Loading...
Permit a CITY OF TIGARD BUILDING PERMIT "! I. COMMUNITY DEVELOPMENT Permit#: BUP2021-00279 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 1/5/2022 Parcel: 1 S135BA03303 Jurisdiction: Tigard Site address: 10500 SW CASCADE AVE Project: Lanphere Motorcycle Service Shop Subdivision: None Lot: None Project Description: TI-work includes interior demo with exterior door and storefront window. New work to include walls,doors, windows,ceiling and MEP. Relocation of shop equipment.ADA parking stalls and bike parking. Contractor: WALEN CONSTRUCTION Owner: 10500 SW CASCADE LLC 9740 SW WILSONVILLE RD SUITE 230 819 SE MORRISON ST#110 WILSONVILLE, OR 97070 PORTLAND, OR 97214 PHONE: 503-718-6680 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 01/05/2022 $2,464.95 Occupancy Grp: B Occupancy Load: 209 Demolition 12%State Surcharge-Building 01/05/2022 $295.79 Dwelling Units: 0 Plan Review 11/18/2021 $1,602.22 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 01/05/2022 $434.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 01/05/2022 $985.98 Value: $325,000 Info Process/Archiving-Lg$2.00(over 01/05/2022 $42.00 11x17) Info Process/Archiving-Sm$0.50(up to 01/05/2022 $6.00 Floor Areas: 11x17) Total Area: 0 Metro CET 01/05/2022 $390.00 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $6,220.94 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. Issued By: (\tC/v' "V`n \bojtv. Permittee Signature:CCall 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application B-I 1/i 1 '2..1 Commercial FOR OFFICE USE ONLY City of Tigard RECEIVED Received �� r'�� 0U?Zo2!-ODZ7 Date/By: �� �, L, Permit No.: -" 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review OPP Phone: 503-718-2439 Fax: 503-598-1960 Nov 2021 Date/By: —p�9 '� i Related Permit: TIGARD Inspection Line: 503-639-4175 Date Ready/By: r •• B! See Page 2 for Internet: www.tigard-or.gov CITY OF TIGARD ified/Me 1'4, t Supplemental Information BUILDING DIVISION TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. ❑X Addition/alteration/replacement ❑Other: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. Valuation: $ El1-and 2-family dwelling ElCommercial/industrial ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder ElOther: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:10500 SW Cascade Ave New dwelling area: square feet City/State/ZIP:Tigard, Oregon 97223 Garage/carport area: square feet Suite/bldg./apt.#: Project name:BL BM Service Shop TI Covered porch area: square feet Cross street/directions to job site:SW Scholls Ferry Rd Deck area: square feet 1 Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot#:3302&3303 Permit fees*are based on the value of the work performed. Tax map/parcel#:1 Si 35BA03302 & 1 S135BA03303 Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. -It tor bob Limpherc s beaverton Mobrcycies service shop.Demolition work at Valuation: $325,000 -interior with a exterior door and storefront window.New work to include walls, — doors,windows,ceilings,and M.E.P.to support new service shop work bays.Site Existing building area:S1,884 square feet `A -work includes new ADA parking stalls and bike parking.Scope to also include new — " ) and relocated shop equipment. New building area:NA square feet El PROPERTY OWNER 0 TENANT Number of stories: 1 'C? Name:Lanphere Enterprises Type of construction:VB Address:12505 SW Broadway St. Occupancy groups: City/State/ZIP:Beaverton, OR 97005 Existing: B & S-1 Phone:(503)643-5577 Fax:( ) New:NA 0 APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* (Please refer to fee schedule) Business name:Steven Eggleston W Structural plan review fee(or deposit): Contact name:AXIS Design Group Architecture & Engineering, Inc. FLS plan review fee(if applicable): Address:11104 SE Stark St. J Total fees due upon application: City/State/ZIP:Portland, OR 97216 QPhone:(503)284-0988 Fax::( ) Amount received: E-mail:stevene@axisdesigng<ou p.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* Commercial and residential prescriptive installation of CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System. Business name:Walen Construction Submit two(2)sets of roof plan with connection details and fire department access,along with the 2010 Oregon Address:9740 SW Wilsonville Rd, Suite 230 Solar Installation Specialty Code checklist. City/State/ZIP:Wilsonville, OR 97070 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)718-6680 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB Lic.:223$05 Total fee due upon application: $201.60 .v..as�...1'7,, Thispermit application Authorized signature: Steven Eggleston C. `°. pp ation expires if a permit is not obtained °"�`°�''°� "" °"° within 180 days after it has been accepted as complete. Print name:Steven Eggleston Date:10.28.2021 * Fee methodology set by Tri-County Building Industry Service Board. I:\Building\Permits\BUP_COM_PennitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT .� Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering. [1] $ 275,000.00 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 68,750.00 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking: Includes new ADA parking stalls and bike parking. $ 17,000.00 (b) An accessible entrance: $ 1,750.00 (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and alarms: $ TOTAL(shall equal line [2] of Valuation Computation): $ 18,750.00 I:\Building\Permits\BUP_COM PermitApp.doc Rev.03/05/2019 . City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 41 Plan Submittal Requirements Commercial & Multi-Family - New, Additions or Alterations T I G AR C7 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov 1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with: A. x❑ map&tax lot# ® project name Q site address ❑ suite number Q zoning 0 applicant name [] phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking, including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape-ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. { E. Reflective ceiling plan. { F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations,plans, details and specifications. J. Accessibility barrier removal worksheet. III K. Deposit-based on valuation of project. I:\Building\Permits\BUP_COM_PermitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 11111 " Plan Submittal Requirements Matrix Commercial & Multi-Family - New, Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan is required showing location and square footage of all buildings to be demolished,erosion control plan and tree protection,if applicable) Site Work 3 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 3 Fire Protection System 3 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Solar Photovoltaic 2 (Requires check list for prescriptive installation. If not prescriptive installation,engineering is required.) Plan review is dependent upon submittal of a completed application and plans. After plan review approval,the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington County, and Tualatin Valley Fire&Rescue),if applicable. t I:\Building\Permits\BUP_COI_PemutApp.doc Rev.03/05/2019 3 City of Tigard 11111 COMMUNITY DEVELOPMENT DEPARTMENT C T1cARL Building Permit Review — Commercial - No Land Use Building Permit #: P2 2/--BOZ71 Site Address: I o50.0 J ( Suite/Bldg#: Project Name: 51, 6M ,,,,, �(! 5c1fr T- (Name of commercial business occupying space. If vacant,enter Spec' Space.) P ) Planning Review f Proposal: NS J OrwPC(* &Ile5 CQrlMgrLI) cejt G4,( opida' ) o r .�er`i a v� �-S I 1 LA f rrAr-eAAA.er4,-6S Existing Business Activity: 40 .cy 4-- Proposed Business Activity: ,//, • 3, ) LA,M pki- `s 1? i 'c-4•e(/1 jc(olr`GLj o les JVerify site address/suite#exists and active in permit system. rr�l ❑ River Terrace Neighborhood: ❑ Yes K] No Zoning: M,V Permitted Use: Yes ❑ No ❑ Spec Space Confirm no land use required. pBusiness License: Exists: /6 Yes ❑ No,applicant was provided a business license application Notes: 03 MAl9 IA, ( eAe- ka-S (owe f/' fotr-(c Zvi s�c,vl_d.f&irk a o v-e,vi trsS; ela vts►�0 us _. l. 'ems,eok.P Approved by Planning: Ck `_ Date: I 6- 2® I Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: ///0//2D,2.-/ Site Plans: # 3 Building Plans: # 3 Building Permit#: T.--Enter building permit#above. Workflow Routing: E�'l:P anning 12 Permit Coordinator Er-Building Workflow Sign-off: rfr�,�Sign-off for Planning(include notes from planning review) IQ Route Application Documents: building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: '- �" Date: ////7/�Z1 I:\Building\Fom s\BldgPermitRvw_COM_No LandUse_11 1819.docx Permit Coordinator Review 'Or Conditions"Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: - SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes X N/A Tigard Trans SDC: ❑ Yes / N/A Parks SDC: ❑ Yes 4 N/A -2--OK to Issue Permit Approved by Permit Coordinator: Date: 11 (it(le 7,1 I:\Building\Fonns\B1dgPermitRvw_COM_NoLandUse_I 11819.docx