Permit CITY OF TIGARD BUILDING PERMIT
E` COMMUNITY DEVELOPMENT Permit#: BUP2021 00287
Date Issued: 12/2/2021
TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1S136DCO2504
Jurisdiction: Tigard
Site address: 7301 SW DARTMOUTH ST
Project: Lumber Liquidators Subdivision: None Lot: None
Project Description: Reface existing cabinet sign,pylon sign and add new window clings.
Contractor: RAMSAY SIGNS INC Owner: AMERICAN INDUSTRIES INC
9160 SE 74TH AVE PO BOX 82850
PORTLAND, OR 97206 GOLETA, CA 93118
PHONE: 503-777-4555 PHONE:
FAX: 503-777-0220
Specifics: FEES
Description Date Amount
Type of Use: COM
Class of Work: OTR Type of Const: VB Permit Fee-Additions,Alterations, 12/02/2021 $256.22
Occupancy Grp: U Occupancy Load: 0 Demolition
12%State Surcharge-Building 12/02/2021 $30.75
Dwelling Units: 0 Plan Review 12/02/2021 $166.54
Stories: 0 Height: 0 ft Info Process/Archiving-Sm$0.50(up to 12/02/2021 $6.00
Bedrooms: 0 Bathrooms: 0 11x17)
Value: $12,000
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $459.51
Required: Required Items and Reports(Conditions)
1 Special Inspection(see plans)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332 2344
Issued By: HcruA Vag De,Wege- PermitteeSignature: on application
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Applicatio ECEIVED
Commercial v FOR OFFICE USE ONLY
NOV 18 2021 City of Tigard Received
/a P
III " 13125 SW Hall Blvd.,Tigard,OR 97223 -�OF TIGARU Plan Review1,Z121 °��'Z��GOl g 7
= Phone: 503-718-2439 Fax: 503-598-1 Date/By: 1 1"3 Related Pent
TIGARD Inspection Line: 503-639-4175 BUILDING DIVISION Date Ready : Sais El See Page2 for
-- Internet: www.tigard-or.gov Notifie o •
{{{{{ Supplemental Information
TYPE OF WORK REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
— Indicate the value(rounded to the nearest dollar)of all
®Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
Valuation: $
❑ 1-and 2-family dwelling ®Commercial/industrial
0 Accessory building 0 Multi-family Number of bedrooms:
❑Master builder ❑Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address:7301 SW Dartmouth New dwelling area: square feet
City/State/ZIP:Tigard, OR Garage/carport area: square feet
Suite/bldg./apt.#: Project name:LL Flooring Sign Replacement Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
SW 72nd Ave/SW Dartmouth Other structure area. square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision: I Lot#: Permit fees*are based on the value of the work performed.
Tax map/parcel#: Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Reface existing cabinet sign, pylon sign and add new window clings Valuation: $12000
Existing building area: square feet
New building area: square feet
® PROPERTY OWNER ❑ TENANT Number of stories:
Name:American Industries Type of construction:
Address:Michael Kaplan Occupancy groups:
City/State/ZIP: Existing:
Phone:( ) Fax:( ) New:
® APPLICANT 0 CONTACT PERSON BUILDING PERMIT FEES*
(Please refer to fee schedule)
Business name:SCOW Services Structural plan review fee(or deposit):
Contact name:Michelle Freeman
FLS plan review fee(if applicable):
Address:490 Quail Ridge Dr.Westmont. IL 60559
Total fees due upon application:
City/State/ZIP:
Amount received:
Phone:( )708-910-4895 Fax: :( )
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
E-mail:mfreeman@scoutservices.com
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System.
Business name:Ramsay Signs- Darcy Newton Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address:9160 SE 74th Ave Portland, OR 97206 Solar Installation Specialty Code checklist.
City/State/ZIP: Permit fee(includes plan review $180 00
---- and administrative fees):
Phone:( )503-680-1468 Fax:( )
State surcharge(12%of permit fee): $21.60
CCB Lie.:63422 Total fee due upon application: $201.60
Authorized signature: �� �44�'Y a .- This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name:Michelle Freeman Date:11/16/21 * Fee methodology set by Tri-County Building Industry
Service Board.
1:\Building\Permits\BUP COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB)
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
" Accessibility: Barrier Removal Improvement Plan
Commercial & Multi-Family - Additions or Alterations
TIGARD 13125•SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE(ORS)447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering. [1] $
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order:
(a) Parking $
(b) An accessible entrance: $
(c) An accessible route to the altered area: $
• (d) At least one accessible restroom for each sex or a single unisex
restroom: $
(e) Accessible telephones: $
(f) Accessible drinking fountains:and, $
(g) 'When possible,additional accessible elements such as storage and
alarms: $
TOTAL(shall equal line 12] of Valuation Computation): $
I:\Building\Permits\BUP_COM_PemutApp.doc Rev.03/05/2019