Loading...
Report (2) • uponor FIRE SAFETY SYSTEMS AQUASAFETM FLOW TEST VERIFICATION FORM /-CJT 'zi)0/ AquaSAFETM Flow Test Verification Form Alliance Important:Installing contractor must submit this Member ID: y!4 '1 completed form.Failure to do so nullifies the J� j system warranty.E-mail or fax completed form Company Name: I t M..[t? f 1G(is+17%,.., to the Uponor Fire Safety Design Department Contact: 'A(/ '(,t tJ pvtets at technical.services@uponor.com or 952.997.1731. x, For questions,contact Uponor Technical Services at ��� Phone: 5 — J 77 0S 7 888.594.7726 or technical.serviices@uponor.com. Fax: Color of test orifice used: IC[A Job Name: �.�t� Pi((ri Static pressure(not flowing)reading at incoming Project Number: 206s Ic �f water supply into home or at main shutoff: 7.C" Job Address: (2.1171 Ski Residual pressure(flowing)reading at incoming water City: supply into home or at main shutoff: 6 State,ZIP: What time of day was the flow test taken? (d "4n For designs not provided by Uponor,complete the following information. Flow test method used? Bucket ❑Flow Meter Flow test gpm: I Designer's Name: t`J Company: How many gallons of water did the design predict as required? 1 -7 Phone: Did the test meet or exceed design flow? 19 Yes ❑No Fax: Which sprinkler did you flow? Number: Is the warning sign permanently attached close to the Location of head: e,t rev c-y� ?— main shutoff valve? ❑Yes ❑No Date left in service with all valves open: Was this system required by code?*Yes ❑No Test Witnessed and Verified by: Name Signature Occupation Date Additional Explanations and Notes 1) LLI Uponor,Inc. Tel:800.321.4739 5925 148th Street West Fax:952.997.1731 Apple Valley,MN 55124 USA Web:www.uponor-usa.com