lengths(feet)
Posted Spacing Between Signs "Buffer"
Speed A B C Space
20 50
25 100 100 100 75
30 100
35 350 350 350 125
40 150
45 180
50 S00 500 500 210
55 250
60 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 81
Shoulder Work w/ Minor Road Encroachment Diag. 300
ROAD
AHEADWORK � 1 1•
aA •
Sign'
•
(OptionaD •
Protection Vehicle
w/TMA(both Optional)
See Chapter 4 • Bu(ror
10'
minimum •
•
A ROAD
NARROWS
(Optional)
B
1 tZ ROAD
VAHEAD
Initial
Warning
Sign
September 2016 Chapter 5
Page 52 2011 Edition
Bicycle and Pedestrian Accommodation Diagrams
The following practices and details address the accommodation of bicycles
and pedestrians within work zones. The following detail drawings should be
incorporated, where appropriate, into the traffic control plan for any short
term work.
1. See Section 1.6—Bicycle and Pedestrian Considerations for additional
guidance.
2. Stay alert for pedestrians and bicycle traffic and accommodate safe
passage for them, as needed.
3. The work space should be protected from bicycle and pedestrian
intrusion by using barricades or closely-spaced channelizing devices.
4. Maintain access to transit stops or clearly close a transit stop using
barricades or channelizing devices.
Bicycle Accommodation Diagram 6-6
Bicycle Accommodation Principles:
1. If a significant volume of bicycles can be expected and work closes a
marked bicycle facility, or requires bicycles to share a travel lane,
install a"(Bicycle) ON ROADWAY"sign (CW11-1) or the Bicycle
symbol (W11-1) sign with an "ON ROADWAY" (OBW1-5) rider, in
advance of the work area.
2. Install temporary signing off the paved shoulder, within the planter
(buffer) strip, or share the width needed between the shoulder and the
sidewalk, as available.
3. Signs are to remain in place until the surface is restored and the width
made available for bicycle use. See Diagram 5-6 for typical bicycle
signing placement.
Slan Spacing and Buffer Lengths(feet)
vosftd Spad Bhtw«n9 "eun.r
Spsed A 8 C
I0 so
25 100 100 100 75
30 100
35 350 3S0 350 125
40 150
45 180
50 Soo 500 500 210
55 250
60 285
65 700 700 700 325
70 365
Chapter 5 September 2016
2011 Edition Page 53
Bicycle Accommodation Diagram 5-6
I I
I
NOTES:
• Bicycles on Roadway(CW11-1)sign should not
interrupt standard sequences. For example:
o BE PREPARED TO STOP/Flagger Symbol
o _LANE CLOSED AHEAD/Lane Ends
I Symbol
Bicycles on Roadway sign typically follows ROAD
I
WORK AHEAD sign and used as general warning.
I
I
I
1
I
I Oil
I � I
I I A
I I
I I
I I
I I
I I
I I
I I A
I I
I I
I I�—
I I
B
I I
I I
I I
ON
ROADWAY
I I
C
I I
ROAD
I� WORK
AHEAD
September 2016 Chapter 5
Page 54 2011 Edition
Pedestrian Accommodation Diagrams
See Diagrams 5-7 and 5-8, below, for pedestrian accommodations in work
zones.
Pedestrian Accommodation Principles:
1. If the work impacts the sidewalk or pedestrian facility, provide a safe,
accessible path, where practical, in accordance with the requirements
of the ADA.
2. If not practical to match the width of the existing pedestrian facilities,
maintain a 4-ft minimum width.
3. Unless a reasonably safe route can be provided through the work
space, pedestrians should be appropriately directed with advance
signing to cross the road. Do not divert pedestrians into travel lanes.
4. Install pedestrian closure or detour signing on Type II barricades.
Make every practical effort to satisfy the following:
• If work closes a sidewalk or sidewalk ramp, close sidewalks at a point
where an alternate crossing point or route can be provided. Minimize
the amount of out-of-direction travel for pedestrians.
• Use a combination of"SIDEWALK CLOSED" (R9-9), "SIDEWALK
CLOSED USE OTHER SIDE" (R9-10), "SIDEWALK CLOSED AHEAD
CROSS HERE" (R9-11), and "SIDEWALK CLOSED CROSS HERE"
(R9-11 a) signing to direct pedestrians to an alternate facility.
• Where there are business destinations between the nearest crosswalk
and the work area, close the sidewalk at the business access nearest
the work area, where practical using the SIDEWALK CLOSED sign.
Include the SIDEWALK CLOSED AHEAD CROSS HERE sign at the
nearest crosswalk prior to the closure.
Chapter 5 September 2016
Page 56 2011 Edition
Pedestrian Accommodation, Intersection Diagram 5-8
For work near an intersection, close crosswalks and/or sidewalks as
necessary when safe passage cannot be maintained.
SIMW.
USE Q~I�FA SIM
24x12
Type'W1'
(Mount on B(II)LR)
ROAD
WORK
AHEAD
(Optionaq —
aoEw.ixaoem
aoEwwca.oem ossa HEnE
use olnea sloe i� SIDEWALK 24x12
24x12 CLOSED Type'Wt'
Type'W1" 24x12 (Mount on BOI)LR)
(Mount on B(II)LR) Type"Wt"
(Mount on B(II)LR)
• aoewuxcweED
AXEM
CAP99 H6iE
24x18
Type'W1
(Mount on B(11)R)
ROAD
WORK
AHEAD/
(Optlonaq
Chapter 5 September 2016
Page 54 2011 Edition
Pedestrian Accommodation Diagrams
See Diagrams 5-7 and 5-8, below,for pedestrian accommodations in work
zones.
Pedestrian Accommodation Principles:
1. If the work impacts the sidewalk or pedestrian facility, provide a safe,
accessible path, where practical, in accordance with the requirements
of the ADA.
2. If not practical to match the width of the existing pedestrian facilities,
maintain a 4-ft minimum width.
3. Unless a reasonably safe route can be provided through the work
space, pedestrians should be appropriately directed with advance
signing to cross the road. Do not divert pedestrians into travel lanes.
4. Install pedestrian closure or detour signing on Type II barricades.
Make every practical effort to satisfy the following:
• If work closes a sidewalk or sidewalk ramp, close sidewalks at a point
where an alternate crossing point or route can be provided. Minimize
the amount of out-of-direction travel for pedestrians.
• Use a combination of"SIDEWALK CLOSED" (R9-9), "SIDEWALK
CLOSED USE OTHER SIDE" (R9-10), "SIDEWALK CLOSED AHEAD
CROSS HERE" (R9-11), and "SIDEWALK CLOSED CROSS HERE"
(R9-11 a) signing to direct pedestrians to an alternate facility.
• Where there are business destinations between the nearest crosswalk
and the work area, close the sidewalk at the business access nearest
the work area, where practical using the SIDEWALK CLOSED sign.
Include the SIDEWALK CLOSED AHEAD CROSS HERE sign at the
nearest crosswalk prior to the closure.
Chapter 5 September 2016
2011 Edition Page 55
Pedestrian Accommodation, Mid-Block Diagram 5-7
The sidewalk should be closed at the nearest intersection on each side of the
work area when a safe,ADA-compliant path through the work area is not
available.
sEEwux cwaED RiDevuxc�em
or A E�
CROBg HEP
C11OB8 HERE
24x12
Type V1 24x18
(Mount anB(II)L) Type'W1"
SIDEWALK
CLOSED
24x12
Type'W1-
(Mount on B(II)LR)
(2 Regd.)
siDewuxanem aioEwwcc�
or J EA0
CROBB HbIiE ~
HERE
24x12 24x18
Type"W1"
(Mount on B(II)R) Type-W1-
September 2016 Chapter 6