Report Cityof Tigard DECEIVED
g SEP 202
° Building Division CITY OF TIGARD
13125 SW Hall Blvd,Tigard,OR 97223
Phone: 503.718.2439 Fax: 503.598.1960 3UILDING DIVISION
TIGARD Inspection Line: 503.639.4175
www.tigard-or.gov
2010 Oregon Solar Installation Specialty Code
Check List for Prescriptive Installation of Roof-Mounted
PhotoVoltaic Solar Panel System
Property Information
Installation Address: 12084 Sw Whistler's Loop
City: Tigard, OR Zip: 97223
Owner's Name:Nathan Roberts Date: 9.1 .21
Contractor's Name:TML International LLC CCB #: 223690
Design Parameters of the Property/Structure
If"Yes", does not
Flood Hazard Is the installation ❑ Yes qualify for the
Located in a flood prescriptive path, follow
Area plain/flood way? ❑■ No OSSC or ORSC for
design requirements.
Is the wind exposure Yes If"Yes", qualifies for
Wind Exposure "C" or less? ❑ No the prescriptive path.
Installations on detached is the Ground Snow
single/two-family Load 70 psf or less?
dwelling/single/two- If"Yes", qualifies for
family townhomes ❑■ Yes the prescriptive path.
and/or their accessory
Ground structures. ❑ No
Snow Load Is the Ground Snow
Installations on all Load 50 ps r less?
If"Yes", qualifies for
structures other than
Yes the prescriptive path.
above ❑
No
I
IlBuilding/Forms/PhotoVoltaic-Checkli st02-0I-I I.docx
Is the construction
Yes
Type of material wood and does If"Yes", qualifies for
the construction qualify ❑ No the prescriptive path.
Construction as"conventional light
frame"construction?
Is the spacing 24 inches
or less?
If"Yes", qualifies for
Pre-engineered trusses. EU Yes the prescriptive path.
❑ No
Roof framing
members Is the spacing 24 inches
or less?
Nominal lumber. El Yes If"Yes", qualifies for
the prescriptive path.
❑ No
Is the combined weight ❑■ Yes
of the PV modules and If"Yes", qualifies for
racking less than or ❑ No the prescriptive path.
Solar equal to 4.5 psf?
installation Is the solar installation ❑
layout in accordance Yes If"Yes", qualifies for
with Section 305.4(3) of
❑ No the prescriptive path.
the 20l0 Oregon Solar
Code?
❑ Metal
Single layer If roofing material is
Roofing Check the type of ❑ of wood one of the three types
material roofing material shingle/shake checked, qualifies for
Max.two layers the prescriptive path.
❑■ of composition
shingle.
Is the roof mounted ❑■ Yes
Connections of solar assembly If"Yes", qualifies for
the solar assembly connected to roof ❑ No the prescriptive path.
to the roof framing or blocking
directly?
2
I:/Building/Forms/PhotoVoltaic-Checklist02-01-11.docx