Loading...
PFI2022-00028 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT COMMUNITY DEVELOPMENT Permit#: PF12022-00028 Date Issued: 02/04/2022 • 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Parcel: SEG3528 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job#M2935825 Project Description: PGE to replace pole 5996. PGE to install new overhead line and remove old facilities. PGE to remove/install guy wires and anchors and upgrade a transformer. SEGS 3528, 3529 Class of Work: FEES Type 1 -Utilities (gas, electric,data) Description Date Amount PFI Permit Fee 02/02/2022 $300.00 Total $300.00 Owner: REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE. Tigard website at www.tioard-oLgov to schedule inspections online. Contractor: PHONE: Applicant: MEAGHAN MILLER 2213 SW 153RD DR BEAVERTON, OR 97003 PHONE: 5036122873 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: &UL 4/vt& Special Conditions(See Attached) Note: THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12022-00028 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA, current edition, American Traffic Safety Services Association [ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices, flag persons,etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services: 503-629-0111 (Tigard Police Dept.,Tualatin Fire& Rescue)and to 503-962-8140 (Tri-Met)and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13- DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules maybe obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15- UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.)as may be necessary, as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms, conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI—Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property comers, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two(2) persons who have authority to resolve problems,take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing, of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other City of Tigard PFI#: PF12022-00028 ENGINEERING DEPARTMENT • . Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: PGE Job # M2935825 8 TYPE 1—Franchise Utility Work Brief description of project: PGE to replace pole, 5997. PGE to performed byNWN,PGE, or utility agency install new overhead line, and remove old facilities. PGE to ❑ TWE 2—ROW Sidewalk/Driveway/Sewer remove/install guy wires and anchors and upgrading a transformer. Work performed for the purpose of • Sidewalk installation or repair - Driveway approach installation and repair SITE INFORMATION - Sanitary sewer lateral installation and Location (address if available): 10455 SW 87th Ave main line tap ❑ 'TYPE 3—Full Scale Development Work Tigard, OR, 97223 performed with land use approval which includes any of the following. • Subdivisions or Partitions APPLICANT INFORMATION • Streetwidening Name: PGE [Submitted by Jeremy Sprague] • Mainline installation for sanitary sewer, storm sewer, Tigard water, and Tigard Mailing address: 2213 SW 153rd Dr water service area city/State: Beaverton/OR Zip: 97003 ❑ TYPE 4-Small Cell Technology Phone: (503)-672-5446 ❑ TYPE 5-Tigard Triangle Email: cre'000rdination-western@pgn.com Phone: NOTE: Type ] and 2 applications may be Contact name: Meaghan Miller emailed to rowpennitsnrigardor.gov. Phone: (503) 612-2873 Email: crewcoordination-western@pgn.com CONTRACTOR INFORMATION 2 Same as applicant Name: PGE CCB Number: Mailing address: City/State: Zip: Phone: Email: ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of woxkis required(if over$5,000):$ $7,000 (within the public right-of--way) Is work related to a LAND USE DECISION? ❑Yes Ell No Case number: City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 - www..tigaid-or.gov 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I,the applicant,certify that: • To the best of my knowledge, all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. S� Jeremy Sprague 02/01/2022 Applic is ora orized agent's signature Print name Date Property owner's signature (if required) Print name Date Case No: PFI2022-00028 Permit fee: 3M Received by: SPgV Date: 2/1/2022 Approved by: Date: Notified by: Date: Z 22 City of Tigard 13125 SW Hall Blvd. • Tigard,Oregon 97223 www.dgard-or.gov 503-718-2421 Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 101/o of the Net PFI Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part2: All non-water system improvements engineer's estimate X 7%(less the initial PFT Pemiit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR ONLY • ' STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1-3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit El Site Address application? TYPE 3-Must provide 4 sets of plans (sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Coves—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes (City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities ❑ Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature ❑ Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) ❑ Traffic Report ❑ Storm water Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard 13125 SW Hall Blvd. Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 3 of 4 Q cnv " y - (:� i Edge ofPevemenl I I f— Ditch Streetlight I —•—•—.—•—•— — —C—•— 1 > ' i'�rop'os �erTIR��' i QJ I ! in Existing House Existing 1 i1 Driveway I =r � I oI ^ aof l ^ I i i cr, '' i OI Existing Shop I I = i L ' Power= l I oI � I� 95' L.— � 3rroper -Line—.—.—. I I Fln :ant(FH) �1 Scale: I I 1 TYPE 1 AND TYPE 2: MINIUM SKETCH REQUIREMENTS (Put N/A if not I I I ' I I � I rr North arrow _ Property lines&dimensions Existing utilities locations (sewer,storm,water) Street& street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees cite of l'igard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 • Page 4 of 4 18534 16535 WL2 OVERHEAD LEGEND 30'-4 30,E PL 5998 NEW PGE FACILITIES TO BE INSTALLED 1887 1986 INSTALL (UNLESS OTHERWISE SPECIFIED) N OAK WAY 18533 1 P 25kVa OH 120240 7.2 30'-44 ACCOUNTS T 0..................... _ _ REMOVE FACILITIES INSTALL FACILITIES X o 1987 ; 15 18545 1278Kyy •• 155 161 Al-LS-17,8240 INSTALL ADDITIONAL FACILITIESpMODIFY FACILITIES 30' 599 825 Gig-NEU-11,7950 TRANSFER: POLES 10387 10385 x' 1968 � Q G16-PRI-8,0470(70 NEW 193' x vo ANCHOR) HT-CL POLE CLASS (1,2.3.4.Ht,H2,S) .77%VD A OLE HEIGHT (FEET) REMOVE WL 1 3.04%FLKR : PL 5997 B5• ( 1 P 15kVa OH 120/240 7.2 FRAMING Tnee Mmming mid-span for ne INSTALL' TRANSMISSION 6DISTRIBUTION (SEE CODES BELOW PL 45'-3service7 EASTD10 FRAME DISTRIBUTION-LC10710,M00010 010 '1'SOUTH •'•38'•••• m' 10140 (1 PH 2 SGL.DE,POLY) Al-IT-11,5740(SOUTH) N; G18-PRI-5,813010455 1990 Q�Q� CONDUCTORS G16-NEU-6,7440 A1-5'-18,1220(SWq .......... INSTALL 2-02 AL TX SERVICE G19-ABOVE NEU-16,1220 N �� J REMOVE 2-02 AL TXSERVICE REMOVE m m2 Co .......... INSTALL I-210 AL-PLAC SECONDARY PL 40'-3 C,1! -351 __........ INSTALL 1-2/0 AL-TX SECONDARY Q J J 1 Al 8805 Z 1 G16 _ Landscape dear out blackberries ----------__, so91 389 y 877 25'-5 387 PGE OWNED POLE 197i 1971 45'_3 ANCHORS x x (5 uTO COMMIS 391 5w7 431007 ABC 336 ACSR 1998 'RANSFER 45'_3 453 _ a JMM(S).PGE 1970 N 4 CU _ a a o a 388 — (LEAD) o 6 o N A_ (LBS) 45-3 10 28771 1995 43 ANCHOR CODE Al A3 AS A7 A8 00 A\ SW OAK ST C 10 50-4 GUYING 1220 1997 VICINITY MAP _ (POS.-LBS.) a m RIGHT-OF-WAY PERMIT NOTICE: - 1 GUY G1 G4 G7 G1 0 31( 1 22 A PERMIT FROM THE LOCAL JURISDICTION IS REQUIRED BEFORE ANY 2 GUYS G2 G5 GB G113U32W23 WORK IN THE RIGHT-OF-WAY MAY BE PERFORMED. ONLY PGE APPROVED CONTRACTORS AND CONTRACTORS WHO HAVE MADE OTHER SPECIAL 3 GUYS IG3IG6IG9r12PIqG21P24 AGREEMENTS WITH PGE WILL BE ALLOWED TO WORK UNDER POE'S PERMIT. PGE CONSTRUCTION DRAWING THE CONTRACTOR MUST NOTIFY THE LOCAL JURISDICTION 48 HOURS BEFORE WORK IS TO BEGIN.A COPY OF THE PERMIT MUST BE ON SITE. DATE: 11/19/21 6CALENi5 ACCOUNT:1070001 IAMOO00017443 "NOM293562 TITLE ANY DEVIATION FROM THIS DESIGN MUST PGE FITNES 8E APPROVED BY PGE PROJECT MANAGE /` CIRCUR 5I2E West Portland-North nAn 10455 SW 87th A.vd ATTENTION: CALL 811 BEFORE YOU DIG PGE/ ED TION OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED 10455 SW 87th Ave.,Tigard Tigard,OR 9722 THINK BY THE OREGON UTILITY NOTIFICATION CENTER. DESCRIPTION THOSE RULES ARE SET FORTH IN OAR 952-0111-0010 , ` Replace B/0 Pole 5997 Relocate service for 10455 SAFETY THROUGH 952-001-0090.YOU MAY OBTAIN COPIES OF COUNry ECTION(S WORK WITH SHEET Ir^� p a�prry THE RULES BY CALLING THE OREGON UTILITY FIRST'( NOTIFICATION CENTER ADMINISTRATION C (503-232-198 Washin ton 1 I oFI LINECREWCENTER DESIGN By PH ONE DRAWN BY .1 TO REQUEST UTILITY LOCATES CALL THE OREGON Koowwharl6elow. Meaghan Miller 541-510-1970 MeaghanMiller - UTILITY NOTIFICATION CENTER,811 AT LEAST Cull 6elore oo di 2 BUSINESS DAYS PRIOR TO EXCAVATION. T 9 0 PORTLAND GENERAL ELECTRIC CO.-ALL RIGHTS RESERVED Page 118 2011 Edition Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs "Buffer" Speed A 8 I C Space 20 50 25 100 100 100 75 30 100 35 350 350 350 125 40 150 45 180 50 500 500 500 210 55 250 60285 65 700 700 700 325 70 365 Chapter 5 September 2016 2011 Edition Page 119 Lane Closure at Intersection with Flagging Diagram 620 r� N1ER0 EV ° 4 t INFM B i PiEp N • B A ovEa En • E I•ot YEIL •• P1EP NOPK 1 ,o ° • A B B c B~ H F F K � • loot M•t� C B B A T ROAD W . I loot M•c (OPK-m A B P11EY m eror B LWE 4 t September 2016 Chapter 5 www.invarion.com Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The "ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs Buffer Speed A B C Space ERRATA: 20 50 25 100 100 100 75 Supplement Table 30 100 35 350 350 350 125 1 Updated:February 12, 40 1 150 2016 45 180 By ODOT Traffic-Raodway 50 500 500 500 210 section 55 250 Signs Spacing and Buffer Lengths (feet) Supplement Posted S acing Between Signs "Buffer" Speed A B C Space 60 285 65 700 700 700 325 70 365 www.invarion.com Lane Closure at Intersection with Flagging Diagram-6-2 0] ROAD 4AHEA ORK (Optional) B BE PREPARED TO STOP B A 0 0 100 ft.Max. O O Buffer O 0 0 0000 ® o 100 K.Max. C B B q T g4, O T BE REPARED O 100 ft.Max. TO STOP p (Optional) A B BE PREPARED TO STOP B (Optional) ONELANE l RDAO AHEAD C ROAD WORK AHEAD www.invarion.corn Bicycle Accomodation Diagram 5-6 Bicycle Accommodation Principles: 1 . If a significant volume of bicycles can be expected and work closes a marked bicycle facility, or requires bicycles to share a travel lane, install a "(Bicycle) ON ROADWAY" sign (CW11-1 ) or the Bicycle symbol (W11-1 ) sign with an "ON ROADWAY" (OBW1-5) rider, in advance of the work area. 2. Install temporary signing off the paved shoulder, within the planter (buffer) strip, or share the width needed between the shoulder and the sidewalk, as available. 3. Signs are to remain in place until the surface is restored and the width made available for bicycle use. See Diagram 5-6 for typical bicycle signing placement. Sign Spacing and Buffer Lengths (feet) Posted Spacing Between Signs Buffer Speed A B C Space 20 50 25 100 100 100 75 ERRATA: 30 100 Supplement Table 35 350 350 350 125 40 150 Updated:February 12, 45 180 2016 50 500 500 500 210 By.oDOT Traffic-Roadway Section 55 1 1 250 Sign Spacing and Buffer Lengths (feet) Supplement Posted Spacin Between Signs "Buffer" Speed A B C Space 60 285 65 700 700 700 325 70 1 365 www.invarion.com Bicycle Accomodation Diagram 5-6 NOTES: - Bicycles on Roadway (CW11-1) sign should not interrupt standard sequences. For example: - BE PREPARED TO STOP/Flagger Symbol - LANE CLOSED AHEAD/Lane Ends Work Symbol_ - Bicycles on Roadway sign typically Follows ROAD Area WORK AHEAD sign and used as general warning. I A i i A I I B It ON ROADWAY I C ROAD WORK AHEAD