Loading...
Permit CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT = COMMUNITY DEVELOPMENT Permit#: FPS2022-00002 Date Issued: 1/13/2022 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1 S 135A604500 Jurisdiction: Tigard Site address: 10250 SW GREENBURG RD 112 Project: Spec Space Subdivision: 1991-055 PARTITION PLAT Lot: 1 Project Description: Fire sprinkler permit-relocate(3)pendant sprinklers for new ceiling.AFFIDAVIT SUBMITTED. Contractor: MCKINSTRY COMPANY LLC Owner: LINCOLN CENTER LLC 16790 NE MASON STREET SUITE 100 BY SHORENSTEIN PROPERTIES LLC PORTLAND, OR 97230 555 CALIFORNIA ST 49TH FL SAN FRANCISCO, CA 94104 PHONE: 503-331-0234 PHONE: FAX: 503-331-6907 FEES Description Date Amount Specifics: Permit Fee-COM 01/11/2022 $67.23 12%State Surcharge-Building 01/11/2022 $8.07 Type of Use: COM Plan Review-Fire Life Safety-COM 01/11/2022 $26.89 Class of Work: ALT Type of Const: Info Process/Archiving-Sm$0.50(up to 01/11/2022 $0.50 Occupancy Grp: Height: ft 11x17) Stories: Commercial Sprinkler System: Sprinkler Required: Sprinkler Type: Wet Standpipe Required: Hazard: LT Density: 0.1 Design Area: 0 K Factor: 5.6 Commercial Fire Alarm System: Fire Alarm Required: Alarm Type: Pull Station Required: Smoke Detectors Reg: Battery Calcs Provided: Cut Sheets Required: Total $102.69 Valuations: Required Items and Reports(Conditions) Sprinkler Valuation: $1,100.00 Residential Square Footage: 0 Fire Alarm Valuation: $0.00 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: (-10-{ AJ Va-r^,De, We-ge, Permittee Signature: OwA Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Applicatio ' , n Fire Protection System FOR OFFICE USE ONLY Cityof Tigard JANq ReeeivedA Il 2� f,:l 0762022.0 02, g 4 ��C� Date/By: � �' 1 Permit No.: UPI 't 13125 SW Hall Blvd.,Tigard,OR 9722 Plan Review ffi Phone: 503.718.2439 Fax: 503.598.1rY����UNaa DateBy: !� Other Permit: TIGARD Inspection Line: 503.639.4175 v'LDI^' Date Ready/By: r ft .›, See Page 2 for Internet: www.tigard-or.gov G DIVfS10nl Notified/Method1 "1 `61. Supplemental Information TYPE OF WORK RE UIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ❑Addition/alteration/replacement El Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. El1-and 2-family dwelling Valuation: $ ElCommercial/industrial ElAccessory building El Multi-familyNumber of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 10 2 5 0 SW Greenburg Rd. New dwelling area: square feet City/State/ZIP: Portland, OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: 112 Project name: VS P Suite 112 Covered porch area: square feet Cross street/directions to job site: 4 Lincoln Center Deck area: square feet Other structure area: square feel REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Relocate (3) pendant sprinklers for new ceiling Valuation: $ 1, 100 Existing building area: square feet New building area: square feet 0 PROPERTY OWNER 0 TENANT Number of stories: Name: Shorenstein Properties Type of construction: Address: 5335 Meadows Road, Suite 275 Occupancy groups: city/state/zIP: Lake Oswego, OR 97035 Existing: Phone:(5 0 3) 412 48 4 4 Fax:( ) New: ❑ APPLICANT ❑ CONTACT PERSON NOTICE Business name: MCKinst.ry Co . LLC All contractors and subcontractors are required to be Contact name: Alex F o r k e r licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: 16790 NE Mason St . Suite 100 jurisdiction in which work is being performed.If the City/State/ZIP: Portland, OR 97230 apply: applicant is exempt from licensing,the following reasons Phone:( 97D-420-7550 Fax: :( ) E-maiLAlexF@mckinstry . com CONTRACTOR BUILDING PERMIT FEES* (Please refer to fee schedule Business name: MCKinst ry Co . LLC Permit fee: Address: 16790 NE Mason St . Suite 100 City/State/ZIP: Portland OR 97230 State surcharge(12%of permit fee): FLS plan review(40%of permit fee): Phone:( 9 71)—4 2 0—7 5 5 0 Fax:( ) (Due upon application submittal.) CCB lie.: 172811 Total permit fees: Amount received: Authorized signature: This permit application expires if a permit is not obtained i�/• within 180 days after it has been accepted as complete. Print name: d/?s eiv.44,' Date: Or/0>Aa2 * Fee methodology set by Tri-County Building Industry Service Board. I:'.Building'.Permits`.FPS-PermitApp_031016.doc 440-4613T(I I;'02;'COM,WEB) City of Tigard: Fire Protection Permit Checklist Page 2- Supplemental Information Describe work to be done: 1.) Type of Work: 2.) Addition/alteration only to sprinkler heads: 3.) Addition/alteration only to alarm devices: ❑ New system Number of sprinkler heads: 3 Number of alarm devices: ❑X Addition or X❑ 1-10 heads: Affidavit required and ❑ 1-5 devices: Affidavit required and Alteration (3) copies of sketch showing area (3) copies of sketch showing area to existing of work within building structure of work within building structure system ❑ 11+ heads: Plan review required and ❑ 6+ devices: Plan review required and (3) sets of plans. (3) sets of plans. Additional description of work: Type of System (Complete A, B, C or D as applicable): A.) Commercial Sprinkler Sprinkler Type S S P ® Wet ❑ Dry Additional Standpipes Information: Sprinkler Supply Line BS ❑ Yes ❑ No Hazard Group L i ght Density 1 Design Area K. Factor 5 . 6 Sprinkler Project Valuation) $1 , 10 0 B.) Type I - Hood Fire Suppression System Hood Project Valuation: $ C.) Fire Alarm Submittal shall Battery Calculations ❑ Yes include: Individual Component ❑ Yes Cut Sheets Fire Alarm Project Valuation: $ D.) Residential Sprinkler(Stand Alone System) Square Footage: Permit Fee: 0 to 2,000 $198.75 2,001 to 3,600 $246.45 3,601 to 7,200 $310.05 7,201 and greater $404.39 Sprinkler Project Square Footage: sq. ft. Fire Protection Permit Fees Project valuation subtotal(see A, B & C above): $ Permit fee based on project valuation (see fee schedule): $ Permit fee based on square footage (see D above): $ State Surcharge (12%of permit fee): $ FLS Plan Review (40%of permit fee): $ TOTAL: $ I:\Building\Permits\FPS_PermitApp_031016.doc 2 RECEIVE City of Tigard Permit No.: F[ 02-o0007- 1111 13125 SW Hall Blvd.,Tigard,OR 97223 JAN 4 2022 _ Phone: 503.718.2439 Fax: 503.598.19 Date Received: O(/OI4/2.O Inspection Line: 503.639.4175 Y VF I IGARD CITY 1 I.;AR I) Internet: www.tigard-or.gov BUILDING DIVISION By: GI T l 6F 71G rr -0 FIRE SPRINKLER AFFIDAVIT FOR ALTERATIONS OR TENANT IMPROVEMENTS CO (1 to 10 SPRINKLER HEADS WITHOUT PLANS) �� 1/41 Project Name: VSP Suite 112 4 Lincoln Occupancy: B Job Address: 10250 SW Greenburg Rd Type of Construction: 1-B Suite: 112 Contractor: McKinstry Phone: 971-420-7550 Number of Proposed or Altered Heads: 3 Type: Hazard: Light Density: 1.0 1, Alex Forker Oregon Construction Contractors Board No. 172811 certify the following is true and reasonably defines the scope of work for this project: a) All work is limited to drops and armovers in a light-hazard occupancy. b) Positions of sprinkler heads relative to architectural features such as soffits,beams,partitions, walls, etc. complies with current adopted edition of NFPA 13. c) The proposed work does not require hydraulic calculations. d) Only one sprinkler head will be installed from one drop (exception: up to two heads from one drop may be installed when each head is in a separate fire area). e) The area covered per sprinkler head is limited to the spacing requirements of NFPA 13. f) Tenant improvements in a new building shall be equipped with Quick Response heads (see 2002 NFPA 13, Section 8.3.3.1 for exceptions). g) The installation shall comply with the requirements of the current adopted edition of NPFA 13. h) Piping shall not be concealed until hangers and bracing are inspected. i) Final approval shall be subject to onsite tests and inspections. In addition, I understand the following is required: • Submit(3) copies of a sketch showing the area of work within the building's structure. • Building fire protection system permit. • A copy of t is document with a copy of the sketch attached shall be available for all inspections. /i 01/03/2022 Signature: Date: Print Name: Alex Forker I:\Building\Forms\FireSprinklerAffidavit_071514.docx Page 1 of 1