Loading...
Report (2) L,51-3 Oregon Residential Specialty Code R408.1 MOISTURE BARRIER ACKNOWLEDGEMENT FORM I, teurrt , am the general contractor or the owner-builder at the following address: Site Address: ‘,/ / tl C ii1 l b cJ W re'1il /7 City: Permit #: Subdivision/Lot#: / _ /� and/or Map and Tax Lot#: To conform with the 2017 Oregon Residential Specialty Code (ORSC), Section R408.1 Ventilation. I am notifying the building official that I have installed the Moisture Barrier as per Requirement in ORSC Section 408.1 and have taken the following steps to meet this code requireme t: The ground surface of the under-floor space is covered by a Class I vapor retarder or other approved materials,with Joints lapped 12 inches at seams and Extending up the foundation walls 12 inches. Signature: _ Date: // /41 era]Contracto or wner- u der I:\Building\Form\RES-MoistureBarrierAcknowledgement_022018 Oregon Residential Specialty Code N1107.2 HIGH-EFFICIENCY INTERIOR LIGHTING SYSTEMS Permit No.: io ylL zl` Jurisdiction: 771 Site Address: /` % c'borfs W--7 ,() N e_ -n Subdivision/Lot#: L.aztee:61 v 24,13 and/or Map and Tax Lot#: 3 By my signature below, I certify that all of the permanently installed lighting fixtures in the above mentioned building contain high-efficacy lamps. Screw-in compact fluorescent and LED lamps comply with this requirement. (Oregon Residential Specialty Code NI 107.2)1 Signature: Date: er/ eneral Contractor/Authorized Agent Print Name: U( s'('V (A_ .12V � ORSC Section N1107.2.High-efficacy lamps. All permanently installed lighting fixtures shall contain high- efficacy lamps. Screw-in compact fluorescent and LED lamps comply with this requirement. The building official shall be notified in writing at the final inspection that the permanently installed lighting fixtures have met this requirement. Exception: Two permanently installed lighting fixtures are not required to have high-efficacy lamps. l:\B ui(ding\Forms\RES-H ighEfficiencyLightingAcknowl edgement_022018 Oregon Residential Specialty Code R318.2 MOISTURE CONTENT ACKNOWLEDGEMENT FORM S 1, �`l L , am the general contractor or the owner-builder at the following address: Site Address: /L/' / 57 it, 560 J City: Permit#: 7/4 cam' 02 O Subdivision/Lot#: borfsL Gm l/ C�L� and/or Map and Tax Lot#: y To conform with the 2017 Oregon Residential Specialty Code (ORSC), Section R318.2 and OAR 918-480-0140, I am notifying the building official that I am aware of the moisture content Requirement of ORSC Section R318.2 and have taken steps to meet this code requirement. [Section R318.2 is provided for reference]. R318.2 Moisture Content: Prior to the installation of interior finishes, the building official shall be notified in writing by the general contractor that all moisture-sensitive wood framing members used in construction have a moisture content of not more than 19 percent by dry weight of dry framing members. Signature: Date: n o actor or O r-Builder C\Building\Form\RES-MoistureContentAcknowledgement_022018