Loading...
Permit p CITY OF TIGARD BUILDING PERMIT '�1 ° COMMUNITY DEVELOPMENT Permit#: BUP2021-00293 T WARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 12/21/2021 Parcel: 1 S 135AB01003 Jurisdiction: Tigard Site address: 10300 SW GREENBURG RD 304 Project: Variant Investments Subdivision: METZGER,TOWN OF Lot: 9 Project Description: Work to include interior demo, new walls, relites and finishes. Contractor: WALEN CONSTRUCTION Owner: LINCOLN CENTER LLC 20915 SW 105TH AVE BY SHORENSTEIN PROPERTIES LLC TUALATIN, OR 97062 235 MONTGOMERY ST, 16TH FLOOR SAN FRANCISCO, CA 94104 PHONE: 503-718-6680 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: Permit Fee-Additions,Alterations, 12/17/2021 $752.04 Occupancy Grp: Occupancy Load: Demolition 12%State Surcharge-Building 12/17/2021 $90.24 Dwelling Units: 0 Plan Review 12/01/2021 $488.83 Stories: 0 Height: 0 ft Address Fee-per lot/suite(up to first 20) 12/01/2021 $50.00 Bedrooms: 0 Bathrooms: 0 DC Provision Review,COM TI-Ping 12/17/2021 $110.00 Value: $53,000 Plan Review-Fire Life Safety 12/17/2021 $300.82 Info Process/Archiving-Lg$2.00(over 12/17/2021 $8.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,799.93 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332 2344. Issued By: No-U..y VaA,De We.ge. Permittee Signature: 01,1_,A h'} ,t,t.GG4_'fZ.Ovt' Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Building Permit Application 1/ i Commercial RECEIVED FOR OFFICE USE ONLY - City of Tigard q Received // i30 2C.121 fa1// Permit N P2 �- oz9'3 13125 SW Hall Blvd.,Tigard,OR 97223 N O V 3 0 2021 Plan Review Phone: 503.718.2439 Fax: 503.598.1960 Date/By: I 13'" _ ) Other Permit: TIGARD Inspection Line: 503.639.4175 CITY OF TIGARD Date Ready/By: �� Juris: Fa See Page 2 for Internet: www.tigard-or.gov BUILDING DIVISION ified/Method: /6 a( lii Supplemental Information TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING 0 New construction ❑ Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ►1 Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1-and 2-family dwelling ®Commercial/industrial Valuation: $ ❑Accessory building 0 Multi-family Number of bedrooms: ❑Master builder 0 Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address:l Lincoln- 10300 SW'Greenburg Road New dwelling area: square feet City/State/ZIP:Tigard,OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.:393' - Project name:Variant Investments Covered porch area: square feet Cross street/directions to job site:Project located north of SW Oak Street, Deck area: square feet south of SW Locust Street and east of Greenburg Road Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: I Lot no.: Permit fees*are based on the value of the work performed. Tax map/parcel no.: Indicate the value(rounded to the nearest dollar)of all equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. Work to include demolition,new walls,relites and finishes. Valuation: $$53,000.00 Existing building area: 1472 square feet New building area: 1472 square feet ® PROPERTY OWNER ❑ TENANT Number of stories: I Name:Shorenstein Type of construction: 1-B Address:5335 Meadows Rd.,Suite 275 Occupancy groups: City/State/ZIP:Lake Oswego,OR 97035 Existing: B Phone:(503)412-4844 Fax:( ) New: B ❑ APPLICANT ® CONTACT PERSON BUILDING PERMIT FEES* Business name:Mackenzie (Please refer to fee schedule) Structural plan review fee(or deposit): Contact name:Suzie Hong FLS plan review fee(if applicable): Address:1515 SE Water Ave Suite 100 City/State/ZIP:Portland,OR 97214 Total fees due upon application: Phone:(503)224-9560 Fax::(503)228-1285 Amount received: E-mail:shong@mcknze.com PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES* CONTRACTOR Commercial and residential prescriptive installation of roof-top mounted Photo Voltaic Solar Panel System. Business name:Walen Construction Submit two(2)sets of roof plan with connection details �n and fire department access,along with the 2010 Oregon Address:20915 SW 105 Avenue Solar Installation Specialty Code checklist. City/State/ZIP:Tualatin,OR 97062 Permit fee(includes plan review $180.00 and administrative fees): Phone:(503)692-9002 Fax:( ) State surcharge(12%of permit fee): $21.60 CCB lic.:223805 Total fee due upon application: $201.60 Authorized signature: This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name:Suzie Hong Date: 11/22/21 * Fee methodology set by Tri-County Building Industry Service Board. 1:\Building\Permits\BUP-COM PermitApp.doc 02/24/2011 440-4613T(11/02/COM/WEB) Building Division Accessibility: Barrier Removal Improvement Plan TIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS)447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per-cent(25%). VALUATION: Total of all renovation,alteration or modification being done, excluding painting and wallpapering: [1] $ 53,000 MULTIPLIER(25%barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 13,250 11 ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the El following order: (a) Parking $ • (b) An accessible entrance: $ 1 (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex y, restroom: $ 1 (e) Accessible telephones: $ rF;. (f) Accessible drinking fountains:and, $ (g) When possible,additional accessible elements such as storage and ; alarms: TOTAL(shall equal line [2] of Valuation Computation): $ . P"- d,{`f I:\Building\Permits\BUP-COM PermitApp.doc 03/03/2011 r{ Si City of Tigard 114 au COMMUNITY DEVELOPMENT DEPARTMENT a TIGARD Building Permit Review — Commercial - No Land Use ot Building Permit #: al P202 ( 29 33 Site Address: I'0 -300 Sw Gki,e0DU Suite/Bldg#: Project Name: qatilttal-TAkteC-441-11/1/ (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: Tkil. 7et f Existing Business Activity: V/I Via 0 -, �f v5.�-v `g1 Ic Proposed Business Activity: !/t _ " Verify site address/suite#exists and active in permit system. Cl River Terrace Neighborhood: ❑ Yes ] No 5A Zoning: AI E---i x Permitted Use: .'II Yes Cl No ❑ Spec Space pConfirm no land use required. 7) Business License: Exists: g] Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: i4 l/ 't/JL/ut/1( Date: I/1 4 Z I Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal / Original Submittal Date: I t/ 2Q2 4 Site Plans: # /// 3 Building Plans: # Building Permit#: Er-Enter building permit#above. Workflow Routing: d'Planning ❑ Permit Coordinator Pr-Building Workflow Sign-off: Er Sign-off for Planning(include notes from planning review) Route Application Documents: P- Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: Date: ( f/ O/2G2 I:\Building\Forms\BldgPennitRvw COM NoLandUse 111819.docx Permit Coordinator Review ❑ Conditions"Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: ❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A Tigard Trans SDC: ❑ Yes ❑ N/A Parks SDC: ❑ Yes ❑ N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Forms\B1dgPermitRvw_COM NoLandUse_111819.docx