Loading...
PFI2021-00028 City of Tigard February 11,2021 Prairie Electric 6000 NE 88th St Vancouver,WA 98665 Re: Permit No. PFI2021-00028 Dear Applicant: The City of Tigard has canceled the above referenced petmit(s) and encloses a refund for the following: Site Address: SEG2465 Project Name: Tigard High School Job No.: Refund Method: ® Check#238238 in the amount of$240.00. ❑ Credit card"return"receipt in the amount of$ Note: Please allow 2-5 days for this refund transaction to be credited to your account by the company that issued your card. ❑ Trust account"deposit"receipt in the amount of$ Comment(s): Per applicant's request as this was a duplicate permit;refund 80% of application fees paid. If you have any questions please contact me at 503.718.2430. Sincerely, Dianna Ornelas Building Division Services Supervisor Enc. 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.639.4171 TTY Relay: 503.684.2772 • www.tigard-or.gov City of Tigard Accela Refund Request This form is used for refund requests of land use, development engineering and building permit application fees. Receipts, documentation and the Bequest for Permit Action form (if applicable) must be attached to this request form. Refund requests are due to Accela System Administrator by each Wednesday at 5:00 PM. Please allow up to 3 weeks for processing of refunds. Accounts Payable willroute refund checks to Accela System Administrator for distribution to applicant. PAYABLE TO: Prairie Electric DATE: 2/6/2021 6000 NE 886' St Vancouver,WA 98665 REQUESTED BY: Dianna Omelas TRANSACTION INFORMATION: Receipt#: 432593 Case#: PFI2021-00028 Date: 1/21/2021 Address/Parcel: SEG2465 Pay Method: CreditCard Project Name: Tigard High School EXPLANATION: Per applicant's request as duplicate permit. Refund 80%of application fees paid. REFUND INFORMATION: Fee Description From Receipt Revenue Account No. Refund Example: Building Permit Fee Example: 2300000-43104 $Amount PPI Permit Fee 640-0000-43114 $240.00 TOTAL REFUND: $240.00 APPROVALS: SIGNATURES/DATE: If under$5,000 Professional Staff If under$12,500 Division Manager D. L. Orvlzla4 If under$25,000 Department Manager If under$100,000 City Manager If over$50,000 Local Contract Review Board FOR ACCELA SYSTEM ADM! ISTRATION USE ONLY Case Refund Processed: I Date: By: I:\Building\Refunds\RefundRequest.doc x 09/01/2010 CITY OF TIGARD RECEIPT ■ 13125 SW Hall Blvd.,Tigard OR 97223 503.639.4171 Project Name: Tigard HS Speed Radar Site Address: Receipt Number: 436257 - 09/04/2021 CASE NO. FEE DESCRIPTION REVENUE ACCOUNT NUMBER PAID PF12021-00028 $-240.00 Total: $-240.00 PAYMENT METHOD CHECK# AUTH CODE ACCT ID CASHIER ID RECEIPT DATE RECEIPT AMT Check 238238 DHOWSE 09/04/2021 $-240.00 Payor: Prairie Electric Total Payments: $-240.00 Balance Due: $240.00 Page 1 of 1 CITY OF TIGARD RECEIPT 13125 SW Hall Blvd.,Tigard OR 97223 503.639.4171 rr Project Name: Tigard HIS Speed Radar Site Address: Receipt Number: 432593 - 01/21/2021 CASE NO. FEE DESCRIPTION REVENUE ACCOUNT NUMBER PAID PF12021-00028 PFI Permit Fee 640-0000-43114 $300.00 Total: $300.00 PAYMENT METHOD CHECK# AUTH CODE ACCT ID CASHIER ID RECEIPT DATE RECEIPT AMT Credit Card 7275569 PUBLICUSERO 01/21/2021 $300.00 Payor: Total Payments: $300.00 Balance Due: $0.00 Page 1 of 1 City of Tigard • COMMUNITY DEVELOP-HENT DEPARTib1ENT r Request for Permit Action 13125 SW Hall Blvd. - Tigard, Oregon 97223 • 503-718-2439 • wtivw. 't>»rd tar �� TO: CITY OF TIGARD �4/ Building Division 29/ 13125 SW Hall Blvd.,Tigard, OR 97223 Phone: 503-718-2439 Fax: 503-598-1960 TigardBuildingPerrnits@tigard-or.gov FROM: ❑ Owner Q Applicant ❑ Contractor ❑ City Staff Check(✓)one REFUND OR Name: INVOICE TO: (Business or Individual) n�12t� E L-E T12- te 00a ti Mailint� 22E Address: Ia�PS IJt City/State/Gip: V7kr-v t,1& wp, Phone No.: 3bo, 4i-73.2'I50 PLEASE TAKE ACTION FOR THE ITEMS) CHECKED (✓): Q CANCEL/VOID PERNIIT APPLICATION. REFUND PERMIT FEES (attach copy of original receipt and provide explanation below). ❑ INVOICE FOR FEES DUE (attach case fee schedule and provide explanation below). Permit #: - 00028 Site Address or Parcel #: SE.Cn7-t4(a lbA%2-13 Project Name: -UCiARD r{lc li SGl1Mlr Subdivision Name: NUC Lot#: EXPLANATION: WE RAO c OTT-EQ A t1i toovEr%SE�7-07-0 pwtN Y Nts?sTrtr7�.Ya��r UYL.Do2Ev� � crtME ON;✓�X'IF..h+� o� SJRMLi'S"R3i� 1�TR/(�� Co�JTp-OL PVo� Wilt T--M_S-Crso rnr� ou Ts lJl7C ,2 �T-t trvL-" 4?0 ye Signature: . I Date: 1,,L% 21 Print Name: .-,t0,,,/u Refund Policy 1. The city's Communiry Development Director,Building Official or City Engineer may authorize the refund of: • Any fee which was erroneously paid or collected. • Not more than 80%of the application or plan review fee when an application is withdrawn or canceled before review effort has been expended. • Not more than 80%of the application or permit fee for issued permits prior to any inspection requests. 2. All refunds will be returned to the original payer in the form of a check via US postal service. 3. Please allow 3-4 weeks for processing refund requests. FOR OF1410E USE ONLY Route to Svs Admin: Date I B Route to Records: Date // By Refund Processed: Date By Invoice Processed: Date Br Permit Canceled: Date By Parcel Ta Added: Date B I:\l3uilding\Forms\RegPcnnivlctinn_1 OS 8.doc CITY OF TIGARD PUBLIC FACILITIES IMPROVEMENT PERMIT s COMMUNITY DEVELOPMENT Permit#: PF12021-00028 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2421 Date Issued: 01/21/2021 Parcel: SEG2465 Jurisdiction: Tigard Site address: Subdivision: Lot: FJl Project: Tigard HS Speed Radar V a Project Description: add solar-powered speed radar at Tigard HS Class of Work: FEES Type 1 - Utilities (gas, electric, data) Description Date Amount PFI Permit Fee 01/21/2021 $300.00 Owner: Total $300.00 REQUIRED INSPECTIONS Call 503-639-4175 for the IVR inspection request line or visit the City of PHONE: Tigard website atwww.lioard-or,aov to schedule inspections online. Contractor: PHONE: Applicant: WALLY HALBERG 6000 NE 88TH ST VANCOUVER, WA 98665 PHONE: 3605732750 Please sign below to indicate acceptance of conditions and return a copy with the proposed work schedule along with names and contact information of responsible parties before beginning work. Permittee/Applicant Signature: See application Issued By: Special Conditions(See Attached) Note:THIS PERMIT DOES NOT COVER WORK ON PRIVATE PROPERTY Conditions for PF12021-00028 Type: Condition Name: Status: Severity: PFI_Utilities 01 -WORK SITE REQUIREMENTS Applied Notice Applicant must comply with all applicable provisions of federal and state law,the Tigard Municipal Code, and the terms of any agreement with the City of Tigard regarding work to be done pursuant to this permit. PFI_Utilities 02-WORK SITE AREA Applied Notice The work area and approach roads shall be maintained in a clean condition,free from obstructions and hazards. The spreading of mud or debris or storage of materials or equipment of any kind upon any public roadway is strictly prohibited and violation shall be cause for immediate cancellation of the permit. The City may at any time order immediate clean-up and suspension of work to accomplish clean-up- PFI—Utilities 03-WORK SITE EROSION CONTROL Applied Notice Prior to starting work,effective and approved erosion control devices must be installed and maintained meeting the Clean Water Services and DEQ requirements. The City may at any time order corrective action and suspension of work to accomplish effective erosion control. PFI_Utilities 04 -WORK SITE REPAIRS Applied Notice Disturbed landscaped areas shall be restored or replaced. Existing signs, pavement markings, mailboxes, etc. shall be reinstalled or replaced,with like kind of material. Obtain City approval of restoration work. PFI_Utilities 05-TRAFFIC CONTROL SPECIFICATIONS Applied Notice Applicant shall provide traffic control according to the current edition of the"Manual on Uniform Traffic Control Devices [MUTCD]for Streets and Highways", U.S. Dept. of Transportation, FHWA,current edition,American Traffic Safety Services Association [ATSSA], and Oregon Temporary Traffic Control Handbook[OTTCH]. PFI_Utilities 06-TRAFFIC CONTROL PLAN Applied Notice Submit a job specific traffic control plan. A copy of the approved traffic control plan shall be readily available at the work area. Traffic control devices,flag persons, etc., shall be in place prior to initiation of construction work and shall be effectively maintained. PFI_Utilities 07 -TRAFFIC CONTROL ROAD CLOSURE Applied Notice Public roadway shall not be closed to traffic, at any time,without obtaining written approval from the City Engineer. The applicant is responsible to provide 48 hour advance notice of traffic flow disruptions to affected businesses, residents and area wide Emergency Services:503-629-0111 (Tigard Police Dept., Tualatin Fire& Rescue)and to 503-962-8140 (Tri-Met) and 503-431-2345 (Tigard School District) and other service providers impacted by such closure. PFI_Utilities 08-TRAFFIC CONTROL ADVANCE WARNING Applied Notice Advance warning of traffic disruption shall be provided to the public by placement of an approved advance notification sign at each end of the construction area 72 hours(min.) before initiation of construction work. PFI_Utilities 09-TRAFFIC CONTROL PROPERTY ACCESS Applied Notice Access to existing properties shall be maintained at all times, including normal delivery service and mail service. Obtain City approval of any access closures. PFI_Utilities 10-TRAFFIC CONTROL WORK HOURS Applied Notice Work is permitted in daylight between the hours of 7:00 a.m.to 7:00 p.m. Mon-Fri unless otherwise authorized by the City. PFI_Utilities 11 -TRAFFIC CONTROL LIMITED WORK HOURS Applied Notice Hours of construction work on collector and arterial roads will be limited to 9:00 a.m.to 3:00 p.m. unless authorized by the City Engineer. Work will not be permitted on collector and arterial roads between 3:00 p.m.to 9:00 a.m. unless authorized by the City Engineer. PFI_Utilities 12-TRAFFIC CONTROL MODIFICATION Applied Notice The City reserves the right to add to or modify traffic control requirements as necessary to effectively control traffic and to assure public safety. PFI_Utilities 13-DRAINAGE CONTROL Applied Notice Drainage shall be controlled within the work site and shall not adversely affect adjacent private property, public property and the receiving system. The City may at any time order corrective action and suspension of work to accomplish effective drainage control. PFI_Utilities 14-UTILITY NOTIFICATION Applied Notice Oregon law requires following the rules adopted by the Oregon Utility Notification Center. Said rules are set forth in OAR 952-001-0100 through OAR 952-001-0080. Copies of said rules may be obtained from the Center by calling 503-246-1987. If you have any question about the rules, contact the Center. NOTE: Damage to utilities shall be corrected at the permit holder's expense. PFI_Utilities 15-UTILITY LOCATION CONFLICT Applied Notice Applicant must verify all existing utilities for both vertical elevation and horizontal location prior to start of work(pothole before digging if necessary). Should conflicts arise and redesign or relocation of facilities be necessary, it shall be done at the applicant's expense. Changes must be approved by the City in advance of work.Applicant shall coordinate the work with affected utility agencies. PFI_Utilities 16-TEMPORARYPATCH Applied Notice A temporary hard-surface patch shall be placed on trenches within roadways at the end of each work shift. Obtain advance approval of patching method. No trench shall be left at any time in an un-safe condition. Applicant is responsible for and is liable for hazards or damage resulting from the prosecution of the work. PFI_Utilities 17-REPAIR OF EXISTING FACILITIES Applied Notice Work under this permit shall include repair of existing facilities(roads, ditches, etc.) as may be necessary, as determined by the Inspector, to overcome deterioration or damage which occurred in conjunction with the work authorized by the permit. Corrective work shall be done at the applicant's expense. PFI_Utilities 19-PRECONSTRUCTION MEETING Applied Notice Before initiating any construction activity,the applicant shall coordinate with the City's inspector, <Insert Name> at<Insert Phone#>, to establish a preconstruction meeting. PFI_Utilities 20-NOTICE TO COMMENCE WORK Applied Notice The applicant shall notify the City's Inspector twenty-four(24) hours prior to commencing work, prior to any staged inspection, and after completing work covered by the permit. PFI_Utilities 21 -PERMIT/PLAN ON SITE Applied Notice A copy of the permit including a Certificate of Insurance, and all attachments, and a copy of the approved construction plan and all amendments shall be readily available at the work area. All work shall conform to the permit terms,conditions and provisions and to the City approved permit plans, and approved plan amendments and to the City's standards and specifications and to these General Conditions. Changes to any of these must be approved by the City, in advance of work performance. PFI_Utilities 22 - DAILY INSPECTION REPORTS Applied Notice Applicant shall submit daily inspection reports, on a weekly basis,to the City's Inspector. PFI_Utilities 23-MONUMENT PROTECTION Applied Notice Existing monuments, property corners, and survey markers shall be protected. Replacement shall be at the permit holder's expense. PFI_Utilities 24 -VALIDATION OF MATERIAL/CONSTRUCTION Applied Notice The City's Inspector may, at his discretion, require tests and or reports from the applicant to validate claims of material or construction adequacy/compliance. Such tests/reports shall be provided at the applicant's expense. PFI_Utilities 25-EMERGENCY CONTACTS Applied Notice Provide to the City inspector, in writing,the names and 24 hour emergency telephone number of two (2) persons who have authority to resolve problems, take corrective action and, in general,will be responsible in case of any emergency. The applicant shall notify the City Inspector, in writing,of any/all assignment changes. PFI_Utilities 26-RIGHT OF ENTRY/EASEMENTS Applied Notice Applicant to obtain proper right-of-entry andlor easements prior to starting work. Proof of right-of-entry or properly executed easements, shall be provided to the City. The City shall in no way be construed to be liable for the applicant's failure to obtain or provide for proof of right-of-entry or easements. PFI_Utilities 27-PRIVATE PROPERTY AGREEMENTS Applied Notice Provide the City a copy of an executed agreement[s]from the owner for each private property disturbed by construction activity. PFI_Utilities 28-AS-BUILT DRAWING Applied Notice 1,2,3,4,5 28-AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). 1,2,3,4,5 28 -AS-BUILT DRAWING One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and, also, any improvement which may impact an existing public system or facility, shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance (Certificate of Compliance). One as-built drawing showing all new public improvements, including any revision made to the previously approved construction plans and,also, any improvement which may impact an existing public system or facility,shall be provided to the City by a registered civil engineer along with an engineer's certification of installation compliance(Certificate of Compliance). PFI—Utilities 31 -OTHER Applied Notice Other PF12021-00028 City ofTigard pla #:[Enter PFI Number] ENGINEERING DEPARTMENT Public Facilities Improvement (PFI) Permit PROJECT INFORMATION TYPE OF WORK Project name: Tigard HS Renovation& Mdirion • TYPE 1—Franchise Utility Work Brief description of project: Renovation &Addition, adding the solar performed byNWN,PGI', or utility agency Speed radar TYPE 2—ROW Sidewalk/Driveway/Utility Work performed for the purpo.c oF. (Type herel • Sidewalk/Curb installation or repair • Driveway approach installation and repair SITE INFORMATION • Sanitarv/Sturm/Water lateral service Location (address if available): 9000 S1`('Durham ltd installation and main fine tap • TYPE 3—Work performed with/without Tigard OR 97224 land use approval which includes any of the following: • Subdivisions and Partitions APPLICANT INFORMATION • Water Infrastructure Name: Prairie Electric • Street Widening Mailing address:6000 NE 88th Street _ • Sanitary or Storm Sewer Infrastructure • TYPE 4—Small(:cU'1'cthnology City/State: Vancouver,WA Gip:_98665 • TYPE 5—Tigard Triangle Phone:_360.573.2750 Email:_emmylou@prairielectric.com Phone:_360.573.2750 NOTE: 'Type 1 and 2 applications may be emailed to rowrennitslFAtjlptrd-or.eKoe. Contact name: Wally Halberg Phone:_360.573.2750 Ismail: wallyhgprairielectric.com CONTRACTOR INFORMATION ❑ Same as applicant Name: _Prairie Electric Inc CCB Number._60178 Mailing address:_6000 NE 88th Street City/State:_Vancouver WA_ Zip:,98665_ Phone: 360.573.2750 Email: emmylou@prairielectric.com ENGINEER INFORMATION Name: Mailing address: Cit}'/State: Zip: Phone: Email: ADDITIONAL INFORMATION Estimated value of work is required(if over$5,000):5 (within the public right-of-way) Is work related to a LAND USE DECISION? ❑Yes ❑No Case number: City ofTigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • www.tigard-or.gov • 503-718-2421 Page 1 of4 APPLICANTS NOTE: Person specified as"Applicant"shall be designated"Permittee"and shall provide financial assurance for %vork,if required by the city pursuant to TMC 15.04.140. With the exception of a utility tgxrating pursuant to a valid franchise or license with the City of Ti}0W,when the owner and the applicant are different people,the applicant must be the purchaser of record or a lessee in possession with written authorization from the owner or an agent of the owner. The owner must sign this application in the space provided or submit a written authorim ion with this application. Franchised or licensed Utilities are nor required to obtain the owner's silmaturc on the application. I, the applicant,certify that. • To the best of my knowledge,all the information provided within this application package is complete and accurate. • The above request does not violate any recorded deed restrictions that may be attached to or imposed upon the subject property. • If the application is granted, I will exercise the rights granted in accordance with the terms and subject to all the conditio s and limitations of the approval. 149-4 Bill Halberg 01/15/2021 Applicant's or authorized agent's , ature Property owners signature (f required) Print name Date STAFF USE ONLY Case No: PF12021-00028 Permit fee: '300.00 Received by: HPollard Date:1119191 Approved by: 7'y�/S_ Date: 1/2+/2 Z Notified by: Art— Date!QI 2112D21 City&Tigard • 13125 SW Hall Blvd. • Tigard,Oregon 97223 • wwwtigard-or.gov • 503-718-2421 • PlWv2ol4 W r DEVELOPMENT ENGINEERING FEES Public Facility Improvement(PFI)Permit: INITIAL PFI PERMIT FEE Part 1: Required submittal fee is 10%of the Net PFI Permit Fee.See below for calculations.Minimum of 5300. NET PFI PERMIT FEE Part 2: All non-water system improvements engineer's estimate X 7%(less the initial PFI Permit Fee). WATER LINE CONSTRUCTION FEE Part 3: All public water system improvements engineer's estimate X 12%. O. STAFF USE ONLY FOR STAFF USE ONLY DETAILED SUBMITTAL TYPE 4: SMALL WIRELESS FACILITY REQUIREMENTS CHECKLIST Does applicant have a right-of-way license? ❑Yes ❑No TYPE 1 AND TYPE 2-Must include a sketch showing: Under the wireless facilities standards,is the proposal ❑ Dimensions considered?(check all that apply): ❑Small Cell ❑Macro ❑ Street Name How many install sites are proposed as part of this permit ❑ Site Address application? TYPE 3-Must provide 4 sets of plans(sized 24 x 36 or 22 x 34) and an electronic version of all submittal The proposed equipment is located on which of the following. items. The plans must that include: ❑Public Right-of-Way ❑Private Propertyr ❑ Cover—Site,\rarity,Abbreviation,Legend If equipment is to be located on private property,describe the ❑ General Notes(City,Water,Sewer,etc.) type&use: ❑ Street(Plan,Profile) ❑ Water,Storm and Sanitary(Plan,Profile) ❑ Water Quality Facilities ❑ Grading Is this a Capital Improvement Project(CIP)? ❑Yes ❑No ❑ Landscaping/Tree Plan ❑ Composite Utility Plan(Electrical,Phone,Gas, Storm, Is this permit associated with a Capital Improvement Project Sanitary,Water,Signage,Street Lights,etc.) (CIP)? ❑Yes ❑No ❑ Details ❑ Traffic Sight Distance PFI permit# ❑ Signing and Striping Will this permit require erosion control? ❑ Street I.ighr Plan and Photometric ❑Yes 11 No ❑ Engineer's Seal/Signature ❑ Sheet Label(project Land Use name,revision and plan log block,dates,and sheet numbers.) Blank for future use: ❑ Engineer's Construction Estimate ❑Available Space ❑Available Space Ad&donalSubtnittals Blank for future use: (per Land Use conditions,if applicable) ❑ Traffic Report ❑ Stormwater Drainage Calculations ❑ Geotechnical Report ❑ Preliminary Access Report(Sight Distance) ❑ Proposed Plat ❑ Pathway Design ❑ Water Provider Approval CityofTigard • 13125 SW Hall Blvd. Tigard,Oregon 97223 • wwwtigard-ongov • 503-718-2421 • Page 3 of4 TRAFFIC CONTROL PLAN FOR SPEED FEEDBACK SIGN REPLACEMENT xueu .oeX need c� b SW DURHAM RD P .•H'• ........ Pwwareceoew AL w• c )S TIGARD HIGH SCHOOL yW� coxa Y uv Y Nr.�-ww.PrwM • Xtw Notes Mel•w'kW 2Mrbiit$Mnmem bre wN�la was 4eRx el eX�nms 9 CmeSpq"N=fid Nu _. 3 N Verte mn4tl YUP tlMIP m cwenl MIIIL080TLLH�,v.. 1 IquA W M1eb mMxms