Loading...
Permit 1111. CITY OF TIGARD BUILDING PERMIT g. COMMUNITY DEVELOPMENT Permit#: BUP2021-00303 Date Issued: 1/18/2022 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S112ACO2000 Jurisdiction: Tigard Site address: 14915 SW 72ND AVE Project: Portland Construction Solutions Subdivision: None Lot: None Project Description: A new 500 sq.ft.deck. Contractor: PORTLAND CONSTRUCTION SOLUTIONS Owner: GLASS HOUSE INVESTMENTS LLC 14915 SW 72ND AVE 14915 SW 72ND AVE TIGARD, OR 97224 TIGARD, OR 97224 PHONE: 503-908-9822 PHONE: FAX: 503-336-6557 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 01/15/2022 $271.43 Occupancy Grp: B Occupancy Load: 0 Demolition 12%State Surcharge-Building 01/15/2022 $32.57 Dwelling Units: 0 Plan Review 12/07/2021 $225.86 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 01/15/2022 $110.00 Bedrooms: 0 Bathrooms: 0 Info Process/Archiving-Lg$2.00(over 01/15/2022 $12.00 Value: $12,820 11x17) Plan Review 01/15/2022 $-49.43 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 500 Garage: 0 Mezzanine: 0 Total $602.43 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: _airti../�y1 Permittee Signature: L-/ y- // ✓ /�� all 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. N., Building Permit Application ca. 31 2 Commercial RECEIVE I FOR OFFICE USE ONLY Il Cityof Tigard Received �r ' � • 13125 SW Hall Blvd.,Tigard,OR 97223 AUG 31 2021 DateBy: 12/7 0�t Ear Permit No.: Uram/ g Plan Review q Phone: 503-718-2439 Fax: 503-598-1960 CITY OF TIGARD Date/By: jc9% pL$"vL) ` Related Permit: TIGARD pi Inspection Line: 503-639-4175 Date Ready/By: i Juris: ® See Page 2 for Internet: www.tigard-or.gov BUILDING DIVISION Notified/Method: i j Supplemental Information TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction 0 Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement izi Other: Exterior Deck equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ,Commercial/industrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 14915 SW 72nd Avenue New dwelling area: square feet City/State/ZIP: Tigard, OR 97224 Garage/carport area: square feet Suite/bldg./apt.#: Project name: PCS Decl/Arni /,_,,r Covered porch area: square feet Cross street/directions to job site: �l IA.- r1'_r Deck area: s. JQ� square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot#: Permit fees*are based on the value of the work performed. p/p 2S112ACO2000 Indicate the value(rounded to the nearest dollar)of all Tax ma arcel#: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on is a plication. New exterior deck to be added to the rear of an existing commercial building Valuation: $ g-�gg ha Existing building area: square feet New building area: square feet 0 PROPERTY OWNER 0 TENANT Number of stories: Name: Type of construction: Address: Occupancy groups: City/State/ZIP: Existing: Phone:( ) Fax:( ) New: APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: Advanced Structural Forensics Structural plan review fee(or deposit): im, Contact name: Ken Oliphant FLS plan review fee(if applicable): Address: 1500 NW Bethany Blvd, Ste 200 Total fees due upon application: 3-y��- )'-7 City/State/ZIP: Beaverton, OR 97006 �'o Phone:(971 )645-7559 Fax::( ) Amount received: E-mail: ko@asf.expert PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted Photo Voltaic Solar Panel System. Business name: Portland Construction Solutions Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address: 14915 SW 72nd Avenue Solar Installation Specialty Code checklist. City/State/ZIP: Portland, OR 97224 Permit fee(includes plan review $180.00 and administrative fees): Phone:(5O3 )908-0822 Fax:g ) State surcharge(12%of permit fee): $21.60 CCB Lie.: 174542 / ( Total fee due upon application: $201.60 Authorized signature: / / G�1 This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: Ken o liphant Date: 8/20/21 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits :UP COM_PetmitApp.do Rev.04/21/2014 440.4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT _ Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. Not applicable. Deck is (1) Every project for renovation,alteration or modification to affected buildings and related not additional building facilities shall be made to insure that the path of travel to the altered area and the restroom, area. Additionally, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. accessible upgrades were completed with PCS (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to tenant improvement. the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP COM_PermitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT _ " Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. •Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional,drawn to scale and labeled with: A. ❑ map Sc tax lot# ❑ project name ❑ site address ❑ suite number ❑ zoning 0 applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking,including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans,details and specifications. J. Accessibility barrier removal worksheet. K. Deposit- based on valuation of project. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new,additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing(site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing(building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval,the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire& Rescue),if applicable. 1:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard ® COMMUNITY DEVELOPMENT DEPARTMENT T1cARD Building Permit Review — Commercial - With Land Use A Building Permit #: BUP2O21 -003O3 Site Address: /W c IC SW -i-Zwp AY Suite/Bldg#: Project Name: PeS tt-G%% (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: ps-tm C 0 Dx- Drift'site address/suite# exists and active in permit system.stm. . River Terrace Neighborhood: ❑ Yes L2'No ❑ Land Use Case#: M M 17ZOr2% - C> 6 3-1 gni Plansatch Approved Land Use: Fr Site Plan ❑ Landscape Plan ❑ Other: 1 ❑ Urban Forestry Plan ❑ Elevation Plan Cuilding Height: Maximum Height Actual Height onditions Met: ❑ Prior to Submittal ❑ Prior to Permit Issuance oPr[1:1 Business License: Exists: ❑ Yes ❑ No,applicant was provided a business license application lo L ] Public Facilities Improvement (PFI) Permit: Required: ❑ Yes,applicant was notified ❑ No Applied For: ❑ Yes ❑ No, stop intake Notes: Approved by Planning: Date: 2 7 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal l Original Submittal Date: 0.6,1/i--/ Site Plans: # Building Plans: # 9 Building Permit#: Q'Enter building permit#above. Workflow Routing: R' Planning Q' Engineering [ Permit Coordinator H Building Workflow Sign-off: [Sign-off for Planning(include notes from planning review) Route Application Documents: Q"Building: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: Date: Z I:\Building\Fonns\BldgPermitRvw_COM_WithLandUse l 11819.docx Engineering Review • Slope at building pad: CrPFI Permit#: i A • Conditions "Met"prior to issuance of building permit 'asements (encroachments)per engineering conditions of approval and plat (not typical on SDR/CUP) Lr Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes if?"-No Assess Water Quantity Fee in-lieu: ❑ Yes ["-No LIDA Facility on lot: ❑ Yes 2-"No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: }�. risi4 g2 Date: IL- -2vzt Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review IA Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes yr N/A Tigard Trans SDC: CI Yes Yes /`� N/A Parks SDC: ❑ Yes N/A OK to Issue Permit Approved by Permit Coordinator: Date: la /4:1 [QO I:\Building\Forms\BldgPermitRvw_COM_WithLandUse 111819.docx Nikki Tuason From: Nikki Tuason Sent: Wednesday, September 8, 2021 3:14 PM To: ko@asf.expert Cc: #Building Permit Technicians;Agnes Lindor Subject: 14915 SW 72nd Ave Hi Ken, I'm reaching out regarding the proposed new exterior deck to the existing commercial building. Prior to submitting the building permit,you will first need to apply for a Minor Modification permit for the deck. Please see the information below regarding submitting the Minor Modification permit: Type 1 Minor Modification (MMD) A Type 1 MMD application needs all of the following submittal elements sent to TigardPlannerOnDuty@tigard- or.gov in order to be considered complete: • Completed application form with property owner signature and applicant signature: http://www.tigard- or.gov/city hall/departments/CommunityDevelopment/Master Land Use Application.pdf • Copy of the property deed • Narrative o Detailed response to the applicable code criteria in Community Development Code (CDC) 18.765.060. o Detailed summary of your proposal o If you are proposing changes to add or remove parking stalls in the parking lot... • State the number of existing off-street parking spaces and state the number of parking spaces to be added or removed • Address the applicable code criteria in Community Development Code (CDC) 18.410. o If the proposed business has a higher parking intensity than the previous business... • Then you will need to provide us with a parking count for all existing business at the site. Provide a list of tenant along with their associated address, square footage for each tenant and business type (office,restaurant, hair salon, etc.) • Site plan: o 1 copy full-sized (drawn to scale) o 1 copy reduced-sized on 8.5" x 11" or 11" x 17" paper (drawn to scale) • Architectural/elevation drawings: o 1 copy full-sized (drawn to scale) o 1 copy reduced-sized on 8.5" x 11" or 11" x 17" paper (drawn to scale) • Fee of$367. o This fee will change on July 1", 2022. Please note there is a 3% service charge for all debit and credit card payments. o We will send you a link to pay once we have received the additional materials. Thank you, Nikki Nikki Tuason Assistant Planner 1