Loading...
Report Cityof Tigard DECEIVED g SEP 202 ° Building Division CITY OF TIGARD 13125 SW Hall Blvd,Tigard,OR 97223 Phone: 503.718.2439 Fax: 503.598.1960 3UILDING DIVISION TIGARD Inspection Line: 503.639.4175 www.tigard-or.gov 2010 Oregon Solar Installation Specialty Code Check List for Prescriptive Installation of Roof-Mounted PhotoVoltaic Solar Panel System Property Information Installation Address: 12084 Sw Whistler's Loop City: Tigard, OR Zip: 97223 Owner's Name:Nathan Roberts Date: 9.1 .21 Contractor's Name:TML International LLC CCB #: 223690 Design Parameters of the Property/Structure If"Yes", does not Flood Hazard Is the installation ❑ Yes qualify for the Located in a flood prescriptive path, follow Area plain/flood way? ❑■ No OSSC or ORSC for design requirements. Is the wind exposure Yes If"Yes", qualifies for Wind Exposure "C" or less? ❑ No the prescriptive path. Installations on detached is the Ground Snow single/two-family Load 70 psf or less? dwelling/single/two- If"Yes", qualifies for family townhomes ❑■ Yes the prescriptive path. and/or their accessory Ground structures. ❑ No Snow Load Is the Ground Snow Installations on all Load 50 ps r less? If"Yes", qualifies for structures other than Yes the prescriptive path. above ❑ No I IlBuilding/Forms/PhotoVoltaic-Checkli st02-0I-I I.docx Is the construction Yes Type of material wood and does If"Yes", qualifies for the construction qualify ❑ No the prescriptive path. Construction as"conventional light frame"construction? Is the spacing 24 inches or less? If"Yes", qualifies for Pre-engineered trusses. EU Yes the prescriptive path. ❑ No Roof framing members Is the spacing 24 inches or less? Nominal lumber. El Yes If"Yes", qualifies for the prescriptive path. ❑ No Is the combined weight ❑■ Yes of the PV modules and If"Yes", qualifies for racking less than or ❑ No the prescriptive path. Solar equal to 4.5 psf? installation Is the solar installation ❑ layout in accordance Yes If"Yes", qualifies for with Section 305.4(3) of ❑ No the prescriptive path. the 20l0 Oregon Solar Code? ❑ Metal Single layer If roofing material is Roofing Check the type of ❑ of wood one of the three types material roofing material shingle/shake checked, qualifies for Max.two layers the prescriptive path. ❑■ of composition shingle. Is the roof mounted ❑■ Yes Connections of solar assembly If"Yes", qualifies for the solar assembly connected to roof ❑ No the prescriptive path. to the roof framing or blocking directly? 2 I:/Building/Forms/PhotoVoltaic-Checklist02-01-11.docx