Permit Support Document City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
1 ! " Accessibility: Barrier Removal Improvement Plan
,� m
Commercial & Multi-Family - Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241.
(1) Every project for renovation,alteration or modification to affected buildings and related
facilities shall be made to insure that the path of travel to the altered area and the restroom,
telephones and drinking fountains are readily accessible to individuals with disabilities unless
such alterations are disproportionate to the overall alterations in terms of cost and scope.
(2) Alterations made to the path of travel to an altered area may be deemed disproportionate to
the overall alteration when the cost exceeds twenty-five percent(25%).
VALUATION: Total of all renovation,alteration or modification being done,
excluding painting and wallpapering: [1] $ 35 A
MULTIPLIER(25%barrier removal requirement): x .25
TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ 8 75,0 0
ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given
to those elements that will provide the greatest access. Elements shall be provided in the
following order: �p
(a) Parking $ T ' fr
(b) An accessible entrance: $ Ip•lov
(c) An accessible route to the altered area: $ P'Ofi
(d) At least one accessible restroom for each sex or a single unisex
restroom: $ 0 f Of
(e) Accessible telephones: $ fr 1 g/,
(f) Accessible drinking fountains: and, $ p,r
(g) When possible,additional accessible elements such as storage and
alarms: $ fi •510
TOTAL(shall equal line [2] of Valuation Computation): $
7n - 4i26 /00 4-CC6-55 !$S v -$
w / rN 7 S )ice 16.c7
•
I:\Building\Permits\BUP_COM_PemvtApp.doc Rcv.12/18/2014
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
II C Plan Submittal Requirements
Commercial & Multi-Family - New, Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
1. SITE PLAN (3) copies - fully dimensional, drawn to scale and labeled with:
A. ❑ map&tax lot# ❑ project name ❑ site address ❑ suite number
0 zoning ❑ applicant name ❑ phone number
B. North arrow.
C. Scale (architectural or engineering only).
D. Street names.
E. Setbacks.
F. Parking,including disabled access.
G. Finished floor elevations.
2. EROSION CONTROL PLANS AND DETAILS.
3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of
plans required based on submittal type (no redlines or tape-ons accepted).
All details listed below shall be incorporated into the plans:
A. Scale (architectural or engineering only).
B. Foundation plan.
C. Floor plan(s).
D. Cross sections.
E. Reflective ceiling plan.
F. Seismic bracing detail for suspended ceiling.
G. Roof plan.
H. Exterior elevations.
I. Structural calculations,plans, details and specifications.
J. Accessibility barrier removal worksheet.
K. Deposit-based on valuation of project.
4. ADDITIONAL INFORMATION AS FOLLOWS:
A. Fire Department Building Survey with (1) additional full set of architecture
drawings.
1:\Building\Permits\BUP_COM_PermitApp.doc Rev.12/18/2014
Aisomminue
City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT
Plan Submittal Requirements Matrix
Commercial & Multi-Family - New, Additions or Alterations
TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov
Type of Submittal # of Plans
(Includes new, additions and alterations.) Required at
Submittal
Demolition Permit 2
(site plan is required showing location and square footage
of all buildings to be demolished,erosion control plan and
tree protection,if applicable)
Site Work 3
(must include location of all accessible parking)
Plumbing (site utilities) 2
Building 3
Fire Protection System 3
Mechanical 2
Plumbing (building fixtures) 2
Electrical 2
Solar Photovoltaic 2
(Requires check list for prescriptive installation. If not
prescriptive installation,engineering is required.)
Plan review is dependent upon submittal of a completed application and plans.
After plan review approval, the Plans Examiner will contact the applicant to request
additional sets of plans for distribution purposes (for contractor, City of Tigard,Washington
County, and Tualatin Valley Fire &Rescue),if applicable.
I:\Building\Permits\BUP_COM_PcrmitApp.doc Rev.12/18/2014
City of Tigard
a COMMUNITY DEVELOPMENT DEPARTMENT
ill I
T1cARD Building Permit Review — Commercial - No Land Use
Building Permit #: &6?00---e?90.2 )
Site Address: //q „ 'z4) ,,- ,,; ,' C Suite/Bldg#: /0 0
Project Name: 4,2e
(Na e f commercial business occupying the space. If NicAant,enter Spec Space.)
Planning Review ll II /� /� /
Proposal: PGA _ >h1 �Q-e'Akn) Gt /k 7 C,'fP Y1 l L_) -Y" ii 7`
S' c
Existing Business Activity: OgC...e
Proposed Business Activity: , ,c _s i 'c-
II Verify site address/suite# exists and active in permit syst
11110''ver Terrace Neighborhood: ❑ Yes 2 No
Ii oning: 42 (2Z"
rmitted Use: Yes
❑ No ❑ Spec Space
Confirm no land use required.
1101:usiness License:
Exists: ❑ Yes ❑ No,applicant notified to obtain business license
Notes:
Approved by Planning: � Date: 4p/e
Revisions (after Building Submittal only) Reviewer Date
Revision 1: E Approved ❑ Not Approved
Revision 2: El Approved ❑ Not Approved
Revision 3: ❑ Approved El Not Approved
Building Permit Submittal
Original Submittal Date: ,2 i 17/
Site Plans: #
Building Plans: # 3
Building Permit#: }J Enter building permit#above.
Workflow Routing: [ -Planning P.Permit Coordinator ulding
Workflow Sign-off: ❑ Sign-off for Planning(include notes from planning review)
Route Application Documents: ❑ Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: AZ-- p&y�,tk �j^A Date: 2/ ZY
L:\Building\Forms\BldgPennitRvw_COM_NoLandUse_060116.docx
Permit Coordinator Review
❑ Conditions"Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
C Fees Entered: Wash Co Trans Dev Tax: ❑ Yes �N/A
Tigard Trans SDC: ❑ Yes N/A
Parks SDC: El Yes )21'N/A
:bK to Issue Permit
(JApproved by Permit Coordinator: 40l "ate: 02- t /41 --
I:\Building\Fonns\BldgPermitRvw_COM_NoLandUse_070915.docx