Loading...
PFI2021-00420 CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT 111111 I. , COMMUNITY DEVELOPMENT Permit#: PF12021-00420 TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 11/30/2021 Parcel: SEG3764 Jurisdiction: Tigard Site address: Subdivision: Lot: Project: PGE Job#M3017930 Project Description: PGE to install underground service to new subdivision;segs 3764,3767,3762,3763 Class of Work: FEES Type 1 -Utilities(gas, electric,data) Description Date Amount Owner: Total REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website at www.tioard-or.gov to schedule inspections online. Contractor: PHONE: • Applicant: BRIANA FOGH 2213 SW 153RD DR BEAVERTON,OR 97003 PHONE:5034634355 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See applicationN At �J Issued By: )�jj 1�U �'icw"�^^v Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PFI2021-00420 lam Condition Name: Status: 5everkv: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up. PFI_Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04-WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs,pavement markings,mailboxes,etc.shall be reinstalled or replaced,with like kind of material.Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways",U.S.Dept.of Transportation,FHWA,current edition,American Traffic Safety Services Association[ATSSA],and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices,flag persons,etc.,shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07-TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic,at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses,residents and area wide Emergency Services:503-629-0111 (Tigard Police Dept.,Tualatin Fire&Rescue)and to 503-962-8140(Tri-Met)and 503-431-2345(Tigard School District)and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.)before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times,including normal delivery service and mail service.Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m.Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m.unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property,public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080.Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules,contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary,it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARY PATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads,ditches,etc.)as may be necessary,as determined by the Inspector,to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name>at<Insert Phone#>,to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24)hours prior to commencing work,prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance,and all attachments,and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans,and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City,in advance of work performance. PFI_Utilities 22-DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports,on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments,property comers,and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24-VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion,require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector,in writing,the names and 24 hour emergency telephone number of two(2)persons who have authority to resolve problems,take corrective action and,in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector,in writing,of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry and/or easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements,including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also,any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI_Utilities 31 -OTHER Applied Notice Other City of Tigard PFI#: 2021-00420 NI ENGINEERING DEPARTMENT TIGARD Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: PGE Job # M3017930 8 TYPE 1-Franchise Utility Work Brief description of project: PGE to install underground service to performed by NWN,PGE, or utility agency new subdivision ❑ TYPE 2—ROW Sidewalk/Driveway/Sewer Work performed for the purpose of: • Sidewalk installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitary sewer lateral installation and Location (address if available): 15047 SW 81ST AVE main line tap ❑ TYPE 3—Full Scale Development Work Tigard, OR 97224 performed with land use approval which includes any of the following. • Subdivisions or Partitions APPLICANT INFORMATION • Street widening Name: PGE [Briana Fogh for Deanna Kaneshiro] • Mainline installation for sanitary- sewer, storm sewer, Tigard water, and Tigard Mailing address: 2213 SW 153rd Dr water service area City/state: Beaverton Zip: 97003 ❑ TYPE 4—Small Cell Technology 503.463.4355 ❑ TYPE 5—Tigard Triangle Phone: Email: Crewcoordination-western@pgn.com Phone: NOTE: Type 1 and 2 applications may be Contact name: Deanna Kaneshiro emailed to rowpermits@tigard-or.gov. Phone: 503.672.5437 Email: Crewcoordination-western@pgn.com CONTRACTOR INFORMATION 0 Same as applicant Name: CJ - Elkhorn Construction CCB Number: 210544 Mailing address: PO Box 2061 City/State: Sandy, OR Zip: 97055 Phone: 503.880.4388 Email: elkhorn@aol.com ENGINEER INFORMATION Name: Mailing address: City/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):$ (within the public right-of-way) Is work related to a LAND USE DECISION? ❑Yes ❑r No Case number: . • City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • Page 1 of 4 APPLICANTS NOTE: Person specified as'Applicant"shall be designated"Permittee"and shall provide financial assurance for work,if required by the city pursuant to TMC 15.04.140. * With the exception of a utility operating pursuant to a valid franchise or license with the City of Tigard,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or art agent of the owner. The owner must sign this application in the space provided or submit a written authorization with this application. Franchised or Licensed Utilities are not required to obtain the owner's signature on the application. I, the applicant,certify that: • To the best of my knowledge,all the information provided within this application package is complete and accurate. • • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted,I will exercise the rights granted in accordance with the terms and subject to all the conditions and limitations of the approval. -- Briana Fogh 11/24/2021 Applicant's or authorized agent's signature Print name Date Property owner's signature (if required) Print name Date STAFF USE ONLY Case No: PF12021-00420 Permit fee: --e' Received by: SPV Date: 11/24/2021 Approved by: gruc/ /6 Date: i lI a q/Z°L/ Notified by: Date: ll('2)1;) .26211 City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov. • 503-718-2421 • Page 2 of 4 DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PH Permit Fee.See below for calculations.Minimum of$300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PH Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. FOR STAFF USE ONLY FOR STAFF USE ONLY TYPE 4: SMALL WIRELESS FACILITY TYPE 1—3:DETAILED SUBMITTAL CHECKLIST REQUIREMENTS Does applicant have a right-of-way license? 0 Yes 0 No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): 0 Small Cell 0 Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans(sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following: items. The plans must that include: ❑Public Right-of-Way ❑Private Property ❑ Cover—Site,Vicinity,Abbreviation,Legend If equipment is to be located on private property,describe the 0 General Notes(City,Water,Sewer,etc.) type&use: 0 Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan Profile) ❑ Water Quality Facilities O Grading ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Sanitary,Water,Signage,Street Lights,etc.) ❑ Details ❑ Traffic Sight Distance ❑ Signing and Striping ❑ Street Light Plan and Photometric ❑ Engineers seal/signature O Sheet label(project land use name,revision and plan log block,dates and sheet numbers.) ❑ Engineer's Construction Estimate Additional Submittals (per land use conditions,if applicable) O Traffic Report O Storm water Drainage Calculations ❑ Geotechnical Report 0 Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwuttigard-or.gov • 503-718-2421 • Page 3 of 4 9 s«- " Y- " SI Edge of Pavement r _..... Ditch _.""- .- . . Streetlight - ��- I ; Rain nxa ,..•. ;� i ° 1 "ci '+a'1 -r NExisting House 1 r: I Existing 1 1 � 1 Driveway 01 El >< 1 17''pr ul .^ I rl 3 • S 1 1 :shop PoweeI ( 1 \I • Fire Hydrant(FH) I IY I Scale: 1=30' I I I I I 1 I TYPE 1 AND TYPE 2: NIINIUNI SKETCH REQUIREMENTS (Put N/A if not applicable) North arrow Property lines&dimensions Existing utilities locations (sewer, storm,water) Street&street names All existing structures Proposed work Existing curb or edge of pavement Utility&street light poles Existing S/W or D/W apron Slope of property Trees - City of Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 ' Page 4 of 4 PO'1N 144 1505 -BENMPROVED DEVIATION FROM RPOGE PROJECTMMIAGERI� THINK a SUBDIVISION LEGEND SAFETY 15032 a,5 NEW PGE FACILITIES TO BE INSTALLED CUSTOMER TO CALL PGE SERVICE DESK @ FIRST! SDy323 6700,TO SCHEDULE CREW STAND BY �+ s T B 2S ES$9I UNLESS OTHERWISE SPECIFIES WHLE PLUMBING INTO PD 267 VT 267 33RP-z+zsPGE TO$14210T `.'^ rT' a10.PGEPMMOUNTYWLT,WITX6a- Po PI3 277 FRONDED 81NaTALLEp BY CUSTOMER +�LY„ FAULT INDICATOR 1W1 d0 - 20161110"" SW BARNUM AVF O +no vEcDES vL'6aT,TIER 1a I 0 PROVIDEd 61NBTPLLED BV CUSTOMER �— TENSION W/LUBE:175# EN MAre.n TENSION WI LUBE:13771 575 Ala .IHETALL I#2 AL-EPRJ LT PRIMARY INI3•PVC CONDUIT PROVIDED A INSTALLED BY CUSTOMER �-' 'MO 91 / •INSTALL 1-830 AL-TX SECONDARY IN 13'PVC CONDVIT 8 E.ive6 1 �n,V A'16 PROVIDED 61NSTALLED BY CUSTOMER aT01 �11 CUSTOMER TO INSTALLT 3'PVC CONDUIT 6 STVS-UP /15Q(/%p�(.� • FOR FUTURE I TS SERVICE 6113 18031 / - , p080 8010 1S P/C CONDUIT FOR FUIIBE.(OR COLO TEMP) F2 PROVIDED a INSTALLED BY CUSTOMER I CUSTOMER TO HAVE A OPEN m SPLICE PIT AND INTERCEPT Wm, RIGHT -WAY PERMIT NOTICE Sus EXISTINGt CONDUIT y A PEAM4 FROM THE LOCAL MAT RE IS RECVRE09EFOREAN, �— INSTALLED ON M1884078 p' :D2]5 _, Y/ORNNTIE RMNR-oF-WAY MAV PERFORMED. ONLY PGE APPROVED CONTRACTORS A D CO SILL OTRSNNO NAVE MIRE arDER SPECIAL -- ---- NOTE 'r'unLnovn CUSTOMER TO INTERCEPT AGREEMENTS RTHUST WL BE ALLOWED TO WORK UNDER PORE PERMIT TIE CONTRACTOR MUST NOTIFY TIE LOCAL JUW 459051nHOURS- • IFF_XISTING CONDOR IS UNUSABLE FOR ANY REASON .16 CUSTOMER TONDUIT EP1 EXISTING 2'CONDUIT BEFORE WORN•TO BEGIN A COPY of TIE PERMIT MUST BE ON SITE. IT IS THE CUSTOMER'S RESPONSIBW TY TO EXISTING 3'CONDUIT PROVIDE&INSTALL A REPLACEMENT PRE-CONSTRUCTION MEETING I TRENCH AND CONDUIT INSPECTION sw RD4 er AF 6w cop eT PPnH YOUR PROJECT IEOUKi710 FItECONBIRUCTg16EETNa,CONTACT To C 9ERJICE 6 CE6KY1 ��_,]]O0dFi 0 I 1 PRE-CON.POEM FEND CONSTRU COORSNATOR FCq Ma PROVIDE YOUR TRENCH rn /AID18 'fiHp 161A I Tales �O'ECTMYUOER]TO IO WORIUNO DAYS PRIOR TO EXGVAnON TO COORDEUIE WE I" IHSPE le pen VT wa PGE ESR UNDERGROUND REQUIREMENTS G4.5 3 73 8277 1 PIaz • Temporary Cover on All Spellings �.IMIe+eMI Where the Customer prorldes openings for PGE equipment, PL-714 20u O slid,as a pad-maunled transformer.the Cuslomer must provide 714 SC V and Install a temporary cover.The cover must be 3/4unch marine- or BM PGE OWNED POLE 1 30'< m or exterior-grade plywood that Is 6 Inches large.than the opening PGE TO PULL 2,115 - I MEAN A025 61 POE 35 and secured wXhoul damaging the concrete.PGE WI1 remove the temporary rover during insWation of Me electneal egaipmeM. ❑TEMP TRANSFER COMM(5) 200 A I PGE PULLED. Hn6,VD 'µW10V d 4S r • ATE Gaud aroflE you do Ds6Nm 20OMHP ' aRmRl.w RaNNn.w RRawINAFvwmee ❑TOPPED TO COMM(S) 5 lEO SWAIN r nice oRmJvrMmw+wn6xcanel sm9e AFC Hg1c JFON YSTUB 1M09EgpILMr MTrgIIXwYNWrALb+e .. 13166 1016 MJ TRtlYWRS RTST W roomy,CEFAHRYEBCf 2.UAU OF n101640ORES nH MOplWIO11MIT CUSTOMER TO CALL POE SERVICE DESK -1 12DaJw >,aMA AFC TMRAFA ADIMNTRATIN'•u•ua&+lm M 1111 AN 1503323-6700.TO SCHEDULE CREW STAND BY 200A'"A _ 1pus�IBICOI laaRia wu llIDO Belem WHILE PLUMBING INTO VT 286 HNAc noN Up rM..rJy 46azw 3 z lss�ru¢ 2 CONSTRUCTION NOTES: RSDEV ft BN6 .VT-2a B 8076217 I.warOMER TOPCOTOO ALL TRENCHING/NDTACIIFUEJG JOINT USE TREND:, a :10•-IJnbIEWN 'FAPOE 0TRENCN TO SE ALLUDES DEEP A1963 INCHED WIDE MEASUtEDLRW 15200 AU.POE CONDUCTORS TO BE INSTALLED IN UMY,scTEDU E A0 ELECTRICAL 0 Pf}R5 D-280 p18 GRALE.m/L CONMrN11X0500 PULL SIRNO;1MN SMLB9 TE9n PGETO LETEFM.F ONE S.ALL ELBOWS MIRAERO14451 TS R R TO RED. 9B 15220 MANEAN 2vEMICAL NCNEE RIO zf IpIaZUJiAL INCHES CLEARANCE BEIMEEN vT-ae9 2gz 15215 PGE NL BE DS Wei BEeE�.ECTSUNV0 NAM ALLL ELBOWSLLµ RTNANTINC INCHWORM.1 BE �2016 nwm 2ERPUSOF15TIRACIUS.RIGID STEEL LONGER oRFOR vE0NIX BGTHLASS RUNImoSENDS MEpECUPFD PGE H1730-18 CARSON BOX TIER 15 CONTACT FoommoR3NRVICE COORDINATOR PUNS of,61 FEET OR DR FOE NIX LENGTH RUN MM,H MORE TITAN 3 2016 IN CHTEEa M BENOe PYL 501 OT0 neENTI AAE ACCEPTNLE FOR 0 DECT II'UrRnnATI mplMrtr P4wriµiµ�l.�R RfEETORLESa.TINE IIhILT.g1 TOL6L BEr1a91N ANY CIXIdp1 NVN1$YrO pEGREEB SW ALE LN m1e / P B CONTACT PGE FOR APPROVED MANUFACTURERS IoxecwroNpTOR' z AWE STAlORYc1EW'TS REauan FOR OPEMNO ALL 000nurED PcewuTs B01Tnnlw ORRN.6AEd416 JIINCTX)NBOXEa ANb EOVIPIIENI,FAgInEe ecupxn WNJEcnoN OR S0T#I TICK ea Tim maimi- OF CCFmurSS 00•PULL aIRMGS.CALL fiE0.41GE CooRDRMnCNAr Ws]aaaCp d FINAL GRADE E HARD S SURFACE(FLUBM N iu= VT-267 501-PGE VAULT *oa0MEA SCHEME ISBLT®YCREw S.S'.T.T2FJGE DIAMOND MATE DOOR ].CUSTpIr REPFOFJBhEFORROAD OIOaewOS.ALL CM4R MASTpEXrENO FINK GRADE IF SOFT SURFACE NOS ro BE E NOES DEEP D 3 / iaOIFROPERn NE TpppolcmruuE lSE oravour .AIEIMSK 471 0�ryySr+H 612a 12 ----- %'`tip`•i 6f/( NOTES m�WUFwi GRADE. COIpUf CASINOS B ' rTD \�:: 4r Ar lObllb! 1'OOR x�11EO1 EaMRWFm 05000 µ CfiXORE ECrTWON ET74ADE OR LWTM.E MECNµK�ALI T^` ,4 •T•••'te, - l ppn6 ��!.� ;'%'" STOP EO rr'R. cOMEEL#OPROOvc62 AC ANure 12210 TDIE FIDPE LUST FROEr HIE r ®....P b _ 11 Oro Y WAIT CM MALL 1N*4A0.FORSPSTTB�RBaw IREE DUCT eOVLI DMi 500T0 THREE E0046LY SPACE ET [["tt VVll I 1.. .. ._. P1Y rota !/ awe FxmuOEDar 91RIPEn(TVMµ�ISALA UPnCOJNR1UnoN REWRiEMIT NAHdrEL IFmK fI' 6-or N£LL COMPACTED �. A•escele ST AE WfE PIPE IB REWpEDPlE N1ny1LPoEINSPECT00.PXEEEM. p'I°' ILT* MWNDNCESOX �1IIIli�l IP I.DO NOT CROSS 6�JFIn1E11MAT rACELORE ALE Fdi PADMOIINI iRN14fORMERB EL w Gs ln..e Iwo. IR UNDER SAUCE SOX �'=_�t�• aaar u, VyeR aEN 'GuelialLTIOeEaTATFIC4.GMCE BEEOETAe AVIETCM. S'RADIUS PJEUOVN Q BGiµL MF IF &ALL POE TOAASFERSERS TO BE WTAL1ED 5 RUT M PROS µY COMB11S1RLE 8CN IIPVC wEACrORY WOE O {wp�'ILL-. FEALL- M. MLgt 1 N µy RRE NYpMNr NgMTYMAP m OO INMO nUn9FCRMER9W55XETBEVe1MMENfEE ESA peVEAMEAPEA Si LT I. .S. O A MM 1N LrMYB MLA 10 FEET CLEARANCE IN FRONT p r JLLTRMRFUEMERa. OPSNCI VNSTEEEOFPOLLUTING F%1FNp P' \ ?TO T TUVEH USER POSTS ARE REWIRED AROUND TRANSFORMERS RUT ARE EYPOSEO TRENCH BIDE VIEW vi FNDOF coNDur O C 3 �E •� PL NO SPNNUe Sr Sr &Aus0RCHVMIL 10UNOETAT RALETSW LOWS fi 0040015ITASEAem rT30 cgpDRT ESIR OTCIR rXE vµLr BIp LOWER µWCkgJTS ITENMJ.gIGr • • rr ePsi 4 PD 361 (SEE OT11 ON 6HETCN N. I R FROr LOT PUBLC arty EASEMENT IRV.EJ TOES&FEET(MN I f. IOGEET IPPEfAMEG1 WM VAULTW pr TERMg1CT6 14ESnIMTE➢OWAMPBInTgsTApTINOCURREMFdLFUC1{Fry CyGVUipHB OYES �� cH eO Pvc POLYMER COVER Prr.R�T �ro rue PETCESRYER LOAgNe Nq whTME O1NP GLgRAnIN99A9EDON on Hw FEo SLET ITHp TWNSFORME. TOR PERM Sv.^ MARKED ELECTRIC' ' allommscurouRs il tE•Ida®esnwarLHF 1LCONSULT WIN/PoEpgREERESEMCTIONC TSIET6EFCPE STARTING MRN POWER j AVPemm9 .,r \ 6 ` y.idam quae H RNA BE EXCAVAOR.PCON OE.TREE CAry µDCM&E INCI#DIN TMSCONFEREN(£ 12DE91GN N EASED ON STNIDA1N 1*445GNOLROEOSMEM IOe.rY o n E-1.• � 1 ��� V NKe� M'DE0.0RCUNDEWIPISHAT AY BE All OPOCRL Ai Nu AOpTMUL COOT TO LNE CV9iaMpi. �I TRENCH a enrsoN2/6 /1r wF.[WO DATE IIA1Rp21 SOALENTG ACCA1Jm' AWp Pm NO r pdE*114 a sUNDO I TAP/- I 10]0001 I 10D0000398 I -M3011930 WJwuF ♦L''��,-. as AKS EIghNwig&FareeHVI BELLA MEADOWS B q•e.MallA 8TIT l • STREET SIDE TOP VIEW II CACAO sr L �k1 i` 1 /E AMSATRER 17X22 y' 'f LOCATION a' ALL SECONDARY VAULTS TO BE INSTALLED ON PROPLRIY ONES WITHIN THE .� `/ 15160 SW 81 st Avenue,B9aN JOB SITE V11l1TY EASEMENT AND AT FINAL GRADE.ALTERNATE LOCATIONS MUST SE 4 .rENME6NE DESCRIPTION APPROVED BY PGE AND WILL BE NOTED ON THE SKETCH.THE COST FOR cr... _/ \j�/11 New Service Subdivision backbone only 4 LOTS RELOCATION OR ADJUSTMENT OF a SECONDARY VAULT WILL BE THE +-Ipe llw w1 A COUMV ECTICN IS I1Twe0*TO" SI$r RESPONSIBILITY OF THE BUILDER OR DEVELOPER REQUESTING THE MOVE. �I ��// BEA LINE cis,CENTER WASHINGTON IC21.I OC 1 of I eP' .. y PGE APPROVALS OF INSTALLATION WILL BE BASED ON FINK GRADE AND CENTER M MIME 1m5 o•w.n LOCATION CRITERIA SET BY THE DEVELOPER AND HIS OR HER AGENT. 111.,.n.a.CIer.OIMI ....were DEANNA KANESHIRO er. 672-543] MARIVS IACATU3U O PORTIN.IO GENERAL ELECTRIC CO..ALL ROOTS RESERVED Page 84 2011 Edition Stationary Lane Closure with Flagging Diagram 320 Diagram 320 covers total closure of one lane of a two-lane, two-way roadway. See the detail inset for the layout if using a single flagger to control both directions of traffic on low volume roads (less than 400 ADT)with good sight distance as discussed below. 1. Use truck-mounted flashing warning lights on work and protection vehicles. See Section 4.3— Lights and Lighted Signs for exceptions. 2. For added visibility, a truck-mounted arrow board or PCMS in caution mode may be used. 3. Flaggers at each approach are required if any of the following conditions exist: a. Night Operations. b. Work space is over 200 feet in length. c. Sight distance is less than 750 feet from each approach through the lane closure. d. Traffic volumes are greater than 400 ADT. 4. The length between the Flagger Ahead signs shall not exceed one mile. Use Diagram 340—Lane Closure with Pilot Car if exceeding one mile. 5. Cones should be used to outline the work space when curves or other roadway alignments prevent clear direction for the motorists to pass the work space safely. 6. Cones along the work space are recommended when posted speeds are 45 mph or greater,when working under heavy traffic or when travel lanes are narrower than 11 feet. 7. Extended queue signing (see Diagram 5-4) should be used when traffic queues extend beyond the initial advance warning sign. 8. When flagging near an intersection, the"Flagger Ahead" (CW23-2) sign should be visible to traffic entering from any side road. Additional advance warning and Flagger Ahead symbol signs may be placed on the side road(s). 9. Sign set-up and flagger placement shown may be used for intermittent full road closures of 20 minutes or less. 10. The "ONE LANE ROAD AHEAD" (W20-4)sign is optional and should be considered on high volume or high speed roads, or when extended queues are expected. Chapter 5 December 2011 2011 Edition Page 85 Stationary Lane Closure with Flagging Diagram 320 Q¢\ oo= I C ¢3Q o • cd L. 52 O I co QT co0) O a -• w W 1, t LL ma�EC • 3 Q i ,481 I e• me •• jp2 0. U • / G p 1 t _m • mam g r n if © ,_ E . �III1 Q 3 ' Ili • O : � • m 112 rn 1p0 � I •. tv F • a • — Y� • 1 • L` A O o • n x OY mQ� co awol i t Y Fn Yu I VM ,. Sign Spacing and Buffer Lengths(feet) 1 1 • o ra ERRATA: Posted Spacing Between Signs Buffer 5 c Speed A B C Spice 44. o 20 50 I r Q 0 SupplementTable 25 100 100 100 75 30 100 Updated:1ebn.ry1Z. 35 350 350 350 125 oQ¢W 2016 150 00 By.Dorn rrarenpaerey 45 180 cc a Sect1on 50 500 500 500 210 55 250 n Spacing and Buffer Lengths(feet)Supplement December 2011 Posted Spacing Between Signs "Buffer" Speed A B C Space Chapters 60 285 65 700 700 700 325 70 365 Page 118 2011 Edition Lane Closure at Intersection with Flagging Diagram 620 Diagram 620 covers work within an intersection when normal traffic control must be interrupted. Work vehicles may or may not be in the work space. 1. During flagging, traffic signals shall be turned off. Contact the road jurisdiction for approval and assistance (see Chapter 3). 2. For multi-lane facilities, traffic approaching the intersection shall be reduced to a single lane on each approach. See Chapter 3 for information on flagging through intersections. 3. There should be one flagger for each approach. One flagger may control two adjacent approaches if sight distance, low volumes on side roads, and flagger position allows for safe operation and clear direction to motorists. For low traffic volume intersections (fewer than 400 entering vehicles per day), one flagger may be used. 4. The"ONE LANE ROAD AHEAD" (W20-4) sign is optional and should be considered on high volume or high speed roads, or when extended queues may be expected. Sign Spacing and Buffer Lengths(feet) Posted SpadngBetween sgi "Buffer' Speed A B C Space 50 75 20 25 100 100 100 30 100 35 125 350 350 350 40 150 45 180 50 500 500 500 210 5S 250 60 285 65 700 700 700 325 70 365 Chapter 5 September 2016